Funding type
This project is privately funded, on private land for private use.
79 Logistics Spec Suite in Taylor, TX
370 BFG 9000 Way, Taylor, TX, 76578
79 Logistics Spec Suite is a renovation/alteration project at 370 BFG 9000 Way, Taylor, in Williamson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Sep 2026). The project has an estimated value of $600K across about 2,526 sq ft.
- Estimated project value
- $600K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 2,526 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $238/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 2 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
5 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
31 days after the preceding date shown.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
11 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
59 days after the preceding date shown.
Source: TDLR filing
View source recordInspection complete · TDLR filing
The filing records completion of the accessibility inspection.
141 days after the preceding date shown.
Source: TDLR filing
View source record
📰About 79 Logistics Spec Suite
Arrowhead RE Properties is renovating a 2,526 sq ft shell warehouse building at 370 BFG 9000 Way in Taylor, Texas. The project, filed under the name Bldg. 3, converts the space into a tenant office build-out. The filing identifies the specific suite as the 79 Logistics Spec Suite, indicating a focused commercial adaptation rather than a general-purpose construction effort.
The estimated cost for this alteration is $600,000, which works out to $238 per square foot. This figure places the project above the median estimated cost for renovation and alteration filings in Williamson County. The scheduled build window of 70 days is close to the county median of 92 days for similar projects. The design firm of record is S. Tipton Studio, a practice that has registered six other projects in the region, including developments in Austin and Manchaca.
Timeline and Status
The project registered with the Texas Department of Licensing and Regulation in January 2026. Plan review was completed in March 2026, and construction was scheduled to begin in the same month. The filing indicated a completion date of May 2026. However, TDLR has not yet recorded a final inspection. Because this inspection is missing from the public record, the current physical state of the site is not confirmed.
The work is privately funded on private land for private use. The registered accessibility specialist for the project is David C Deming. The location is in Williamson County, a region with a median household income of $100,500 according to Census estimates for the ZIP code. The project represents a specific commercial investment within the Taylor area, distinct from the broader residential housing stock in the vicinity.
Readers should note that the absence of a final inspection does not confirm whether the business is open or operating. Construction status and business opening are separate matters. The public record only verifies the administrative steps taken through plan review and the scheduled timeline, not the final occupancy or operational status of the tenant space.
Inspection Complete
Final inspection completed, awaiting project closure
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 76578 (Taylor)
One email per change. Unsubscribe in one click. Privacy.
79 Logistics Spec Suite is a Renovation/Alteration project located at 370 BFG 9000 Way, Taylor, TX 76578 in Taylor, Texas. The project has an estimated value of $600K covering 2,526 sq ft. Arrowhead RE Properties is the property owner and S. Tipton Studio is the design firm of record. The project was registered with TDLR on January 30, 2026.
Frequently Asked Questions
Is the 79 Logistics Spec Suite open for business?
The TDLR record does not confirm if the business is open. It shows plan review was completed, but TDLR has not yet recorded a final inspection, so the current state of the site is not confirmed in the public record.
Who is the developer of Bldg. 3 in Taylor?
Arrowhead RE Properties is the owner and developer of record for this project. The design firm of record is S. Tipton Studio, which is responsible for the architectural plans for the office build-out.
How much did this renovation cost?
The estimated cost for the renovation is $600,000. This amount is above the median estimated cost for renovation and alteration filings in Williamson County, reflecting the specific scope of the office build-out.
When was the construction scheduled to finish?
The filing scheduled construction to begin in March 2026 and complete in May 2026. However, TDLR has not yet recorded a final inspection, so the actual completion date is not confirmed in the public record.
What type of work is being done?
The project is a renovation or alteration. Specifically, it is a tenant office build-out to a previously permitted shell warehouse building, converting the space for commercial office use.
What is 79 Logistics Spec Suite?
79 Logistics Spec Suite is a renovation/alteration project at 370 BFG 9000 Way in Taylor, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: tenant office build out to a previously permitted shell warehouse building.
Is 79 Logistics Spec Suite open in Taylor?
Construction on 79 Logistics Spec Suite is complete — TDLR records show the project passed its required accessibility inspection in Sep 2026. The building is finished and very likely open.
Where is 79 Logistics Spec Suite located?
79 Logistics Spec Suite is located at 370 BFG 9000 Way, Taylor, TX, 76578, in Williamson County.
Who is the owner or developer of 79 Logistics Spec Suite?
Arrowhead RE Properties is the property owner/developer of record for 79 Logistics Spec Suite, per its TDLR project registration.
Who is the architect or design firm for 79 Logistics Spec Suite?
S. Tipton Studio is the design firm of record for 79 Logistics Spec Suite, according to its TDLR filing.
How much does 79 Logistics Spec Suite cost and how big is it?
79 Logistics Spec Suite has an estimated construction value of $600K and approximately 2,526 square feet (about $238/sqft), based on its TDLR filing.
Scope of Work
tenant office build out to a previously permitted shell warehouse building.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
370 BFG 9000 Way, Taylor, TX, 76578
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Related City Permits
Building permits found at or near this location
Interior non structural demolition
Secondary Contractor Refrigeration equipment being installed for existing-to-remain walk-in coolers/freezers.
Per AISD 2022 Bond Language. Secure entry vestibule upgrades storefront and glazing installation. Life safety and security improvements. Big gym replacement.
BASE: Installing a backup battery system and additional meter socket.
Replacement of an existing water heater GAS TANKLESS WATER HEATER
Watch all construction in 76578 (Taylor)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Taylor?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.