Project intelligenceTDLR TABS2026011258New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Bell County Engineer's Office

702 West Avenue O, Belton, TX, 76513

Opening ~May 2027Review Complete

Bell County Engineer's Office is a new construction project at 702 West Avenue O, Belton, in Bell County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion May 2027. The project has an estimated value of $2.5M across about 6,750 sq ft.

Estimated project value
$2.5M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
6,750 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$370/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1 year
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

Explore the linked construction record and source history

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jan 30, 2026475 days across supplied datesMay 20, 2027

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    40 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    70 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    365 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Bell County Engineer's Office

The Bell County Engineer's Office is a new 6,750-square-foot, single-story office building under construction at 702 West Avenue O in Belton, Texas. This wood-frame structure, built on a slab-on-grade foundation, is scheduled to finish in May 2027. The project represents a significant expansion of the county's administrative infrastructure in the city of Belton.

Construction began in May 2026, following the completion of plan review by the Texas Department of Licensing and Regulation (TDLR) in March 2026. The building features a standing seam metal roof and exterior walls composed of brick, stone, and metal panels. The design firm of record is MRB Group, while Joseph Paul Vann serves as the registered accessibility specialist for the project.

The estimated cost for this new construction is $2,500,000, which calculates to $370 per square foot. This figure is above the median estimated cost of $850,000 for similar new construction filings in Bell County. The scheduled build window of 365 days is longer than the county median of 242 days, reflecting the complexity of the public works project.

Bell County is the owner of record, and the project involves public funds and public land. This office building is one of several recent TDLR-registered projects for the county, including the Bell County Radio Shop and the Bell County Diversion Center, also located in Belton.

The project is registered with TDLR under the Tabs program, ensuring compliance with accessibility standards. The registration was filed in January 2026. The completion date listed on the filing is May 2027, marking the end of the construction phase. The building will serve as a dedicated office space for the county's engineering department.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 76513 (Belton)

One email per change. Unsubscribe in one click. Privacy.

Bell County Engineer's Office is a New Construction project located at 702 West Avenue O, Belton, TX 76513 in Belton, Texas. The project has an estimated value of $2.5M covering 6,750 sq ft. Bell County is the property owner and MRB Group is the design firm of record. The project was registered with TDLR on January 30, 2026.

Frequently Asked Questions

When is the Bell County Engineer's Office building scheduled to finish?

The project is scheduled to finish in May 2027. Construction started in May 2026, and TDLR completed plan review in March 2026.

What is the estimated cost of the new office building?

The estimated cost is $2,500,000. This works out to $370 per square foot for the 6,750-square-foot structure.

Who is the design firm for the project?

MRB Group is the design firm of record. Joseph Paul Vann is the registered accessibility specialist.

What is Bell County Engineer's Office?

Bell County Engineer's Office is a new construction project at 702 West Avenue O in Belton, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: This project consists of a new 6750 square foot, 1 story, wood frame, slab on grade office building. It has a standing seam metal roof and brick, stone, and metal panel exterior wall materials.

Is Bell County Engineer's Office open in Belton?

Bell County Engineer's Office is still under construction in Belton, TX, with an estimated completion of May 2027 according to its TDLR registration.

Where is Bell County Engineer's Office located?

Bell County Engineer's Office is located at 702 West Avenue O, Belton, TX, 76513, in Bell County.

Who is the owner or developer of Bell County Engineer's Office?

Bell County is the property owner/developer of record for Bell County Engineer's Office, per its TDLR project registration.

Who is the architect or design firm for Bell County Engineer's Office?

MRB Group is the design firm of record for Bell County Engineer's Office, according to its TDLR filing.

How much does Bell County Engineer's Office cost and how big is it?

Bell County Engineer's Office has an estimated construction value of $2.5M and approximately 6,750 square feet (about $370/sqft), based on its TDLR filing.

Scope of Work

This project consists of a new 6750 square foot, 1 story, wood frame, slab on grade office building. It has a standing seam metal roof and brick, stone, and metal panel exterior wall materials.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

702 West Avenue O, Belton, TX, 76513

Location by street address

Watch all construction in 76513 (Belton)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.