Project intelligenceTDLR TABS2026013247Renovation/Alteration
Funding type

This project is privately funded, on private land for private use.

Generator Installation

400 West 15th St, Austin, TX, 78701

Target date passed (Jun 2026)Project Registered

Generator Installation is a renovation/alteration project at 400 West 15th St, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Jun 2026 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $350K across about 458 sq ft.

Estimated project value
$350K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
458 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$764/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
3 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Feb 23, 2026123 days across supplied datesJun 26, 2026

3 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    35 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    88 days after the preceding date shown.

    Source: TDLR filing

    View source record

Project Registered

Project has been registered with TDLR and is in pre-construction phase

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78701 (Austin)

One email per change. Unsubscribe in one click. Privacy.

Generator Installation is a Renovation/Alteration project located at 400 West 15th St, Austin, TX 78701 in Austin, Texas. The project has an estimated value of $350K covering 458 sq ft. AFIAA WFT LLC is the property owner and Sixthriver Architects is the design firm of record. The project was registered with TDLR on February 23, 2026.

Frequently Asked Questions

What is Generator Installation?

Generator Installation is a renovation/alteration project at 400 West 15th St in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: ADDITION OF OUTDOOR NATURAL GAS STANDBY GENERATOR

Is Generator Installation open in Austin?

Generator Installation was scheduled to finish construction in Jun 2026 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is Generator Installation located?

Generator Installation is located at 400 West 15th St, Austin, TX, 78701, in Travis County.

Who is the owner or developer of Generator Installation?

AFIAA WFT LLC is the property owner/developer of record for Generator Installation, per its TDLR project registration.

Who is the architect or design firm for Generator Installation?

Sixthriver Architects is the design firm of record for Generator Installation, according to its TDLR filing.

How much does Generator Installation cost and how big is it?

Generator Installation has an estimated construction value of $350K and approximately 458 square feet (about $764/sqft), based on its TDLR filing.

Scope of Work

ADDITION OF OUTDOOR NATURAL GAS STANDBY GENERATOR

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

400 West 15th St, Austin, TX, 78701

Location by street address

Related City Permits

Building permits found at or near this location

4003 GREENHILL PL

BASE: Installing a backup battery system and additional meter socket.

ActiveElectrical PermitAuxiliary PowerSep 2026
View Details
2026-111505 EP
Base Power
400 LAVACA ST

This project includes renovations to the hotel level 1 lobby/restaurant and hotel level 7 pool deck areas. Work will be split into phases to keep life safety systems for both areas of the renovation intact. Phase 3 - Demolition and renovation of new parlor area.

ActiveElectrical PermitRemodelSep 2026
View Details
2026-046291 EP
Dynamic Electric INC
4006 RIDGELEA DR

Replacement of complete existing central heat and air system with or without duct work

ActiveMechanical PermitChange OutSep 2026
View Details
2026-115270 MP
SERVICE WIZARD LLC
4001 GALACIA DR

BASE: Installing a backup battery system and additional meter socket.

ActiveElectrical PermitAuxiliary PowerSep 2026
View Details
2026-108904 EP
Base Power
4006 NORTH HILLS DR

Tunnel under foundation to replace cast iron drain lines for primary bathroom and hall bathroom only. Two access holes: one on right side of home second in back left side of home. Tunnel approx. 50 ft. Sewer line replaced from home to city tap connection. Sewer line approx. 45 ft.

FinalPlumbing PermitRepairSep 2026
View Details
2026-114457 PP
Calixto Plumbing

Watch all construction in 78701 (Austin)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.