Homebound Group Water Treatment Plant and Fire Protection System
US 380 and Red Creek Road, Haskell, TX, 79521
Homebound Group Water Treatment Plant and Fire Protection System is a new construction project at US 380 and Red Creek Road, Haskell, in Haskell County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Nov 2027. The project has an estimated value of $11.7M across about 1,640 sq ft.
- Estimated project value
- $11.7M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 1,640 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $7.12K/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 1y 3mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
36 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
115 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
455 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Homebound Group Water Treatment Plant and Fire Protection System
The Homebound Group Water Treatment Plant and Fire Protection System is a new construction project located at US 380 and Red Creek Road in Haskell, Texas. The facility consists of a 1,640 square foot building designed to house booster pumps and chemical dosing equipment for water treatment. This specific structure is part of a broader infrastructure development by Homebound Group, LLC, which also includes a wastewater treatment plant in the same county.
According to the TDLR filing, the project is scheduled to finish in November 2027, with construction work commencing in August 2026. TDLR completed the plan review process in April 2026, clearing the way for the upcoming construction phase. The total estimated cost for this water treatment facility is $11,680,000, which translates to a cost of $7,122 per square foot.
Quorum Architects, Inc. is the design firm of record for this project. The company has been involved in several other significant construction projects across Texas, including operations buildings for municipal utility districts and commercial developments in the Houston area. The registered accessibility specialist for this filing is Marcela Abadi Rhoads, ensuring the design meets required standards.
Project Scope and Financials
The scope of work is strictly defined as the construction of a new 1,640 square foot water treatment plant booster pump and chemical dosing building. The project is privately funded and located on private land for private use. At $11.68 million, the estimated cost is above the median estimated cost for new construction filings in Haskell County, which stands at $3,227,625. The cost per square foot of $7,122 is also significantly above the county median of $618 per square foot, reflecting the specialized nature of water treatment infrastructure.
Local Context and Timeline
The scheduled build window for this project is 455 days, which is longer than the median build window of 358 days for similar projects in the county. Haskell County has a population of approximately 3,470 people, with a median household income of $61,609. The development of new water treatment infrastructure is a significant investment in the local utility capacity, supporting the needs of the community and potentially nearby agricultural or industrial operations.
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 79521 (Haskell)
One email per change. Unsubscribe in one click. Privacy.
Homebound Group Water Treatment Plant and Fire Protection System is a New Construction project located at US 380 and Red Creek Road, Haskell, TX 79521 in Haskell, Texas. The project has an estimated value of $11.7M covering 1,640 sq ft. Homebound Group, LLC is the property owner and Quorum Architects, Inc is the design firm of record. The project was registered with TDLR on March 5, 2026.
Frequently Asked Questions
When is the water treatment plant scheduled to be finished?
Construction is scheduled to finish in November 2027, with work starting in August 2026. TDLR completed plan review in April 2026.
What is the total estimated cost of the project?
The estimated cost for the new water treatment plant and fire protection system is $11,680,000.
Who is the design firm for this project?
Quorum Architects, Inc. is the design firm of record for the Homebound Group Water Treatment Plant.
Is the business open?
The project is under construction and not yet open. It is scheduled to finish in November 2027.
What is Homebound Group Water Treatment Plant and Fire Protection System?
Homebound Group Water Treatment Plant and Fire Protection System is a new construction project at US 380 and Red Creek Road in Haskell, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: A new 1640 SF water treatment plant booster pump and chemical dosing building.
Is Homebound Group Water Treatment Plant and Fire Protection System open in Haskell?
Homebound Group Water Treatment Plant and Fire Protection System is still under construction in Haskell, TX, with an estimated completion of Nov 2027 according to its TDLR registration.
Where is Homebound Group Water Treatment Plant and Fire Protection System located?
Homebound Group Water Treatment Plant and Fire Protection System is located at US 380 and Red Creek Road, Haskell, TX, 79521, in Haskell County.
Who is the owner or developer of Homebound Group Water Treatment Plant and Fire Protection System?
Homebound Group, LLC is the property owner/developer of record for Homebound Group Water Treatment Plant and Fire Protection System, per its TDLR project registration.
Who is the architect or design firm for Homebound Group Water Treatment Plant and Fire Protection System?
Quorum Architects, Inc is the design firm of record for Homebound Group Water Treatment Plant and Fire Protection System, according to its TDLR filing.
How much does Homebound Group Water Treatment Plant and Fire Protection System cost and how big is it?
Homebound Group Water Treatment Plant and Fire Protection System has an estimated construction value of $11.7M and approximately 1,640 square feet (about $7.12K/sqft), based on its TDLR filing.
Scope of Work
A new 1640 SF water treatment plant booster pump and chemical dosing building.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
US 380 and Red Creek Road, Haskell, TX, 79521
Related Projects
Same Owner
$23.4M totalWatch all construction in 79521 (Haskell)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Haskell?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.