Construction complete · Mar 2026Inspection Complete

USAA FSB BSB BSB GARAGE PHASE 1 PROJECT is a renovation/alteration project at 9800 Fredericksburg, San Antonio, in Bexar County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Mar 2026). The project has an estimated value of $1.0M across about 816,531 sq ft.

Estimated project value
$1.0M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
816,531 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$1/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
2y 8mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Aug 2, 20211,688 days across supplied datesMar 17, 2026

5 timeline dates shown.

  1. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Source: TDLR filing

    View source record
  2. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    956 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    684 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    2 days after the preceding date shown.

    Source: TDLR filing

    View source record
  5. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    46 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About USAA FSB BSB BSB GARAGE PHASE 1 PROJECT

The renovation of the Usaa Buildings FSB, BSB and BSB Garage at 9800 Fredericksburg in San Antonio is complete. The project, filed with the Texas Department of Licensing and Regulatory Affairs as the Usaa FSB BSB BSB Garage Phase 1 Project, passed its final TDLR accessibility inspection in March 2026. This concludes a construction period that began in August 2021 and officially ended in March 2024 according to the original filing, with the regulatory process finalizing in early 2026.

The scope of work covers a massive 816,531 square feet of renovation and alteration. This scale places the project significantly above the median size for similar filings in Bexar County, which stands at 4,093 square feet. The estimated cost for this extensive work is $1,000,000. While this figure is above the county median of $250,000 for renovation and alteration projects, the calculated cost per square foot is $1, which is well below the county median of $85 per square foot.

Project Details and Ownership

United States Automobile Association is the owner and developer of record. The design firm listed on the filing is Automatic Fire Protection LLC. Robert Ronson serves as the registered accessibility specialist. The project is privately funded and located on private land for private use.

The scheduled build window for this phase was 956 days. This duration is longer than the county median of 103 days for similar projects. The project was registered with TDLR in January 2026, and plan review was also completed in January 2026. The final inspection passed in March 2026, confirming the status as Inspection Complete. City of San Antonio permit records for this address show 19 permits issued between January 2025 and August 2026, including mechanical, plumbing, and electrical work, though these may relate to various tenants or units at the address.

The completion of this project reflects a significant investment in the infrastructure of the USAA campus in San Antonio. The work involved substantial alterations to the existing structures, ensuring compliance with accessibility standards. The final TDLR accessibility inspection in March 2026 validates that the renovations meet the required regulatory standards. The project stands as a notable example of large-scale renovation work in Bexar County, distinct from typical smaller-scale alterations.

Inspection Complete

Final inspection completed, awaiting project closure

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78288 (San Antonio)

One email per change. Unsubscribe in one click. Privacy.

USAA FSB BSB BSB GARAGE PHASE 1 PROJECT is a Renovation/Alteration project located at 9800 Fredericksburg, San Antonio, TX 78288 in San Antonio, Texas. The project has an estimated value of $1.0M covering 816,531 sq ft. UNITED STATES AUTOMOBILE ASSOCIATION is the property owner and Automatic Fire Protection LLC is the design firm of record. The project was registered with TDLR on January 28, 2026.

Frequently Asked Questions

Is the USAA Building renovation complete?

Yes, the project passed its final TDLR accessibility inspection in March 2026. The TDLR status is listed as Inspection Complete, indicating the construction and regulatory review process has finished.

How big is the USAA FSB BSB BSB Garage project?

The project covers 816,531 square feet. This is significantly larger than the median renovation project in Bexar County, which is typically around 4,093 square feet.

Who owns the buildings at 9800 Fredericksburg?

United States Automobile Association is the owner and developer of record. The project is privately funded and located on private land for private use.

What is the estimated cost of the renovation?

The estimated cost is $1,000,000. This places the project in the top quarter of costs for similar renovation filings in Bexar County, where the median is $250,000.

Who is the registered accessibility specialist?

Robert Ronson is the registered accessibility specialist listed on the TDLR filing for this project.

What is USAA FSB BSB BSB GARAGE PHASE 1 PROJECT?

USAA FSB BSB BSB GARAGE PHASE 1 PROJECT is a renovation/alteration project at 9800 Fredericksburg in San Antonio, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: USAA BUILDINGS FSB-BSB-BSB GARAGE Phase 1 - 816,531 Square Feet

Is USAA FSB BSB BSB GARAGE PHASE 1 PROJECT open in San Antonio?

Construction on USAA FSB BSB BSB GARAGE PHASE 1 PROJECT is complete — TDLR records show the project passed its required accessibility inspection in Mar 2026. The building is finished and very likely open.

Where is USAA FSB BSB BSB GARAGE PHASE 1 PROJECT located?

USAA FSB BSB BSB GARAGE PHASE 1 PROJECT is located at 9800 Fredericksburg, San Antonio, TX, 78288, in Bexar County.

Who is the owner or developer of USAA FSB BSB BSB GARAGE PHASE 1 PROJECT?

UNITED STATES AUTOMOBILE ASSOCIATION is the property owner/developer of record for USAA FSB BSB BSB GARAGE PHASE 1 PROJECT, per its TDLR project registration.

Who is the architect or design firm for USAA FSB BSB BSB GARAGE PHASE 1 PROJECT?

Automatic Fire Protection LLC is the design firm of record for USAA FSB BSB BSB GARAGE PHASE 1 PROJECT, according to its TDLR filing.

How much does USAA FSB BSB BSB GARAGE PHASE 1 PROJECT cost and how big is it?

USAA FSB BSB BSB GARAGE PHASE 1 PROJECT has an estimated construction value of $1.0M and approximately 816,531 square feet (about $1/sqft), based on its TDLR filing.

Scope of Work

USAA BUILDINGS FSB-BSB-BSB GARAGE Phase 1 - 816,531 Square Feet

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

9800 Fredericksburg, San Antonio, TX, 78288

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Related City Permits

Building permits found at or near this location

9800 FREDERICKSBURG RD, City of San Antonio, TX 78288

Remodel

IssuedMechanical PermitSep 2026
SAT-MEP-MEC-PMT26-33924055
9800 FREDERICKSBURG RD, City of San Antonio, TX 78288

9800 FREDERICKSBURG RD B104

IssuedMinor Commercial Repair PermitSep 2026
SAT-REP-CRP-PMT26-35400331
9800 FREDERICKSBURG RD, City of San Antonio, TX 78288

USAA MAINTENANCE TO CLAIMS BUILDING

IssuedElectrical General PermitAug 2026
SAT-MEP-ELE-PMT26-33323986
9800 FREDERICKSBURG RD, City of San Antonio, TX 78288

USAA DO2W A-Bay Workplace Renovation

IssuedExistingExistingAug 2026
SAT-COM-RML-PMT26-40000507
9800 FREDERICKSBURG RD, City of San Antonio, TX 78288

Building No: 1; Unit No: n/a

IssuedExistingExistingJun 2026
SAT-COM-RML-PMT26-40000313

Watch all construction in 78288 (San Antonio)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in San Antonio?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.