Brazos ISD 2025 - Proposition B

274 EDUCATOR LN WALLIS 77485, Wallis, TX, 77845

Opening ~Jul 2027Review Complete

Brazos ISD 2025 - Proposition B is a renovation/alteration project at 274 EDUCATOR LN WALLIS 77485, Wallis, in Austin County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Jul 2027. The project has an estimated value of $6.5M across about 215,000 sq ft.

Estimated project value
$6.5M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
215,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$30/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 5mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

Explore the linked construction record and source history

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Feb 6, 2026540 days across supplied datesJul 31, 2027

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    9 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    36 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    495 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Brazos ISD 2025 - Proposition B

Brazos ISD is renovating and adding to its existing athletic fields and facilities at 274 Educator Ln in Wallis, Texas. The project, filed under the name Brazos ISD 2025 - Proposition B, involves a renovation/alteration scope covering 215,000 square feet of site improvements. With an estimated cost of $6,500,000, the work represents a significant investment in the district’s sports infrastructure.

Project Status and Timeline

TDLR completed plan review for this registration in February 2026. Construction is scheduled to start in March 2026 and is scheduled to finish in July 2027. This timeline indicates a build window of 495 days, which is longer than the 119-day median scheduled build window for renovation/alteration filings in Austin County. The TDLR status is listed as Review Complete, confirming that the accessibility plan has passed the required state inspection phase.

The design firm of record is SZS Architecture, which is also responsible for six other TDLR-registered projects in the region, including facilities in College Station and Bryan. The registered accessibility specialist for this specific project is Eddie Hare. The owner of record is listed as Wallis-Orchard ISD, which holds one other TDLR-registered project totaling $6,500,000, identical in value and status to this athletic field renovation.

Financial and Regional Context

The estimated cost of $6,500,000 places this project in the top quarter of renovation/alteration filings in Austin County, where the median estimated cost is $400,000. However, the cost per square foot is $30, which is below the county median of $92 per square foot. This lower per-square-foot cost is typical for large-scale site work and field renovations compared to interior building projects.

Local third-party sources, such as ConstructConnect, have listed a 2025 Bond - Proposition B project in Wallis involving site work and new construction for a playground, park, or athletic field. While the TDLR record confirms the renovation and addition to existing athletic fields, the specific details of the construction scope are defined by the filing as renovations and additions to the existing facilities. The area profile for ZIP code 77845 shows a median household income of $90,434 and a median owner-occupied home value of $349,900, according to U.S. Census ACS 2023 estimates.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77845 (Wallis)

One email per change. Unsubscribe in one click. Privacy.

Brazos ISD 2025 - Proposition B is a Renovation/Alteration project located at 274 EDUCATOR LN WALLIS 77485, Wallis, TX 77845 in Wallis, Texas. The project has an estimated value of $6.5M covering 215,000 sq ft. WALLIS-ORCHARD ISD is the property owner and SZS Architecture is the design firm of record. The project was registered with TDLR on February 6, 2026.

Frequently Asked Questions

When is the Brazos ISD athletic field renovation scheduled to finish?

Construction is scheduled to finish in July 2027, with work starting in March 2026. TDLR completed plan review in February 2026, and the project status is Review Complete.

Who is the design firm for the Wallis athletic fields project?

SZS Architecture is the design firm of record. They are also the design firm for six other TDLR-registered projects in the region, including facilities in College Station and Bryan.

What is the estimated cost of the Brazos ISD field renovation?

The estimated cost is $6,500,000. This amount is above the median estimated cost for renovation/alteration filings in Austin County, which is $400,000.

Who is the registered accessibility specialist for this project?

Eddie Hare is the registered accessibility specialist of record for the Brazos ISD 2025 - Proposition B project in Wallis, Texas.

What is Brazos ISD 2025 - Proposition B?

Brazos ISD 2025 - Proposition B is a renovation/alteration project at 274 EDUCATOR LN WALLIS 77485 in Wallis, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovations and additions to Brazos ISD's existing athletic fields and facilities.

Is Brazos ISD 2025 - Proposition B open in Wallis?

Brazos ISD 2025 - Proposition B is still under construction in Wallis, TX, with an estimated completion of Jul 2027 according to its TDLR registration.

Where is Brazos ISD 2025 - Proposition B located?

Brazos ISD 2025 - Proposition B is located at 274 EDUCATOR LN WALLIS 77485, Wallis, TX, 77845, in Austin County.

Who is the owner or developer of Brazos ISD 2025 - Proposition B?

WALLIS-ORCHARD ISD is the property owner/developer of record for Brazos ISD 2025 - Proposition B, per its TDLR project registration.

Who is the architect or design firm for Brazos ISD 2025 - Proposition B?

SZS Architecture is the design firm of record for Brazos ISD 2025 - Proposition B, according to its TDLR filing.

How much does Brazos ISD 2025 - Proposition B cost and how big is it?

Brazos ISD 2025 - Proposition B has an estimated construction value of $6.5M and approximately 215,000 square feet (about $30/sqft), based on its TDLR filing.

Scope of Work

Renovations and additions to Brazos ISD's existing athletic fields and facilities.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

274 EDUCATOR LN WALLIS 77485, Wallis, TX, 77845

29.61800, -96.03533