Funding type
This project is privately funded, on private land for private use.
Parker Hannifin/Stratoflex
220 Roberts Cut-Off Road, Fort Worth, TX, 76114
Parker Hannifin/Stratoflex is a new construction project at 220 Roberts Cut-Off Road, Fort Worth, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Apr 2027. The project has an estimated value of $45.0M across about 200,900 sq ft.
- Estimated project value
- $45.0M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 200,900 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $224/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 1 year
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
48 days after the preceding date shown.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
4 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
361 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Parker Hannifin/Stratoflex
The Parker Hannifin New Facility is a 200,900-square-foot manufacturing project under construction at 220 Roberts Cut-Off Road in Fort Worth, Texas. Listed in filings as Parker Hannifin/Stratoflex, this new construction effort is located on existing developed property in Tarrant County. With an estimated cost of $45,000,000, the build represents a significant industrial addition to the area. The registered accessibility specialist for the project is Michael Lynn Kelley.
Project Scope and Design
Bennett Partners serves as the design firm of record for the Parker Hannifin New Facility. The scope involves the construction of a new manufacturing facility, with the filing specifying a total area of 200,900 square feet. The project is privately funded, located on private land, and intended for private use. This scale places the construction well above the typical residential or small commercial projects seen in the region, reflecting a dedicated industrial footprint.
TDLR completed plan review in April 2026, and construction is scheduled to finish in April 2027, with work starting April 2026. The status is listed as Review Complete. This timeline aligns with a standard build window for a facility of this magnitude, allowing for the necessary structural and utility improvements required for a manufacturing operation.
Local Context and Records
City of Fort Worth permit records show three permits on file at this street address, issued between September 2025 and January 2026. These include two Commercial Grading Permits and one Urban Forestry permit. The most recent permit description references the construction of a new manufacturing facility, including paving and utility improvements. This indicates that site preparation and grading work were initiated prior to the main structural build.
In the broader Tarrant County market, the Parker Hannifin New Facility’s estimated cost is above the county median for new construction filings. The median estimated cost for similar filings in the county is $800,000, while this project is valued at $45,000,000. The cost per square foot for this facility is $224, which is also above the county median of $120 per square foot. Bennett Partners has been involved in other TDLR-registered projects in Fort Worth, including work for All Saints Episcopal School and Tucker’s Grocery, demonstrating a consistent presence in local commercial and institutional development.
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 76114 (Fort Worth)
One email per change. Unsubscribe in one click. Privacy.
Parker Hannifin/Stratoflex is a New Construction project located at 220 Roberts Cut-Off Road, Fort Worth, TX 76114 in Fort Worth, Texas. The project has an estimated value of $45.0M covering 200,900 sq ft. STRATOFLEX, INC. is the property owner and Bennett Partners is the design firm of record. The project was registered with TDLR on February 12, 2026.
Frequently Asked Questions
Is the Parker Hannifin facility open for business?
No, the facility is under construction. TDLR records indicate plan review was completed in April 2026, and construction is scheduled to finish in April 2027.
What is the total size of the new facility?
The new manufacturing facility is 200,900 square feet. This figure is taken directly from the TDLR registered accessibility filing for the project.
Who is the design firm for this project?
Bennett Partners is the design firm of record for the Parker Hannifin New Facility in Fort Worth.
What is the estimated cost of construction?
The estimated cost for the new manufacturing facility is $45,000,000. This amount is significantly higher than the median cost for new construction in Tarrant County.
When is construction expected to be completed?
Construction is scheduled to finish in April 2027. Work began in April 2026 following the completion of plan review by TDLR.
What is Parker Hannifin/Stratoflex?
Parker Hannifin/Stratoflex is a new construction project at 220 Roberts Cut-Off Road in Fort Worth, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New manufacturing facility on existing developed property. 200,900 sf
Is Parker Hannifin/Stratoflex open in Fort Worth?
Parker Hannifin/Stratoflex is still under construction in Fort Worth, TX, with an estimated completion of Apr 2027 according to its TDLR registration.
Where is Parker Hannifin/Stratoflex located?
Parker Hannifin/Stratoflex is located at 220 Roberts Cut-Off Road, Fort Worth, TX, 76114, in Tarrant County.
Who is the owner or developer of Parker Hannifin/Stratoflex?
STRATOFLEX, INC. is the property owner/developer of record for Parker Hannifin/Stratoflex, per its TDLR project registration.
Who is the architect or design firm for Parker Hannifin/Stratoflex?
Bennett Partners is the design firm of record for Parker Hannifin/Stratoflex, according to its TDLR filing.
How much does Parker Hannifin/Stratoflex cost and how big is it?
Parker Hannifin/Stratoflex has an estimated construction value of $45.0M and approximately 200,900 square feet (about $224/sqft), based on its TDLR filing.
Scope of Work
New manufacturing facility on existing developed property. 200,900 sf
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
220 Roberts Cut-Off Road, Fort Worth, TX, 76114
Related Projects
Related City Permits
Building permits found at or near this location
Construction of a new manufacturing facility. Improvements include new drive lanes and site utilities.
Construction of new manufacturing facility and paving/utility improvements. Existing manufacturing facility to be demolished.
A proposed new facility is being proposed for the property where an existing facility is located. The existing facility will be removed post construction of the new facility. This will also be developed in Phases; new building phase 1, removal of existing facility and parking lot will be phase 2 development.
Watch all construction in 76114 (Fort Worth)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Fort Worth?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.