Project intelligenceTDLR TABS2026013061Additions to Existing Building
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

RISD North JH in Richardson, TX

1820 Floyd, Richardson, TX, 75081

Opening ~Dec 2028Project Registered

RISD North JH is a additions to existing building project at 1820 Floyd, Richardson, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Dec 2028. The project has an estimated value of $97.5M across about 202,518 sq ft.

Estimated project value
$97.5M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
202,518 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$481/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
2y 8mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

Explore the linked construction record and source history

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Feb 19, 20261,045 days across supplied datesDec 30, 2028

3 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    81 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    964 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About RISD North JH

Richardson Independent School District is undertaking a major expansion of its North Junior High School campus at 1820 Floyd, Richardson, TX 75081. This project involves additions and renovations to the existing building, with a total estimated cost of $97,500,000. The scope covers 202,518 square feet of new and modified space, resulting in a computed cost of $481 per square foot.

The registration was filed with the Texas Department of Licensing and Regulation (TDLR) in February 2026. The project status is listed as Project Registered, with plan review pending. Construction is scheduled to begin in May 2026, and completion is targeted for December 2028. This timeline represents a scheduled build window of 964 days, which is longer than the Dallas County median of 182 days for similar additions to existing buildings.

Design and Ownership

Stantec Architecture Inc. is the design firm of record for this project. The registered accessibility specialist on the filing is Ernesto Sarabia. Richardson ISD is the owner of record, which also has five other TDLR-registered school projects totaling $1,395,268,340 across Richardson and Dallas. These include Westwood Junior High School, Parkhill Junior High School, and Apollo Middle School.

Financially, this project is significant compared to local benchmarks. The estimated cost is above the Dallas County median for additions to existing buildings, which stands at $632,000. The cost per square foot of $481 is also above the county median of $161. The project involves public funds and public land, consistent with its status as a school district facility.

The surrounding area, ZIP code 75081, has a population of about 36,065 and a median household income of $90,953 according to U.S. Census estimates. Richardson North Junior High serves 7th and 8th grade students, with an enrollment of 665 students as noted by third-party education directories.

Project Registered

Project has been registered with TDLR and is in pre-construction phase

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75081 (Richardson)

One email per change. Unsubscribe in one click. Privacy.

RISD North JH is a Additions to Existing Building project located at 1820 Floyd, Richardson, TX 75081 in Richardson, Texas. The project has an estimated value of $97.5M covering 202,518 sq ft. Richardson ISD is the property owner and Stantec Architecture Inc. is the design firm of record. The project was registered with TDLR on February 19, 2026.

Frequently Asked Questions

Is North Junior High School open?

The TDLR record indicates construction is targeted for December 2028. It does not confirm current operational status or opening dates, only that the project is registered and under review.

Who is building the new additions at North Junior High?

Richardson ISD is the owner of record. Stantec Architecture Inc. is the design firm, and Ernesto Sarabia is the registered accessibility specialist.

How much does the North Junior High renovation cost?

The estimated cost is $97,500,000. This is above the Dallas County median for similar projects, which is $632,000.

When will the North Junior High project be finished?

Completion is targeted for December 2028. Construction is scheduled to start in May 2026, following a registration date of February 2026.

What is RISD North JH?

RISD North JH is a additions to existing building project at 1820 Floyd in Richardson, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Additions and renovations to the existing Richardson North Junior High.

Is RISD North JH open in Richardson?

RISD North JH is still under construction in Richardson, TX, with an estimated completion of Dec 2028 according to its TDLR registration.

Where is RISD North JH located?

RISD North JH is located at 1820 Floyd, Richardson, TX, 75081, in Dallas County.

Who is the owner or developer of RISD North JH?

Richardson ISD is the property owner/developer of record for RISD North JH, per its TDLR project registration.

Who is the architect or design firm for RISD North JH?

Stantec Architecture Inc. is the design firm of record for RISD North JH, according to its TDLR filing.

How much does RISD North JH cost and how big is it?

RISD North JH has an estimated construction value of $97.5M and approximately 202,518 square feet (about $481/sqft), based on its TDLR filing.

Scope of Work

Additions and renovations to the existing Richardson North Junior High.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

1820 Floyd, Richardson, TX, 75081

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 75081 (Richardson)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Richardson?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.