Project intelligenceTDLR TABS2026011905New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

BS 7N (CSJ: 0118-08-085)

At La Nana Creek, Nacogdoches, TX, 75961

Opening ~Dec 2029Review Complete

BS 7N (CSJ: 0118-08-085) is a new construction project at At La Nana Creek, Nacogdoches, in Nacogdoches County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Dec 2029. The project has an estimated value of $5.5M across about 8,760 sq ft.

Estimated project value
$5.5M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
8,760 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$633/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 2mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

Explore the linked construction record and source history

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Feb 6, 20261,396 days across supplied datesDec 3, 2029

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    22 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    947 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    427 days after the preceding date shown.

    Source: TDLR filing

    View source record

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75961 (Nacogdoches)

One email per change. Unsubscribe in one click. Privacy.

BS 7N (CSJ: 0118-08-085) is a New Construction project located at At La Nana Creek, Nacogdoches, TX 75961 in Nacogdoches, Texas. The project has an estimated value of $5.5M covering 8,760 sq ft. TxDOT District: Lufkin is the property owner and PGAL Inc. is the design firm of record. The project was registered with TDLR on February 6, 2026.

Frequently Asked Questions

What is BS 7N (CSJ: 0118-08-085)?

BS 7N (CSJ: 0118-08-085) is a new construction project at At La Nana Creek in Nacogdoches, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Replace bridge and approaches, construct sidewalk and ADA curb ramps.

Is BS 7N (CSJ: 0118-08-085) open in Nacogdoches?

BS 7N (CSJ: 0118-08-085) is still under construction in Nacogdoches, TX, with an estimated completion of Dec 2029 according to its TDLR registration.

Where is BS 7N (CSJ: 0118-08-085) located?

BS 7N (CSJ: 0118-08-085) is located at At La Nana Creek, Nacogdoches, TX, 75961, in Nacogdoches County.

Who is the owner or developer of BS 7N (CSJ: 0118-08-085)?

TxDOT District: Lufkin is the property owner/developer of record for BS 7N (CSJ: 0118-08-085), per its TDLR project registration.

Who is the architect or design firm for BS 7N (CSJ: 0118-08-085)?

PGAL Inc. is the design firm of record for BS 7N (CSJ: 0118-08-085), according to its TDLR filing.

How much does BS 7N (CSJ: 0118-08-085) cost and how big is it?

BS 7N (CSJ: 0118-08-085) has an estimated construction value of $5.5M and approximately 8,760 square feet (about $633/sqft), based on its TDLR filing.

Scope of Work

Replace bridge and approaches, construct sidewalk and ADA curb ramps.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

At La Nana Creek, Nacogdoches, TX, 75961

31.61412, -94.64350

Watch all construction in 75961 (Nacogdoches)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Nacogdoches?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.