Casey's #4688
Casey's #4688 is a renovation/alteration project at 14200 FM 620, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Sep 2026. The project has an estimated value of $550K across about 4,616 sq ft.
๐Project Metrics
TDLR #TABS2026011587Review Complete
Design review complete, construction may proceed
Casey's #4688 is a Renovation/Alteration project located at 14200 FM 620, Austin, TX 78717 in Austin, Texas. The project has an estimated value of $550K covering 4,616 sq ft. Fikes Wholesale is the property owner and NORR LLC is the design firm of record. The project was registered with TDLR on February 3, 2026.
โFrequently Asked Questions
What is Casey's #4688?
Casey's #4688 is a renovation/alteration project at 14200 FM 620 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior remodel with new walk-in coolers, kitchen rework, ADA upgrades, roof DOAS, and related MEP with 4,616 SF.
Is Casey's #4688 open in Austin?
Casey's #4688 is still under construction in Austin, TX, with an estimated completion of Sep 2026 according to its TDLR registration.
Where is Casey's #4688 located?
Casey's #4688 is located at 14200 FM 620, Austin, TX, 78717, in Travis County.
Who is the owner or developer of Casey's #4688?
Fikes Wholesale is the property owner/developer of record for Casey's #4688, per its TDLR project registration.
Who is the architect or design firm for Casey's #4688?
NORR LLC is the design firm of record for Casey's #4688, according to its TDLR filing.
How much does Casey's #4688 cost and how big is it?
Casey's #4688 has an estimated construction value of $550K and approximately 4,616 square feet (about $119/sqft), based on its TDLR filing.
๐Scope of Work
Interior remodel with new walk-in coolers, kitchen rework, ADA upgrades, roof DOAS, and related MEP with 4,616 SF.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Feb 3, 2026
Review Complete
Mar 20, 2026
Inspection Complete
Closed
45d
Review duration
๐Related Projects
๐คSame Owner
$2.1M total๐Related City Permits
Building permits found at or near this location
Secondary Contractor ref 2026-050264 BP. Repair 3 underground conduit and re-pull wire between manhole and CT can. Wire size is 350 KCMIL.
Interior remodel of existing gas station convenience store remodel of the existing kitchen the removal of existing walk-in cooler and adding new in the same location. Bringing restrooms and parking lot to compliance. Update of existing finishes.
Interior remodel of existing gas station convenience store remodel of the existing kitchen the removal of existing walk-in cooler and adding new in the same location. Bringing restrooms and parking lot to compliance. Update of existing finishes.
Interior remodel of existing gas station convenience store remodel of the existing kitchen the removal of existing walk-in cooler and adding new in the same location. Bringing restrooms and parking lot to compliance. Update of existing finishes.
Interior remodel of existing gas station convenience store remodel of the existing kitchen the removal of existing walk-in cooler and adding new in the same location. Bringing restrooms and parking lot to compliance. Update of existing finishes.