Funding type
This project is privately funded, on private land for private use.
Garvie Brookshire Industrial
1250 Wood Branch Park Dr Ste 400, Houston, TX, 77079
Garvie Brookshire Industrial is a new construction project at 1250 Wood Branch Park Dr Ste 400, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Nov 2026. The project has an estimated value of $3.3M across about 38,250 sq ft.
- Estimated project value
- $3.3M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 38,250 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $85/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 7 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
8 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
41 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
214 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Garvie Brookshire Industrial
PC Garvie LLC is developing a ground-up industrial park in Houston's Energy Corridor, consisting of five standalone warehouse buildings. The project, filed with the Texas Department of Licensing and Regulation under the name Garvie Brookshire Industrial, covers 38,250 square feet of new construction space at 1250 Wood Branch Park Dr Ste 400. Each building is designed to house individual warehouse suites available for rent, creating a flexible space for logistics and distribution needs in Harris County.
The estimated cost for this development is $3,250,000, which works out to $85 per square foot. This figure is close to the Harris County median of $88 per square foot for similar new construction filings, while the total cost sits above the county median for this project type. The scheduled build window is 214 days, a duration close to the county median of 219 days for comparable industrial projects.
Construction Timeline and Status
Tim Mullins is the registered accessibility specialist for this project. TDLR completed the plan review in February 2026, and the status is listed as Review Complete. Construction is scheduled to start in April 2026 and is scheduled to finish in November 2026.
The project is privately funded and located on private land for private use. This development fits within a corridor that includes other registered projects such as Ashford VI and Woodbranch I, both of which are undergoing renovation or alteration. The surrounding area supports various businesses, including Mac Haik Chevrolet and Embassy Suites by Hilton Houston Energy Corridor, reflecting the mixed commercial and industrial nature of the Energy Corridor.
According to U.S. Census ACS 2023 five-year estimates for ZIP code 77079, the area has a population of about 35,540 and a median household income of $103,089. The housing stock consists of 16,215 units with a median owner-occupied home value of $636,100. While the Harris County unemployment rate was 5.4 percent in June 2026, this new industrial capacity aims to support local economic activity through rental warehouse space.
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 77079 (Houston)
One email per change. Unsubscribe in one click. Privacy.
Garvie Brookshire Industrial is a New Construction project located at 1250 Wood Branch Park Dr Ste 400, Houston, TX 77079 in Houston, Texas. The project has an estimated value of $3.3M covering 38,250 sq ft. PC Garvie LLC is the property owner. The project was registered with TDLR on February 11, 2026.
Frequently Asked Questions
When is the construction scheduled to finish?
The project is scheduled to finish in November 2026, with work starting in April 2026. TDLR completed the plan review in February 2026.
How many buildings are included in this project?
The development includes five standalone warehouse buildings. Each building is designed to contain individual warehouse suites for rent.
What is the total size and cost of the project?
The project covers 38,250 square feet with an estimated cost of $3,250,000. This equates to $85 per square foot.
Who is the registered accessibility specialist?
Tim Mullins is the registered accessibility specialist for this project, which is owned by PC Garvie LLC.
What is Garvie Brookshire Industrial?
Garvie Brookshire Industrial is a new construction project at 1250 Wood Branch Park Dr Ste 400 in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Ground-up industrial park with five standalone warehouse buildings. Each buildings are designed with individual warehouse suite for rent.
Is Garvie Brookshire Industrial open in Houston?
Garvie Brookshire Industrial is still under construction in Houston, TX, with an estimated completion of Nov 2026 according to its TDLR registration.
Where is Garvie Brookshire Industrial located?
Garvie Brookshire Industrial is located at 1250 Wood Branch Park Dr Ste 400, Houston, TX, 77079, in Harris County.
Who is the owner or developer of Garvie Brookshire Industrial?
PC Garvie LLC is the property owner/developer of record for Garvie Brookshire Industrial, per its TDLR project registration.
How much does Garvie Brookshire Industrial cost and how big is it?
Garvie Brookshire Industrial has an estimated construction value of $3.3M and approximately 38,250 square feet (about $85/sqft), based on its TDLR filing.
Scope of Work
Ground-up industrial park with five standalone warehouse buildings. Each buildings are designed with individual warehouse suite for rent.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
1250 Wood Branch Park Dr Ste 400, Houston, TX, 77079
Related City Permits
Building permits found at or near this location
7,772 SF. OFFICE REMODEL 1-6-1-B-B/FA '21 IBC
Watch all construction in 77079 (Houston)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Houston?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.