Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
Mansfield ISD | DP Morris Elementary School Renovation in Arlington, TX
7900 Tin Cup Drive, Arlington, TX, 76001
Mansfield ISD | DP Morris Elementary School Renovation is a renovation/alteration project at 7900 Tin Cup Drive, Arlington, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Aug 2026 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $598K across about 22,600 sq ft.
- Estimated project value
- $598K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 22,600 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $26/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 6 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
56 days after the preceding date shown.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
108 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
60 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Mansfield ISD | DP Morris Elementary School Renovation
The Mansfield ISD | DP Morris Elementary School Renovation at 7900 Tin Cup Drive in Arlington is a 22,600 sq ft project with an estimated cost of $597,803. Mansfield ISD is the owner of record, and the work is classified as a renovation or alteration. The project is located in Tarrant County and involves public funds.
Project Scope and Design
Huckabee serves as the design firm of record for this initiative. The registered accessibility specialist is Ross A Thomas. The filing describes the scope of work specifically as the Mansfield ISD | DP Morris Elementary School Renovation. This project is part of a broader series of improvements by the district, which has six other TDLR-registered projects totaling $19,256,399.
TDLR completed plan review in June 2026, and construction was scheduled to finish in August 2026. The construction start date per the filing is March 2026. TDLR has not yet recorded a final inspection, so the current state of the site is not confirmed in the public record. The status is listed as Review Complete.
Cost and Market Context
The estimated cost of $597,803 is above the county median for renovation and alteration filings in Tarrant County, which stands at $250,000. The scheduled build window of 168 days is longer than the county median of 92 days. However, the computed cost of $26 per square foot is below the county median of $79 per square foot.
Huckabee has six other TDLR-registered projects totaling $81,231,000, including the Venus High School project in Venus. The project is registered with TDLR . The area profile for ZIP 76001 indicates a population of about 38,177 and a median household income of $105,760 according to U.S. Census ACS 2023 five-year estimates.
Tarrant County unemployment rate was 4.6 percent in July 2026, higher than a year earlier. The project involves public land or funds. The TDLR registration confirms the plan review completion and the scheduled timeline, but the final inspection status remains pending in the public record.
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 76001 (Arlington)
One email per change. Unsubscribe in one click. Privacy.
Mansfield ISD | DP Morris Elementary School Renovation is a Renovation/Alteration project located at 7900 Tin Cup Drive, Arlington, TX 76001 in Arlington, Texas. The project has an estimated value of $598K covering 22,600 sq ft. Mansfield ISD is the property owner and Huckabee is the design firm of record. The project was registered with TDLR on January 7, 2026.
Frequently Asked Questions
Is DP Morris Elementary renovation finished?
TDLR has not yet recorded a final inspection. Construction was scheduled to finish in August 2026, but the current state of the site is not confirmed in the public record.
Who is designing the DP Morris Elementary renovation?
Huckabee is the design firm of record for this project. The registered accessibility specialist is Ross A Thomas.
What is the estimated cost of the renovation?
The estimated cost is $597,803. This is above the Tarrant County median for similar renovation filings.
When did construction start?
Construction start per the filing is March 2026. Plan review was completed in June 2026.
Is the school open for this renovation?
The TDLR record does not specify school operations. It only tracks construction status, which has not yet recorded a final inspection.
What is Mansfield ISD | DP Morris Elementary School Renovation?
Mansfield ISD | DP Morris Elementary School Renovation is a renovation/alteration project at 7900 Tin Cup Drive in Arlington, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Mansfield ISD | DP Morris Elementary School Renovation
Is Mansfield ISD | DP Morris Elementary School Renovation open in Arlington?
Mansfield ISD | DP Morris Elementary School Renovation was scheduled to finish construction in Aug 2026 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.
Where is Mansfield ISD | DP Morris Elementary School Renovation located?
Mansfield ISD | DP Morris Elementary School Renovation is located at 7900 Tin Cup Drive, Arlington, TX, 76001, in Tarrant County.
Who is the owner or developer of Mansfield ISD | DP Morris Elementary School Renovation?
Mansfield ISD is the property owner/developer of record for Mansfield ISD | DP Morris Elementary School Renovation, per its TDLR project registration.
Who is the architect or design firm for Mansfield ISD | DP Morris Elementary School Renovation?
Huckabee is the design firm of record for Mansfield ISD | DP Morris Elementary School Renovation, according to its TDLR filing.
How much does Mansfield ISD | DP Morris Elementary School Renovation cost and how big is it?
Mansfield ISD | DP Morris Elementary School Renovation has an estimated construction value of $598K and approximately 22,600 square feet (about $26/sqft), based on its TDLR filing.
Scope of Work
Mansfield ISD | DP Morris Elementary School Renovation
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
7900 Tin Cup Drive, Arlington, TX, 76001
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Same Owner
$609.6M totalWatch all construction in 76001 (Arlington)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Arlington?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.