FM 2790 (CSJ: 2883-01-004) in Lytle, TX
From: FM 471 To: SH 132, Lytle, TX, 78052
FM 2790 (CSJ: 2883-01-004) is a new construction project at From: FM 471 To: SH 132, Lytle, in Medina County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Jul 2027. The project has an estimated value of $85K across about 6,858 sq ft.
- Estimated project value
- $85K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 6,858 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $12/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 1y 2mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
21 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
63 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
426 days after the preceding date shown.
Source: TDLR filing
View source record
📰About FM 2790 (CSJ: 2883-01-004)
The Texas Department of Transportation, San Antonio District, is executing a new construction project on FM 2790 in Lytle, Texas. This roadway improvement involves rehabilitating and widening a narrow section to add shoulders. The work spans a linear distance of 6,858 square feet, a metric that reflects the linear nature of the roadwork rather than a building footprint. The project is registered with TDLR under the identifier Csj: 2883-01-004.
Construction is scheduled to finish in July 2027, with active work beginning in May 2026. TDLR completed the plan review phase in February 2026, clearing the path for the upcoming construction window. The total estimated cost for this public infrastructure upgrade is $85,096. This figure is significantly below the median estimated cost of $1,264,275 for similar new construction filings in Medina County, placing it in the bottom quarter of recent local projects. The calculated cost per square foot is $12, which is well below the county median of $200 per square foot for comparable filings.
Project Scope and Location
The site is located in Medina County, specifically along the stretch of FM 2790 between FM 471 and SH 132. The primary scope of work is to rehabilitate the existing pavement and widen the roadway to include proper shoulders, enhancing safety and capacity for local traffic. The project is funded through public funds, as it is a Federally funded roadway project. The registered accessibility specialist on file is Frank Fonseca, ensuring the project meets state standards for accessibility and safety during the construction phase.
Lytle is a small community in Medina County with a population of approximately 6,221 according to U.S. Census American Community Survey 2023 five-year estimates for ZIP code 78052. The median household income in this area is $69,018, and the median owner-occupied home value is $178,900. The housing stock is predominantly owner-occupied, with 2,412 total housing units. The median scheduled build window for new construction projects in Medina County is 291 days, whereas this project has a scheduled window of 426 days, which is longer than the county median. This extended timeline is typical for roadway projects that require careful coordination of traffic control and environmental compliance.
This classification indicates a lower risk of flooding compared to areas within the designated flood zones, which may influence drainage design and construction methods. The project is one of several managed by TxDOT District: San Antonio, which has six other TDLR-registered projects totaling $31,802,622 in recent filings. These include projects in San Antonio, La Vernia, and New Braunfels, all of which have completed review. The current project stands out for its focus on rural roadway safety and accessibility improvements in a low-population density area.
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 78052 (Lytle)
One email per change. Unsubscribe in one click. Privacy.
FM 2790 (CSJ: 2883-01-004) is a New Construction project located at From: FM 471 To: SH 132, Lytle, TX 78052 in Lytle, Texas. The project has an estimated value of $85K covering 6,858 sq ft. TxDOT District: San Antonio is the property owner. The project was registered with TDLR on February 6, 2026.
Frequently Asked Questions
When is the road widening scheduled to finish?
Construction is scheduled to finish in July 2027, with work starting in May 2026. The plan review was completed in February 2026.
What is the estimated cost of the project?
The estimated cost is $85,096. This is below the median cost for similar new construction projects in Medina County.
Where exactly is the project located?
The project is on FM 2790 in Lytle, Texas, between FM 471 and SH 132 in Medina County.
What is FM 2790 (CSJ: 2883-01-004)?
FM 2790 (CSJ: 2883-01-004) is a new construction project at From: FM 471 To: SH 132 in Lytle, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: For Work consisting of rehabilitate and widen narrow roadway to add shoulders.
Is FM 2790 (CSJ: 2883-01-004) open in Lytle?
FM 2790 (CSJ: 2883-01-004) is still under construction in Lytle, TX, with an estimated completion of Jul 2027 according to its TDLR registration.
Where is FM 2790 (CSJ: 2883-01-004) located?
FM 2790 (CSJ: 2883-01-004) is located at From: FM 471 To: SH 132, Lytle, TX, 78052, in Medina County.
Who is the owner or developer of FM 2790 (CSJ: 2883-01-004)?
TxDOT District: San Antonio is the property owner/developer of record for FM 2790 (CSJ: 2883-01-004), per its TDLR project registration.
How much does FM 2790 (CSJ: 2883-01-004) cost and how big is it?
FM 2790 (CSJ: 2883-01-004) has an estimated construction value of $85K and approximately 6,858 square feet (about $12/sqft), based on its TDLR filing.
Scope of Work
For Work consisting of rehabilitate and widen narrow roadway to add shoulders.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
From: FM 471 To: SH 132, Lytle, TX, 78052
Related Projects
Watch all construction in 78052 (Lytle)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Lytle?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.