Traffic Signal Improvements in Dallas, TX

Mountain Crk/Fox Crk, Lake June/Houghton, Knox/Kat, Dallas, TX, 75201

Opening ~May 2027Review Complete

Traffic Signal Improvements is a new construction project at Mountain Crk/Fox Crk, Lake June/Houghton, Knox/Kat, Dallas, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion May 2027. The project has an estimated value of $50K across about 1,000 sq ft.

Estimated project value
$50K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
1,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$50/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
9 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

Explore the linked construction record and source history

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Feb 26, 2026429 days across supplied datesMay 1, 2027

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    70 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    86 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    273 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Traffic Signal Improvements

The City of Dallas is installing new traffic signals at the Mountain Crk/Fox Crk, Lake June/Houghton, Knox/Katy Tr intersection in Dallas, TX 75201. This new construction project involves the installation of new traffic signals at 3 intersections. The work is registered with TDLR under the project name Traffic Signal Improvements and is scheduled to finish in May 2027.

Construction is set to begin in August 2026, following the completion of plan review in May 2026. The total estimated cost for the project is $50,000, which corresponds to a rate of $50 per square foot across the 1,000 sq ft of designated work area. This figure is below the county median for similar new construction filings in Dallas County, which stands at $950,000 for projects of this type.

Project Details and Design

Lee Engineering is the design firm of record for this initiative. The firm has registered six other TDLR projects in the region, with a combined value of $300,000, indicating a consistent focus on intersection improvements. Ross A Thomas serves as the registered accessibility specialist for this filing. The project utilizes public funds and is located on public land, qualifying it as a Federally funded roadway project.

The City of Dallas is the owner of record, which has five other registered projects totaling $40,850,000 in Dallas County. These include major infrastructure works such as the East Pump Station at DFW Airport and the Marcus Park Recreation Center. The scheduled build window for the Mountain Crk/Fox Crk, Lake June/Houghton, Knox/Katy Tr signals is 273 days, a duration close to the county median of 243 days for comparable new construction.

Local Context

The project area is part of ZIP code 75201, which has a population of approximately 18,078 residents. The median household income in this area is estimated at $101,098, with a median owner-occupied home value of $649,700. Housing in this specific zone is predominantly renter-occupied. The Dallas County unemployment rate was recorded at 3.3 percent in July 2026, a figure higher than the rate recorded a year earlier.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75201 (Dallas)

One email per change. Unsubscribe in one click. Privacy.

Traffic Signal Improvements is a New Construction project located at Mountain Crk/Fox Crk, Lake June/Houghton, Knox/Kat, Dallas, TX 75201 in Dallas, Texas. The project has an estimated value of $50K covering 1,000 sq ft. City of Dallas is the property owner and Lee Engineering is the design firm of record. The project was registered with TDLR on February 26, 2026.

Frequently Asked Questions

When will the traffic signals be finished?

Construction is scheduled to finish in May 2027, with work starting in August 2026 after plan review was completed in May 2026.

How much does the project cost?

The estimated cost is $50,000, which is below the county median for new construction projects in Dallas County.

What is the scope of the work?

The project involves the installation of new traffic signals at 3 intersections.

Is the business open?

This is a construction project for traffic signals, not a business establishment. The status is construction-related, not operational.

What is Traffic Signal Improvements?

Traffic Signal Improvements is a new construction project at Mountain Crk/Fox Crk, Lake June/Houghton, Knox/Kat in Dallas, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Installation of New Traffic Signals at 3 intersections

Is Traffic Signal Improvements open in Dallas?

Traffic Signal Improvements is still under construction in Dallas, TX, with an estimated completion of May 2027 according to its TDLR registration.

Where is Traffic Signal Improvements located?

Traffic Signal Improvements is located at Mountain Crk/Fox Crk, Lake June/Houghton, Knox/Kat, Dallas, TX, 75201, in Dallas County.

Who is the owner or developer of Traffic Signal Improvements?

City of Dallas is the property owner/developer of record for Traffic Signal Improvements, per its TDLR project registration.

Who is the architect or design firm for Traffic Signal Improvements?

Lee Engineering is the design firm of record for Traffic Signal Improvements, according to its TDLR filing.

How much does Traffic Signal Improvements cost and how big is it?

Traffic Signal Improvements has an estimated construction value of $50K and approximately 1,000 square feet (about $50/sqft), based on its TDLR filing.

Scope of Work

Installation of New Traffic Signals at 3 intersections

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

Mountain Crk/Fox Crk, Lake June/Houghton, Knox/Kat, Dallas, TX, 75201

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 75201 (Dallas)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.