Project intelligenceTDLR TABS2026009575New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

SH 16 ( CSJ:0291-03-077, etc.) in Kerrville, TX

Various Locations, Kerrville, TX, 78028

Opening ~Aug 2027Review Complete

SH 16 ( CSJ:0291-03-077, etc.) is a new construction project at Various Locations, Kerrville, in Kerr County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Aug 2027. The project has an estimated value of $531K across about 52,344 sq ft.

Estimated project value
$531K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
52,344 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$10/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1 year
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jan 8, 2026592 days across supplied datesAug 23, 2027

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    15 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    221 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    356 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About SH 16 ( CSJ:0291-03-077, etc.)

TxDOT District: San Antonio is constructing new sidewalks and curb ramps along two major roadways in Kerrville. The project, registered with TDLR as CSJ: 0291-03-077, covers a total area of 52,344 sq ft. TDLR completed plan review in January 2026 and construction is scheduled to finish in August 2027, with work starting September 2026.

The scope of work involves building pedestrian infrastructure along State Highway 16 from Lehmann Dr. to State Loop 98, and along State Loop 98 from Farm to Market Road 394 to State Highway 16. This new construction project is located at Various Locations in Kerrville, TX 78028, within Kerr County. The estimated cost for the work is $531,355.

Project Details

Pape-Dawson Engineers, Inc. serves as the design firm of record for this roadway improvement. Frank Fonseca is the registered accessibility specialist associated with the filing. The project involves public funds, public land, or is a Federally funded roadway project.

The estimated cost of $531,355 is below the county median for new construction filings in Kerr County, which stands at $950,000. The calculated cost per square foot is $10, which is below the county median of $195 per square foot. The scheduled build window is 356 days, longer than the county median of 242 days. TxDOT District: San Antonio has six other TDLR-registered projects totaling $31,802,622, all with review complete status.

Local Context

Kerrville is home to various businesses, including Fore Premier Properties, Central Automotive, and Playhouse 2000. The area is served by the Kerr Emergency 9-1-1 District. U.S. Census ACS 2023 five-year estimates for ZIP code 78028 indicate a population of about 40,829 and a median household income of $65,486. There are approximately 19,285 housing units in the area, with a median owner-occupied home value of $281,300. Housing in the region is mostly owner-occupied. The Kerr County unemployment rate was 3.9 percent in June 2026, higher than a year earlier.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78028 (Kerrville)

One email per change. Unsubscribe in one click. Privacy.

SH 16 ( CSJ:0291-03-077, etc.) is a New Construction project located at Various Locations, Kerrville, TX 78028 in Kerrville, Texas. The project has an estimated value of $531K covering 52,344 sq ft. TxDOT District: San Antonio is the property owner and Pape-Dawson Engineers, Inc. is the design firm of record. The project was registered with TDLR on January 8, 2026.

Frequently Asked Questions

When is the sidewalk construction scheduled to finish?

Construction is scheduled to finish in August 2027. Work is set to begin in September 2026, following the completion of plan review in January 2026.

What is the estimated cost of this project?

The estimated cost for the new sidewalks and curb ramps is $531,355. This figure is below the median estimated cost for similar new construction projects in Kerr County.

Which roads are included in the scope of work?

The project covers State Highway 16 from Lehmann Dr. to State Loop 98 and State Loop 98 from Farm to Market Road 394 to State Highway 16.

Who is the design firm for this project?

Pape-Dawson Engineers, Inc. is the design firm of record. Frank Fonseca is the registered accessibility specialist listed in the TDLR filing.

Is the project located in a flood zone?

The area is designated as zone X according to the National Flood Hazard Layer.

What is SH 16 ( CSJ:0291-03-077, etc.)?

SH 16 ( CSJ:0291-03-077, etc.) is a new construction project at Various Locations in Kerrville, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Construct sidewalks and curb ramps along SH 16 from Lehmann Dr. to SL 98 and along SL 98 from FM 394 to SH 16.

Is SH 16 ( CSJ:0291-03-077, etc.) open in Kerrville?

SH 16 ( CSJ:0291-03-077, etc.) is still under construction in Kerrville, TX, with an estimated completion of Aug 2027 according to its TDLR registration.

Where is SH 16 ( CSJ:0291-03-077, etc.) located?

SH 16 ( CSJ:0291-03-077, etc.) is located at Various Locations, Kerrville, TX, 78028, in Kerr County.

Who is the owner or developer of SH 16 ( CSJ:0291-03-077, etc.)?

TxDOT District: San Antonio is the property owner/developer of record for SH 16 ( CSJ:0291-03-077, etc.), per its TDLR project registration.

Who is the architect or design firm for SH 16 ( CSJ:0291-03-077, etc.)?

Pape-Dawson Engineers, Inc. is the design firm of record for SH 16 ( CSJ:0291-03-077, etc.), according to its TDLR filing.

How much does SH 16 ( CSJ:0291-03-077, etc.) cost and how big is it?

SH 16 ( CSJ:0291-03-077, etc.) has an estimated construction value of $531K and approximately 52,344 square feet (about $10/sqft), based on its TDLR filing.

Scope of Work

Construct sidewalks and curb ramps along SH 16 from Lehmann Dr. to SL 98 and along SL 98 from FM 394 to SH 16.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

Various Locations, Kerrville, TX, 78028

Loading location map…
30.04743, -99.14032

Watch all construction in 78028 (Kerrville)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Kerrville?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.