Project intelligenceTDLR TABS2026009813Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

City of Temple Fire Station 2

1710 East Avenue H, Temple, TX, 76501

Opening ~Jan 2027Review Complete

City of Temple Fire Station 2 is a renovation/alteration project at 1710 East Avenue H, Temple, in Bell County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Jan 2027. The project has an estimated value of $1.5M across about 585 sq ft.

Estimated project value
$1.5M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
585 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$2.56K/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
11 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jan 12, 2026354 days across supplied datesJan 1, 2027

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    6 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    14 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    334 days after the preceding date shown.

    Source: TDLR filing

    View source record

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 76501 (Temple)

One email per change. Unsubscribe in one click. Privacy.

City of Temple Fire Station 2 is a Renovation/Alteration project located at 1710 East Avenue H, Temple, TX 76501 in Temple, Texas. The project has an estimated value of $1.5M covering 585 sq ft. City of Temple is the property owner and Brown Reynolds Watford Architects, Inc. is the design firm of record. The project was registered with TDLR on January 12, 2026.

Frequently Asked Questions

What is City of Temple Fire Station 2?

City of Temple Fire Station 2 is a renovation/alteration project at 1710 East Avenue H in Temple, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Building Renovation and addition

Is City of Temple Fire Station 2 open in Temple?

City of Temple Fire Station 2 is still under construction in Temple, TX, with an estimated completion of Jan 2027 according to its TDLR registration.

Where is City of Temple Fire Station 2 located?

City of Temple Fire Station 2 is located at 1710 East Avenue H, Temple, TX, 76501, in Bell County.

Who is the owner or developer of City of Temple Fire Station 2?

City of Temple is the property owner/developer of record for City of Temple Fire Station 2, per its TDLR project registration.

Who is the architect or design firm for City of Temple Fire Station 2?

Brown Reynolds Watford Architects, Inc. is the design firm of record for City of Temple Fire Station 2, according to its TDLR filing.

How much does City of Temple Fire Station 2 cost and how big is it?

City of Temple Fire Station 2 has an estimated construction value of $1.5M and approximately 585 square feet (about $2.56K/sqft), based on its TDLR filing.

Scope of Work

Building Renovation and addition

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

1710 East Avenue H, Temple, TX, 76501

Location by street address

Watch all construction in 76501 (Temple)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Get alerts for Bell

Daily email when new projects start nearby.

Start Alerts - $19/mo

Download project data

Get curated lists of projects with full contact info.

Browse Data Lists