๐Ÿ“‹Project Registered๐Ÿ”ง Renovation/Alteration๐Ÿ’ต This project is privately funded, on private land for private use.

CSA Manufacturing Facility

1609 FM 3349, Taylor, TX 76574, Taylor, TX, 76574
Pre-Construction15%

๐Ÿ“ŠProject Metrics

TDLR #TABS2026013901
$150.0M
Project Value
390,515
Square Feet
$384/sqft
Cost/SqFt
8 months
Duration
Registered:Mar 2, 2026
Start:Feb 10, 2026
Target:Oct 10, 2026
Remaining:221 days
๐Ÿ“‹

Project Registered

Project has been registered with TDLR and is in pre-construction phase

๐Ÿ“‹Scope of Work

Remodel existing shell building into a server assembly factory with warehouse and office space. 390,515 Square Feet.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

๐Ÿ“…Compliance Timeline

Project Registered
March 2, 2026
Construction Start
February 10, 2026
Expected Completion
October 10, 2026

๐Ÿ“Location & Views

Open in MapsGet Directions|30.53188, -97.48695

๐Ÿ“„Related City Permits

Building permits found at or near this location

1609 WESTOVER RD
22.73 mi away

Construct new driveway approach of 11 FT and walkway of 5.1 LF

FinalDriveway / SidewalksNewJan 2026
View Details
2025-161328 DS
1609 CANTERBURY ST--BLDG 1--POOL
23.89 mi away

ePlan: Residential Expedited Review - New Autofill Pool w/SPA. Bldg 1

ActiveElectrical PermitNewJan 2026
View Details
2025-026822 EP
๐Ÿ”งD.A.S Electric
1609 ALAMEDA DR
25.06 mi away

Add HVAC. Relocate the existing laundry to the closet. Repair and replace plumbing and gas lines as needed. Add recessed lighting and additional outlets. Convert tub to shower. Move the bathroom sink and toilet to meet code requirements. Relocate kitchen sink to different wall in kitchen. **Add additional wiring for new outlets smoke/CO2 alarms exhaust fans and recessed lighting described in existing permit. Add new electric service panel new electric meter and wiring to accommodate addition of new HVAC described in existing permit.

ActiveElectrical PermitAddition and RemodelDec 2025
View Details
2025-133115 EP
๐Ÿ”งAT ELECTRICAL LLC
1609 ALAMEDA DR
25.06 mi away

Add HVAC. Relocate the existing laundry to the closet. Repair and replace plumbing and gas lines as needed. Add recessed lighting and additional outlets. Convert tub to shower. Move the bathroom sink and toilet to meet code requirements. Relocate kitchen sink to different wall in kitchen.

ActiveMechanical PermitAddition and RemodelNov 2025
View Details
2025-133115 MP
๐Ÿ”งAdam & Sons A/C & Heating
1609 ALAMEDA DR
25.06 mi away

Add HVAC. Relocate the existing laundry to the closet. Repair and replace plumbing and gas lines as needed. Add recessed lighting and additional outlets. Convert tub to shower. Move the bathroom sink and toilet to meet code requirements. Relocate kitchen sink to different wall in kitchen.

ActivePlumbing PermitAddition and RemodelNov 2025
View Details
2025-133115 PP
๐Ÿ”งH&M PLUMBING

Quick Actions

TDLR ID: TABS2026013901

Property Owner

๐Ÿ‘ค
PDC TP 01 LOT A LLC
View all projects
5847 San Felipe St Ste 1400, Houston, Texas 77057

Design Firm

๐Ÿ›๏ธ
Gensler
4 projects ยท $168.7M
View all projects
1011 South Congress Avenue Building 1, Suite 200, Austin, Texas 78704

Registered Accessibility Specialist

๐Ÿ“‹
DAVID C,DEMING
RAS #129
16222 CRYSTAL HILLS DR, AUSTIN, TX 78737

Tenant

๐Ÿข
Elena Chin

Get alerts for Williamson

Daily email when new projects start nearby.

Start Alerts - $19/mo

Download project data

Get curated lists of projects with full contact info.

Browse Data Lists