79 Logistics Spec Suite
79 Logistics Spec Suite is a renovation/alteration project at 370 BFG 9000 Way, Taylor, in Williamson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $600K across about 2,526 sq ft.
๐Project Metrics
TDLR #TABS2026011308Review Complete
Design review complete, construction may proceed
79 Logistics Spec Suite is a Renovation/Alteration project located at 370 BFG 9000 Way, Taylor, TX 76578 in Taylor, Texas. The project has an estimated value of $600K covering 2,526 sq ft. Arrowhead RE Properties is the property owner and S. Tipton Studio is the design firm of record. The project was registered with TDLR on January 30, 2026.
โFrequently Asked Questions
What is 79 Logistics Spec Suite?
79 Logistics Spec Suite is a renovation/alteration project at 370 BFG 9000 Way in Taylor, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: tenant office build out to a previously permitted shell warehouse building.
Is 79 Logistics Spec Suite open in Taylor?
79 Logistics Spec Suite is currently under construction in Taylor, TX. Its current TDLR status is "Review Complete".
Where is 79 Logistics Spec Suite located?
79 Logistics Spec Suite is located at 370 BFG 9000 Way, Taylor, TX, 76578, in Williamson County.
Who is the owner or developer of 79 Logistics Spec Suite?
Arrowhead RE Properties is the property owner/developer of record for 79 Logistics Spec Suite, per its TDLR project registration.
Who is the architect or design firm for 79 Logistics Spec Suite?
S. Tipton Studio is the design firm of record for 79 Logistics Spec Suite, according to its TDLR filing.
How much does 79 Logistics Spec Suite cost and how big is it?
79 Logistics Spec Suite has an estimated construction value of $600K and approximately 2,526 square feet (about $238/sqft), based on its TDLR filing.
๐Scope of Work
tenant office build out to a previously permitted shell warehouse building.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jan 30, 2026
Review Complete
Mar 13, 2026
Inspection Complete
Closed
42d
Review duration
๐Related Projects
๐๏ธSame Design Firm
$2.5M total๐Related City Permits
Building permits found at or near this location
Replacement of complete existing central heat and air system with or without duct work Replacement of HVAC system.
*PARTIAL DEMO* ePlan: Residential Expedited Review - Addition and Remodel to Existing 1-Story Single Family Res. [3bed 2bath] Work to include: First floor Interior Remodel First Floor Addition New Second Floor New driveway New beds New baths [5bed 4bath] and existing Wood Deck original built without permit to be Retroactively permitted with this scope of work.
Install Level 2 EV Charger
Replacement Water heater
install new 17 seer gas system