Project intelligenceTDLR TABS2026012431New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Garland ISD PH1 BP01 Baseball and Softball Improv. - Part 3 Williams Stadium Site

510 Stadium Drive, Garland, TX, 75040

Opening ~Dec 2026Review Complete

Garland ISD PH1 BP01 Baseball and Softball Improv. - Part 3 Williams Stadium Site is a new construction project at 510 Stadium Drive, Garland, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Dec 2026. The project has an estimated value of $12.0M across about 1,200 sq ft.

Estimated project value
$12.0M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
1,200 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$10.00K/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
10 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Feb 12, 2026322 days across supplied datesDec 31, 2026

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    13 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    4 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    305 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Garland ISD PH1 BP01 Baseball and Softball Improv. - Part 3 Williams Stadium Site

Garland ISD is constructing a new concession, toilet, and ticketing building at 510 Stadium Drive in Garland, Texas. This facility, part of the Williams High School Stadium complex, covers 1,200 square feet and is designed to support stadium operations with dedicated accessible parking. The project represents a significant infrastructure investment, with an estimated cost of $12,000,000.

The scope of work extends beyond the primary structure to include field lighting, new bleachers, a scoreboard, and general site improvements. HKS, Inc. serves as the design firm of record for this project. The registered accessibility specialist is Glenn Thomas Comtois, ensuring the facility meets required standards. This project involves public funds and public land, aligning with the district's broader capital improvement goals.

Timeline and Regulatory Status

TDLR completed plan review in February 2026 and construction is scheduled to finish in December 2026, with work starting March 2026. The registration with the Texas Department of Licensing and Regulation occurred in February 2026. The status of the project is marked as Review Complete. The scheduled build window spans 305 days, which is longer than the county median of 243 days for similar new construction filings in Dallas County.

In terms of scale, the estimated cost places this project in the top quarter of new construction filings in Dallas County over the last 24 months. The median estimated cost for such projects is $950,000. Although the building itself is 1,200 square feet, the total project cost reflects the extensive site work, lighting, and seating infrastructure included in the scope. The cost per square foot is calculated at $10,000, significantly above the county median of $125 per square foot, a difference driven by the specialized stadium components rather than just the enclosed building area.

Garland ISD has six other TDLR-registered projects totaling $48,000,000, including facilities in Sachse and Garland. HKS, Inc. has been involved in six other registered projects, some of which are massive in scale compared to this stadium upgrade. The local area, ZIP code 75040, has a population of about 64,205 and a median household income of $73,537 according to U.S. Census estimates. Dallas County unemployment was 3.3 percent in July 2026, higher than a year earlier.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75040 (Garland)

One email per change. Unsubscribe in one click. Privacy.

Garland ISD PH1 BP01 Baseball and Softball Improv. - Part 3 Williams Stadium Site is a New Construction project located at 510 Stadium Drive, Garland, TX 75040 in Garland, Texas. The project has an estimated value of $12.0M covering 1,200 sq ft. Garland ISD is the property owner and HKS, Inc. is the design firm of record. The project was registered with TDLR on February 12, 2026.

Frequently Asked Questions

When is the Williams High School Stadium project scheduled to finish?

Construction is scheduled to finish in December 2026. Work started in March 2026 following the completion of plan review in February 2026.

What is the total estimated cost of the project?

The estimated cost is $12,000,000. This figure includes the new building, field lighting, bleachers, scoreboard, and site improvements.

Who is the design firm for this project?

HKS, Inc. is the design firm of record. Glenn Thomas Comtois is the registered accessibility specialist.

Is the facility open to the public?

The project is under construction and scheduled to finish in December 2026. It is not yet open for public use.

How large is the new building?

The new concession, toilet, and ticketing building is 1,200 square feet. The total project scope includes additional outdoor stadium improvements.

What is Garland ISD PH1 BP01 Baseball and Softball Improv. - Part 3 Williams Stadium Site?

Garland ISD PH1 BP01 Baseball and Softball Improv. - Part 3 Williams Stadium Site is a new construction project at 510 Stadium Drive in Garland, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New Concession/ toilet room/ticketing building, field lighting, bleachers, scoreboard, site improvements with adjacent accessible parking.

Is Garland ISD PH1 BP01 Baseball and Softball Improv. - Part 3 Williams Stadium Site open in Garland?

Garland ISD PH1 BP01 Baseball and Softball Improv. - Part 3 Williams Stadium Site is still under construction in Garland, TX, with an estimated completion of Dec 2026 according to its TDLR registration.

Where is Garland ISD PH1 BP01 Baseball and Softball Improv. - Part 3 Williams Stadium Site located?

Garland ISD PH1 BP01 Baseball and Softball Improv. - Part 3 Williams Stadium Site is located at 510 Stadium Drive, Garland, TX, 75040, in Dallas County.

Who is the owner or developer of Garland ISD PH1 BP01 Baseball and Softball Improv. - Part 3 Williams Stadium Site?

Garland ISD is the property owner/developer of record for Garland ISD PH1 BP01 Baseball and Softball Improv. - Part 3 Williams Stadium Site, per its TDLR project registration.

Who is the architect or design firm for Garland ISD PH1 BP01 Baseball and Softball Improv. - Part 3 Williams Stadium Site?

HKS, Inc. is the design firm of record for Garland ISD PH1 BP01 Baseball and Softball Improv. - Part 3 Williams Stadium Site, according to its TDLR filing.

How much does Garland ISD PH1 BP01 Baseball and Softball Improv. - Part 3 Williams Stadium Site cost and how big is it?

Garland ISD PH1 BP01 Baseball and Softball Improv. - Part 3 Williams Stadium Site has an estimated construction value of $12.0M and approximately 1,200 square feet (about $10.00K/sqft), based on its TDLR filing.

Scope of Work

New Concession/ toilet room/ticketing building, field lighting, bleachers, scoreboard, site improvements with adjacent accessible parking.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

510 Stadium Drive, Garland, TX, 75040

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.