Project intelligenceTDLR TABS2026012437New Construction
Funding type

This project is privately funded, on private land for private use.

Cedar Hill - Building 2 - Staci TI in Dallas, TX

1300 S J Elmer Weaver FWY, Dallas, TX, 75104

Construction complete · Jul 2026Inspection Complete

Cedar Hill - Building 2 - Staci TI is a new construction project at 1300 S J Elmer Weaver FWY, Dallas, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jul 2026). The project has an estimated value of $2.4M across about 2,260 sq ft.

Estimated project value
$2.4M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
2,260 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$1.07K/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
2 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

Explore the linked construction record and source history

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Feb 12, 2026139 days across supplied datesJul 1, 2026

5 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    18 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    64 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    10 days after the preceding date shown.

    Source: TDLR filing

    View source record
  5. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    47 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Cedar Hill - Building 2 - Staci TI

Cedar Hill - Building 2 is a completed tenant improvement project located at 1300 S J Elmer Weaver FWY in Dallas, Texas. The facility passed its final TDLR accessibility inspection in July 2026, confirming that construction is complete. This new construction project added 2,260 square feet of space to an existing warehouse, expanding the total operational area to 3,496 square feet. The work included the installation of a new breakroom, a conference room, and two offices within the existing structure.

The project was filed under the name Cedar Hill - Building 2 - Staci TI, indicating the specific tenant improvement scope. LIT SRP Lebanon Cedar Hill is the owner of record for this development. The design firm of record is GSR Andrade Architects, which provided the architectural plans for the expansion. Jeffery L Kelley served as the registered accessibility specialist for the project. The total estimated cost for the construction was $2,410,137, resulting in a cost of $1066 per square foot.

Project Scope and Timeline

The construction schedule was notably efficient. The filing indicated a start date of March 2026 and a planned completion date of May 2026. This scheduled build window of 74 days is shorter than the county median of 243 days for similar new construction filings in Dallas County. The project was registered with the Texas Department of Licensing and Regulation (TDLR) in February 2026. Plan review was completed in May 2026, and the final inspection was passed in July 2026, marking the end of the construction phase.

This project is part of a larger portfolio for the owner, who has six other TDLR-registered projects totaling $4,482,238. These include other Cedar Hill buildings in Dallas and Cedar Hill. The design firm, GSR Andrade Architects, has also been involved in six other registered projects totaling $15,988,512, including several buildings in the Prosper Flex Park complex. The estimated cost for this specific project is above the county median of $950,000 for new construction in Dallas County. The cost per square foot is also above the county median of $125.

The project is located in ZIP code 75104, which has a population of about 49,425 according to U.S. Census ACS 2023 five-year estimates. The median household income in this area is $91,147. The housing market in this ZIP code is mostly owner-occupied, with a median owner-occupied home value of $274,900. Dallas County unemployment rate was 3.3 percent in July 2026, higher than a year earlier. The project is privately funded and located on private land for private use.

Inspection Complete

Final inspection completed, awaiting project closure

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75104 (Dallas)

One email per change. Unsubscribe in one click. Privacy.

Cedar Hill - Building 2 - Staci TI is a New Construction project located at 1300 S J Elmer Weaver FWY, Dallas, TX 75104 in Dallas, Texas. The project has an estimated value of $2.4M covering 2,260 sq ft. LIT SRP Lebanon Cedar Hill is the property owner and GSR Andrade Architects is the design firm of record. The project was registered with TDLR on February 12, 2026.

Frequently Asked Questions

Is Cedar Hill - Building 2 open for business?

The TDLR record confirms the construction is complete and the final accessibility inspection was passed in July 2026. However, the record does not specify the official business opening date or current operating status.

Who is the owner of Cedar Hill - Building 2?

The owner of record is LIT SRP Lebanon Cedar Hill. The project is privately funded and located on private land for private use in Dallas, Texas.

What was the total cost of the project?

The estimated cost for the tenant improvement was $2,410,137. This amount covers the 2,260 square feet of new space added to the existing warehouse.

Who designed the building?

GSR Andrade Architects is the design firm of record. They provided the architectural plans for the tenant improvement expansion in the existing warehouse.

When did construction finish?

The final TDLR accessibility inspection was passed in July 2026. The filing indicated a planned completion date of May 2026, but the official completion is marked by the July inspection.

What is Cedar Hill - Building 2 - Staci TI?

Cedar Hill - Building 2 - Staci TI is a new construction project at 1300 S J Elmer Weaver FWY in Dallas, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: The proposed project is a 2,260 sq.ft. tenant improvement expansion with their existing 3,496 sq.ft. space that includes new breakroom, conference room, and 2 offices within an existing warehouse in Dallas, TX.

Is Cedar Hill - Building 2 - Staci TI open in Dallas?

Construction on Cedar Hill - Building 2 - Staci TI is complete — TDLR records show the project passed its required accessibility inspection in Jul 2026. The building is finished and very likely open.

Where is Cedar Hill - Building 2 - Staci TI located?

Cedar Hill - Building 2 - Staci TI is located at 1300 S J Elmer Weaver FWY, Dallas, TX, 75104, in Dallas County.

Who is the owner or developer of Cedar Hill - Building 2 - Staci TI?

LIT SRP Lebanon Cedar Hill is the property owner/developer of record for Cedar Hill - Building 2 - Staci TI, per its TDLR project registration.

Who is the architect or design firm for Cedar Hill - Building 2 - Staci TI?

GSR Andrade Architects is the design firm of record for Cedar Hill - Building 2 - Staci TI, according to its TDLR filing.

How much does Cedar Hill - Building 2 - Staci TI cost and how big is it?

Cedar Hill - Building 2 - Staci TI has an estimated construction value of $2.4M and approximately 2,260 square feet (about $1.07K/sqft), based on its TDLR filing.

Scope of Work

The proposed project is a 2,260 sq.ft. tenant improvement expansion with their existing 3,496 sq.ft. space that includes new breakroom, conference room, and 2 offices within an existing warehouse in Dallas, TX.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

1300 S J Elmer Weaver FWY, Dallas, TX, 75104

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 75104 (Dallas)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.