Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
Mansfield ISD | Carol Holt Elementary School Renovation in Arlington, TX
4321 Ledbetter Road, Arlington, TX, 76001
Mansfield ISD | Carol Holt Elementary School Renovation is a renovation/alteration project at 4321 Ledbetter Road, Arlington, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Aug 2026 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $2.6M across about 82,062 sq ft.
- Estimated project value
- $2.6M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 82,062 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $32/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 6 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
56 days after the preceding date shown.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
108 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
60 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Mansfield ISD | Carol Holt Elementary School Renovation
The Mansfield ISD | Carol Holt Elementary School Renovation is underway at 4321 Ledbetter Road in Arlington. This project involves 82,062 square feet of space with an estimated cost of $2,607,488. It is one of six other TDLR-registered projects for Mansfield ISD, which collectively total $19,256,399 across the region.
The work is classified as a renovation or alteration. Huckabee serves as the design firm of record, while Ross A Thomas is the registered accessibility specialist. The project utilizes public funds and public land, ensuring compliance with specific federal and state standards for accessibility and construction.
Timeline and Status
TDLR completed plan review in June 2026. Construction was scheduled to begin in March 2026 and finish in August 2026. This scheduled build window of 168 days is longer than the Tarrant County median of 92 days for similar renovation filings. The project was registered with TDLR in January 2026.
Although the completion date on the filing has passed, TDLR has not yet recorded a final inspection. Therefore, the current state of the site is not confirmed in the public record. The TDLR status is listed as Review Complete, but final inspection data is pending.
Project Context
The estimated cost of $2,607,488 places the Mansfield ISD | Carol Holt Elementary School Renovation in the top quarter of renovation filings in Tarrant County. The median estimated cost for similar projects is $250,000. However, the cost per square foot for this project is $32, which is below the county median of $79 per square foot.
Mansfield ISD has other active or completed projects in the area. These include the Legacy High School Renovation in Mansfield and the Kenneth Davis Elementary School Renovation in Arlington. The district’s total investment in these registered projects highlights a significant commitment to infrastructure updates in the region.
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 76001 (Arlington)
One email per change. Unsubscribe in one click. Privacy.
Mansfield ISD | Carol Holt Elementary School Renovation is a Renovation/Alteration project located at 4321 Ledbetter Road, Arlington, TX 76001 in Arlington, Texas. The project has an estimated value of $2.6M covering 82,062 sq ft. Mansfield ISD is the property owner and Huckabee is the design firm of record. The project was registered with TDLR on January 7, 2026.
Frequently Asked Questions
Is Carol Holt Elementary open?
The TDLR record does not confirm the current operational status of the school. It only tracks construction and accessibility compliance. The final inspection has not yet been recorded, so the site's status is not confirmed in the public record.
Who is the design firm for the renovation?
Huckabee is the design firm of record for the Mansfield ISD | Carol Holt Elementary School Renovation project in Arlington.
What is the estimated cost of the project?
The estimated cost for the 82,062 square foot renovation is $2,607,488. This figure is above the Tarrant County median for similar renovation filings.
When was the project registered with TDLR?
The project was registered with the Texas Department of Licensing and Regulation in January 2026. Plan review was completed in June 2026.
Is the construction finished?
Construction was scheduled to finish in August 2026. However, TDLR has not yet recorded a final inspection, so the completion status is not confirmed in the public record.
What is Mansfield ISD | Carol Holt Elementary School Renovation?
Mansfield ISD | Carol Holt Elementary School Renovation is a renovation/alteration project at 4321 Ledbetter Road in Arlington, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Mansfield ISD | Carol Holt Elementary School Renovation
Is Mansfield ISD | Carol Holt Elementary School Renovation open in Arlington?
Mansfield ISD | Carol Holt Elementary School Renovation was scheduled to finish construction in Aug 2026 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.
Where is Mansfield ISD | Carol Holt Elementary School Renovation located?
Mansfield ISD | Carol Holt Elementary School Renovation is located at 4321 Ledbetter Road, Arlington, TX, 76001, in Tarrant County.
Who is the owner or developer of Mansfield ISD | Carol Holt Elementary School Renovation?
Mansfield ISD is the property owner/developer of record for Mansfield ISD | Carol Holt Elementary School Renovation, per its TDLR project registration.
Who is the architect or design firm for Mansfield ISD | Carol Holt Elementary School Renovation?
Huckabee is the design firm of record for Mansfield ISD | Carol Holt Elementary School Renovation, according to its TDLR filing.
How much does Mansfield ISD | Carol Holt Elementary School Renovation cost and how big is it?
Mansfield ISD | Carol Holt Elementary School Renovation has an estimated construction value of $2.6M and approximately 82,062 square feet (about $32/sqft), based on its TDLR filing.
Scope of Work
Mansfield ISD | Carol Holt Elementary School Renovation
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
4321 Ledbetter Road, Arlington, TX, 76001
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Same Owner
$609.6M totalWatch all construction in 76001 (Arlington)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Arlington?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.