Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
Weatherford College - New Student Union
225 College Park Dr, Weatherford, TX, 76086
Weatherford College - New Student Union is a new construction project at 225 College Park Dr, Weatherford, in Parker County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Jan 2028. The project has an estimated value of $81.0M across about 108,657 sq ft.
- Estimated project value
- $81.0M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 108,657 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $745/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 1y 9mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
65 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
25 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
640 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Weatherford College - New Student Union
Weatherford College is developing a new 108,657 sq ft Student Union at 225 College Park Dr in Weatherford, Texas. The project, filed under the name Weatherford College - New Student Union, represents a significant addition to the Parker County campus. With an estimated cost of $81,000,000, this new construction effort stands out as a major investment in the local educational infrastructure.
The registered accessibility specialist, Ross A Thomas, oversees compliance for this build. TDLR completed the plan review in March 2026, and construction is scheduled to finish in January 2028, with work starting April 2026. This timeline indicates a substantial build period that reflects the scale of the facility being erected on the college grounds.
Scale and Cost Context
At $745 per square foot, the project’s cost per unit area is above the county median of $133 per square foot for new construction filings. The total estimated cost of $81,000,000 places this project in the top quarter of Parker County filings when compared to the median estimated cost of $800,000. The scheduled build window of 640 days is longer than the county median of 212 days, consistent with the complexity of a new building of this size.
Huckabee serves as the design firm of record for the Student Union. The firm has other TDLR-registered projects, including Venus High School and Midway ISD additions. Weatherford College has six other TDLR-registered projects totaling $53,282,146, such as the Vickie and Jerry Durant Hall and the Marjorie Alkek Fine Arts Center. This new union building extends the college's recent development activity in the region.
Local coverage noted the project in March 2026, with a post on openpublica.com listing the new student union building among community events and updates for that month. The project involves public funds and public land, aligning with the college's role in the community. The area profile for ZIP code 76086 shows a population of about 22,900, with a median household income of $61,415. Parker County’s unemployment rate was 3.9 percent in July 2026, providing context for the local labor market during this construction phase.
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 76086 (Weatherford)
One email per change. Unsubscribe in one click. Privacy.
Weatherford College - New Student Union is a New Construction project located at 225 College Park Dr, Weatherford, TX 76086 in Weatherford, Texas. The project has an estimated value of $81.0M covering 108,657 sq ft. Weatherford College is the property owner and Huckabee is the design firm of record. The project was registered with TDLR on January 19, 2026.
Frequently Asked Questions
When is the Student Union construction scheduled to finish?
Construction is scheduled to finish in January 2028, with work starting in April 2026 according to the TDLR filing.
Who is the owner of the new Student Union project?
Weatherford College is the owner and developer of record for the new Student Union at 225 College Park Dr.
What is the estimated cost of the project?
The estimated cost for the new construction is $81,000,000, covering 108,657 square feet of new space.
Is the building open to the public?
The TDLR record indicates construction is ongoing and scheduled to finish in January 2028, so the building is not yet open.
Which firm designed the Student Union?
Huckabee is the design firm of record for the Weatherford College new Student Union project.
What is Weatherford College - New Student Union?
Weatherford College - New Student Union is a new construction project at 225 College Park Dr in Weatherford, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: new construction
Is Weatherford College - New Student Union open in Weatherford?
Weatherford College - New Student Union is still under construction in Weatherford, TX, with an estimated completion of Jan 2028 according to its TDLR registration.
Where is Weatherford College - New Student Union located?
Weatherford College - New Student Union is located at 225 College Park Dr, Weatherford, TX, 76086, in Parker County.
Who is the owner or developer of Weatherford College - New Student Union?
Weatherford College is the property owner/developer of record for Weatherford College - New Student Union, per its TDLR project registration.
Who is the architect or design firm for Weatherford College - New Student Union?
Huckabee is the design firm of record for Weatherford College - New Student Union, according to its TDLR filing.
How much does Weatherford College - New Student Union cost and how big is it?
Weatherford College - New Student Union has an estimated construction value of $81.0M and approximately 108,657 square feet (about $745/sqft), based on its TDLR filing.
Scope of Work
new construction
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
225 College Park Dr, Weatherford, TX, 76086
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Same Owner
$133.6M totalWatch all construction in 76086 (Weatherford)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Weatherford?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.