Funding type
This project is privately funded, on private land for private use.
Hub on Campus @ in College Station, TX
503 Cherry Street, College Station, TX, 77840
Hub on Campus @ is a new construction project at 503 Cherry Street, College Station, in Brazos County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Jun 2028. The project has an estimated value of $130.0M across about 1,120,079 sq ft.
- Estimated project value
- $130.0M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 1,120,079 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $116/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 2y 1mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
51 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
10 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
757 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Hub on Campus @
Hub on Campus @ College Station is a new 8-story residential building with 406 units and a 10-story parking structure located at 503 Cherry Street in the Northgate area of College Station. The project encompasses 1,120,079 square feet of floor area and is estimated to cost $129,969,514. TDLR completed plan review in April 2026, and construction is scheduled to finish in June 2028, with work starting May 2026.
The owner of record is Core College Station Nagle LLC, and Antunovich Associates is the design firm of record. The registered accessibility specialist is Steven Edward Montgomery. This project is privately funded on private land for private use. The TDLR status is listed as Review Complete.
In Brazos County, the median estimated cost for new construction is $700,000. This project’s cost is above the county median for its type, placing it in the top quarter of filings. The scheduled build window of 757 days is longer than the county median of 212 days. The cost per square foot is $116, which is close to the county median of $116 per square foot.
Design and Context
Antunovich Associates has four other TDLR-registered projects totaling $15,200,000. These include the New Repair Shop Renovation in San Antonio, WPi - Komatsu in Beaumont, H & E Equipment in Conroe, and McKinney Texas Branch in McKinney. Other registered projects in the same area include Teaching Gardens, The London Apartments, and the YMCA Building.
According to U.S. Census ACS 2023 five-year estimates for ZIP 77840, the population is about 55,186. The median household income is $31,278, and there are 25,423 housing units. The median owner-occupied home value is $241,000, and housing is predominantly renter-occupied. The Brazos County unemployment rate was 5.4 percent in June 2026, higher than a year earlier.
Third-party sources describe the project with varying details. A post by huboncampus.com states the project is built to bring heritage home, inspired by true Texas character. An Instagram post by popular mentions Texas A&M University's central bus hub opened on Lamar Street in August 2025. A Facebook post by fb-answers describes the Hub on Campus College Station as referring to several different student spaces. houstonarchitecture.com notes the website is live with no graphics of the building.
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 77840 (College Station)
One email per change. Unsubscribe in one click. Privacy.
Hub on Campus @ is a New Construction project located at 503 Cherry Street, College Station, TX 77840 in College Station, Texas. The project has an estimated value of $130.0M covering 1,120,079 sq ft. Core College Station Nagle LLC is the property owner and Antunovich Associates is the design firm of record. The project was registered with TDLR on March 6, 2026.
Frequently Asked Questions
Is Hub on Campus open?
The TDLR record shows construction is scheduled to finish in June 2028. Third-party posts mention related student spaces, but the TDLR filing does not confirm the building is open for occupancy.
Who is the developer?
Core College Station Nagle LLC is listed as the owner and developer of record for this specific residential construction project in College Station.
How many units are in the building?
The new construction scope includes a total of 406 residential units within the 8-story building structure.
Who designed the building?
Antunovich Associates is the design firm of record for this project, which includes the residential building and parking structure.
What is the estimated cost?
The estimated cost for the project is $129,969,514, which is above the county median for new construction filings.
What is Hub on Campus @?
Hub on Campus @ is a new construction project at 503 Cherry Street in College Station, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Construct new 8-story residential building with 406 units and 10-story parking structure w/ residential amenities. 1,120,070 sf area.
Is Hub on Campus @ open in College Station?
Hub on Campus @ is still under construction in College Station, TX, with an estimated completion of Jun 2028 according to its TDLR registration.
Where is Hub on Campus @ located?
Hub on Campus @ is located at 503 Cherry Street, College Station, TX, 77840, in Brazos County.
Who is the owner or developer of Hub on Campus @?
Core College Station Nagle LLC is the property owner/developer of record for Hub on Campus @, per its TDLR project registration.
Who is the architect or design firm for Hub on Campus @?
Antunovich Associates is the design firm of record for Hub on Campus @, according to its TDLR filing.
How much does Hub on Campus @ cost and how big is it?
Hub on Campus @ has an estimated construction value of $130.0M and approximately 1,120,079 square feet (about $116/sqft), based on its TDLR filing.
Scope of Work
Construct new 8-story residential building with 406 units and 10-story parking structure w/ residential amenities. 1,120,070 sf area.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
503 Cherry Street, College Station, TX, 77840
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Same Design Firm
$192.1M totalWatch all construction in 77840 (College Station)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in College Station?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.