Flair 55 Salon
Flair 55 Salon is a renovation/alteration project at 23718 IH 10W Ste. 104, San Antonio, in Bexar County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $130K across about 1,800 sq ft.
๐Project Metrics
TDLR #TABS2026012814Review Complete
Design review complete, construction may proceed
Flair 55 Salon is a Renovation/Alteration project located at 23718 IH 10W Ste. 104, San Antonio, TX 78257 in San Antonio, Texas. The project has an estimated value of $130K covering 1,800 sq ft. Leon Creek, Ltd. is the property owner and MAAD Architecture is the design firm of record. The project was registered with TDLR on February 17, 2026.
โFrequently Asked Questions
What is Flair 55 Salon?
Flair 55 Salon is a renovation/alteration project at 23718 IH 10W Ste. 104 in San Antonio, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior finish out of existing 1,800 sf space for salon studio.
Is Flair 55 Salon open in San Antonio?
Flair 55 Salon is currently under construction in San Antonio, TX. Its current TDLR status is "Review Complete".
Where is Flair 55 Salon located?
Flair 55 Salon is located at 23718 IH 10W Ste. 104, San Antonio, TX, 78257, in Bexar County.
Who is the owner or developer of Flair 55 Salon?
Leon Creek, Ltd. is the property owner/developer of record for Flair 55 Salon, per its TDLR project registration.
Who is the architect or design firm for Flair 55 Salon?
MAAD Architecture is the design firm of record for Flair 55 Salon, according to its TDLR filing.
How much does Flair 55 Salon cost and how big is it?
Flair 55 Salon has an estimated construction value of $130K and approximately 1,800 square feet (about $72/sqft), based on its TDLR filing.
๐Scope of Work
Interior finish out of existing 1,800 sf space for salon studio.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Feb 17, 2026
Review Complete
Apr 12, 2026
Inspection Complete
Closed
54d
Review duration