Spec Suite 430
Spec Suite 430 is a renovation/alteration project at 5525 Granite Pkwy Suite 430, Plano, in Collin County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $121K across about 1,690 sq ft.
๐Project Metrics
TDLR #TABS2026009942Project Registered
Project has been registered with TDLR and is in pre-construction phase
Spec Suite 430 is a Renovation/Alteration project located at 5525 Granite Pkwy Suite 430, Plano, TX 75024 in Plano, Texas. The project has an estimated value of $121K covering 1,690 sq ft. Granite Park VI LP is the property owner and Entos Design is the design firm of record. The project was registered with TDLR on January 13, 2026.
โFrequently Asked Questions
What is Spec Suite 430?
Spec Suite 430 is a renovation/alteration project at 5525 Granite Pkwy Suite 430 in Plano, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: 1,690
Is Spec Suite 430 open in Plano?
Spec Suite 430 is currently under construction in Plano, TX. Its current TDLR status is "Project Registered".
Where is Spec Suite 430 located?
Spec Suite 430 is located at 5525 Granite Pkwy Suite 430, Plano, TX, 75024, in Collin County.
Who is the owner or developer of Spec Suite 430?
Granite Park VI LP is the property owner/developer of record for Spec Suite 430, per its TDLR project registration.
Who is the architect or design firm for Spec Suite 430?
Entos Design is the design firm of record for Spec Suite 430, according to its TDLR filing.
How much does Spec Suite 430 cost and how big is it?
Spec Suite 430 has an estimated construction value of $121K and approximately 1,690 square feet (about $72/sqft), based on its TDLR filing.
๐Scope of Work
1,690
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jan 13, 2026
Review Complete
Inspection Complete
Closed