Spec Suite
Spec Suite is a renovation/alteration project at 3009 Post Oak BLVD. Suite 900, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $300K across about 7,737 sq ft.
๐Project Metrics
TDLR #TABS2026012173Review Complete
Design review complete, construction may proceed
Spec Suite is a Renovation/Alteration project located at 3009 Post Oak BLVD. Suite 900, Houston, TX 77056 in Houston, Texas. The project has an estimated value of $300K covering 7,737 sq ft. Post Oak Building LLC is the property owner and Ziegler Copper Architects is the design firm of record. The project was registered with TDLR on February 10, 2026.
โFrequently Asked Questions
What is Spec Suite?
Spec Suite is a renovation/alteration project at 3009 Post Oak BLVD. Suite 900 in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior renovation of existing interior buildout
Is Spec Suite open in Houston?
Spec Suite is currently under construction in Houston, TX. Its current TDLR status is "Review Complete".
Where is Spec Suite located?
Spec Suite is located at 3009 Post Oak BLVD. Suite 900, Houston, TX, 77056, in Harris County.
Who is the owner or developer of Spec Suite?
Post Oak Building LLC is the property owner/developer of record for Spec Suite, per its TDLR project registration.
Who is the architect or design firm for Spec Suite?
Ziegler Copper Architects is the design firm of record for Spec Suite, according to its TDLR filing.
How much does Spec Suite cost and how big is it?
Spec Suite has an estimated construction value of $300K and approximately 7,737 square feet (about $39/sqft), based on its TDLR filing.
๐Scope of Work
Interior renovation of existing interior buildout
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Feb 10, 2026
Review Complete
May 13, 2026
Inspection Complete
Closed
92d
Review duration