Project intelligenceTDLR TABS2026011428New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Lamar CISD ES 40 in Brookshire, TX

33050 Tiger Run, Brookshire, TX, 77423

Opening ~May 2027Review Complete

Lamar CISD ES 40 is a new construction project at 33050 Tiger Run, Brookshire, in Fort Bend County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion May 2027. The project has an estimated value of $40.0M across about 116,110 sq ft.

Estimated project value
$40.0M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
116,110 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$345/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 2mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Feb 2, 2026467 days across supplied datesMay 15, 2027

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    43 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    13 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    411 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Lamar CISD ES 40

Lamar CISD Elementary School 40 is a new 116,110 square foot facility located at 33050 Tiger Run in Brookshire, Texas. The project, filed with the Texas Department of Licensing and Regulation (TDLR) as Lamar CISD ES 40, represents a significant addition to the district’s infrastructure in Fort Bend County. With an estimated construction cost of $40,000,000, the building is designed to serve the growing student population in the area, utilizing a prototype design on a new site.

Project Scope and Design

The scope of work involves the complete new construction of the elementary school. Pfluger Architects serves as the design firm of record, responsible for the architectural plans that have undergone rigorous review. The registered accessibility specialist for the project is William T Winning, ensuring the facility meets all state standards for accessibility. The project is funded through public funds, reflecting the district's commitment to expanding educational resources for the community.

TDLR completed the plan review process in March 2026, clearing the way for construction to begin in the same month. The status of the project is listed as Review Complete, indicating that all necessary regulatory approvals have been secured. Construction is scheduled to finish in May 2027, providing a clear timeline for the completion of this major educational facility. The total scheduled build window is 411 days, which is longer than the county median of 201 days for similar new construction projects.

Regional Context and Comparison

This project stands out in Fort Bend County, where the median estimated cost for new construction filings is $700,000. The $40,000,000 price tag for Lamar CISD Elementary School 40 places it well above that median, specifically in the top quarter of costs for its type. Similarly, the cost per square foot is $345, which is significantly higher than the county median of $100 per square foot. These figures reflect the complexity and scale of building a modern, large-scale elementary school compared to smaller commercial or residential projects.

Lamar CISD has several other registered projects in the region, including Elementary School 39 in Richmond and Elementary School 41 in Beasley, both with similar estimated costs of $40,000,000. The district’s portfolio also includes the Gene Tomas High School Stadium in Richmond and a Police and Technology Building in Rosenberg. Pfluger Architects, the design firm for this project, has worked on other notable sites such as Leander Elementary #32 in Leander and the Flour Bluff Hornet Stadium in Corpus Christi. This consistent use of specialized firms and high-value projects underscores the district’s ongoing investment in modern educational infrastructure across multiple locations.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77423 (Brookshire)

One email per change. Unsubscribe in one click. Privacy.

Lamar CISD ES 40 is a New Construction project located at 33050 Tiger Run, Brookshire, TX 77423 in Brookshire, Texas. The project has an estimated value of $40.0M covering 116,110 sq ft. Lamar CISD is the property owner and Pfluger Architects is the design firm of record. The project was registered with TDLR on February 2, 2026.

Frequently Asked Questions

Where is the new school located?

The school is located at 33050 Tiger Run in Brookshire, Texas, within Fort Bend County.

When is the project scheduled to finish?

Construction is scheduled to finish in May 2027, following a start date of March 2026.

Is the school open for enrollment?

The TDLR record tracks construction status, not operational status. The project is scheduled to finish in May 2027.

What is Lamar CISD ES 40?

Lamar CISD ES 40 is a new construction project at 33050 Tiger Run in Brookshire, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Construction of a new 116,110 square foot elementary school. This school is a prototype design located in the new site.

Is Lamar CISD ES 40 open in Brookshire?

Lamar CISD ES 40 is still under construction in Brookshire, TX, with an estimated completion of May 2027 according to its TDLR registration.

Where is Lamar CISD ES 40 located?

Lamar CISD ES 40 is located at 33050 Tiger Run, Brookshire, TX, 77423, in Fort Bend County.

Who is the owner or developer of Lamar CISD ES 40?

Lamar CISD is the property owner/developer of record for Lamar CISD ES 40, per its TDLR project registration.

Who is the architect or design firm for Lamar CISD ES 40?

Pfluger Architects is the design firm of record for Lamar CISD ES 40, according to its TDLR filing.

How much does Lamar CISD ES 40 cost and how big is it?

Lamar CISD ES 40 has an estimated construction value of $40.0M and approximately 116,110 square feet (about $345/sqft), based on its TDLR filing.

Scope of Work

Construction of a new 116,110 square foot elementary school. This school is a prototype design located in the new site.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

33050 Tiger Run, Brookshire, TX, 77423

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 77423 (Brookshire)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Brookshire?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.