Project intelligenceTDLR TABS2026014420Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

High School Entry Improvements in Tuscola, TX

830 Garza Ave, Tuscola, TX, 79562

Construction complete · Oct 2026Inspection Complete

High School Entry Improvements is a renovation/alteration project at 830 Garza Ave, Tuscola, in Taylor County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Oct 2026). The project has an estimated value of $600K across about 690 sq ft.

Estimated project value
$600K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
690 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$870/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
3 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Mar 6, 2026210 days across supplied datesOct 2, 2026

5 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    42 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    28 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    92 days after the preceding date shown.

    Source: TDLR filing

    View source record
  5. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    48 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About High School Entry Improvements

The High School Entry Improvements project at Jim Ned CISD in Tuscola is a $600,000 renovation focused on the exterior facade and reception area. The scope covers 690 square feet of work at 830 Garza Ave. This specific filing is registered with the Texas Department of Licensing and Regulation (TDLR) as a renovation and alteration project.

Jacob Martin serves as the design firm of record for this initiative. Stephen D Macphie is the registered accessibility specialist associated with the filing. The project utilizes public funds and is situated on public land. The estimated cost of $600,000 places the project above the median estimated cost for similar renovation filings in Taylor County, which is $300,000.

Project Timeline and Status

TDLR completed the plan review process in April 2026. Construction was scheduled to begin in May 2026 and finish by August 2026. The scheduled build window of 92 days is close to the county median of 109 days for similar projects. Despite the completion date on the filing having passed, TDLR has not yet recorded a final inspection. Therefore, the current state of the site is not confirmed in the public record.

Jim Ned CISD is the owner of record and has six other TDLR-registered projects totaling $16,785,000. These include significant investments in Tuscola and Abilene, with most showing inspection complete status. The design firm, Jacob Martin, has six other registered projects totaling $7,341,250, indicating a consistent presence in the region’s construction landscape. The project’s cost per square foot is $870, which is above the county median of $89 for renovation and alteration work.

Local Context

Tuscola is located in Taylor County, a region with a population of about 4,567 according to U.S. Census ACS 2023 estimates for ZIP 79562. The median household income in this area is $103,814, and the median owner-occupied home value is $239,100. Housing in this ZIP code is predominantly owner-occupied. The Taylor County unemployment rate was 3.9 percent in July 2026, higher than a year earlier, reflecting local labor market conditions during the project’s scheduled construction period.

Inspection Complete

Final inspection completed, awaiting project closure

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 79562 (Tuscola)

One email per change. Unsubscribe in one click. Privacy.

High School Entry Improvements is a Renovation/Alteration project located at 830 Garza Ave, Tuscola, TX 79562 in Tuscola, Texas. The project has an estimated value of $600K covering 690 sq ft. Jim Ned CISD is the property owner and Jacob Martin is the design firm of record. The project was registered with TDLR on March 6, 2026.

Frequently Asked Questions

What is the scope of the work at Jim Ned CISD?

The project involves the renovation of the exterior facade and reception area. It is classified as a renovation and alteration project covering 690 square feet.

Who is the design firm for this project?

Jacob Martin is the design firm of record. Stephen D Macphie is the registered accessibility specialist for the filing.

Is the project finished?

TDLR has not yet recorded a final inspection. While construction was scheduled to finish in August 2026, the current site status is not confirmed in the public record.

How much does the project cost?

The estimated cost is $600,000. This is above the median cost for similar renovation projects in Taylor County, which is $300,000.

What is the address of the project?

The project is located at 830 Garza Ave, Tuscola, TX 79562, in Taylor County.

What is High School Entry Improvements?

High School Entry Improvements is a renovation/alteration project at 830 Garza Ave in Tuscola, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovation of exterior facade and reception

Is High School Entry Improvements open in Tuscola?

Construction on High School Entry Improvements is complete — TDLR records show the project passed its required accessibility inspection in Oct 2026. The building is finished and very likely open.

Where is High School Entry Improvements located?

High School Entry Improvements is located at 830 Garza Ave, Tuscola, TX, 79562, in Taylor County.

Who is the owner or developer of High School Entry Improvements?

Jim Ned CISD is the property owner/developer of record for High School Entry Improvements, per its TDLR project registration.

Who is the architect or design firm for High School Entry Improvements?

Jacob Martin is the design firm of record for High School Entry Improvements, according to its TDLR filing.

How much does High School Entry Improvements cost and how big is it?

High School Entry Improvements has an estimated construction value of $600K and approximately 690 square feet (about $870/sqft), based on its TDLR filing.

Scope of Work

Renovation of exterior facade and reception

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

830 Garza Ave, Tuscola, TX, 79562

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 79562 (Tuscola)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.