Design review complete, construction may proceed
79 Logistics Spec Suite is a Renovation/Alteration project located at 370 BFG 9000 Way, Taylor, TX 76578 in Taylor, Texas. The project has an estimated value of $600K covering 2,526 sq ft. Arrowhead RE Properties is the property owner and S. Tipton Studio is the design firm of record. The project was registered with TDLR on January 30, 2026.
tenant office build out to a previously permitted shell warehouse building.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Jan 30, 2026
Review Complete
Mar 13, 2026
Inspection Complete
Closed
42d
Review duration
Building permits found at or near this location
Total demo of pool and spa 390 sqft
3706 1/2 Oakmont Blvd: New 2-story residence with 2-car garage & second floor studio garage apartment 1 bathroom. Part of 2-unit use.
90 tunnel below the foundation to replace entire drain system.3 access holes - front left right
Electrical Upgrade
Replacement of an existing water heater Water heater change out 3708 Autumn Bay Drive Austin TX 78744