Project intelligenceTDLR TABS2026014971Additions to Existing Building
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

New Junior High School in Banquete, TX

4334 FOURTH ST, Banquete, TX, 78339

Opening ~Dec 2027Review Complete

New Junior High School is a additions to existing building project at 4334 FOURTH ST, Banquete, in Nueces County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Dec 2027. The project has an estimated value of $30.0M across about 66,780 sq ft.

Estimated project value
$30.0M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
66,780 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$449/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 8mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

Explore the linked construction record and source history

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Mar 13, 2026658 days across supplied datesDec 31, 2027

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    41 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    7 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    610 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About New Junior High School

Banquete Independent School District is building a new junior high school at 4334 Fourth St, Banquete, Texas. The project, filed as New Junior High School, involves additions to an existing building and the renovation of the cafeteria and Locke room. The total estimated cost is $30,000,000 for 66,780 sq ft of work, equating to $449 per square foot.

Construction is scheduled to finish in December 2027, with work starting in April 2026. TDLR completed plan review in April 2026, and the project status is listed as Review Complete. The registered accessibility specialist for this filing is Jonathan Eric Rivera.

Design and Scope

CLK Architects & Associates is the design firm of record. The scope of work includes the new junior high school facility along with specific renovations to the existing cafeteria and Locke room. The owner of record is Adriana Tagle. This project involves public funds and public land.

The surrounding area includes Pena's Grocery & Deli, St. Michael the Archangel Catholic Church, Anthony Cuellar Party Place, and the Banquete Senior Citizens Center.

Context and Comparisons

This filing is part of a broader portfolio for CLK Architects & Associates, which has six other TDLR-registered projects totaling $31,247,309. These include the Driscoll Field of Dreams in Corpus Christi and the Free Standing Emergency Center in Portland. The estimated cost for this Banquete project is above the county median for additions to existing buildings, which is $350,000. The scheduled build window of 610 days is longer than the county median of 182 days.

Banquete Independent School District serves a community with a population of about 362, according to U.S. Census ACS 2023 estimates for ZIP 78339. The median household income in this area is $108,636. Nueces County unemployment was 4.9 percent in July 2026, higher than a year earlier.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78339 (Banquete)

One email per change. Unsubscribe in one click. Privacy.

New Junior High School is a Additions to Existing Building project located at 4334 FOURTH ST, Banquete, TX 78339 in Banquete, Texas. The project has an estimated value of $30.0M covering 66,780 sq ft. Adriana Tagle is the property owner and CLK Architects & Associates is the design firm of record. The project was registered with TDLR on March 13, 2026.

Frequently Asked Questions

When is the Banquete ISD junior high school expected to be finished?

Construction is scheduled to finish in December 2027. Work started in April 2026, and TDLR completed plan review in April 2026.

Who is the architect for the new Banquete junior high school?

CLK Architects & Associates is the design firm of record. The registered accessibility specialist is Jonathan Eric Rivera.

How much does the new Banquete ISD project cost?

The estimated cost is $30,000,000 for 66,780 sq ft. This equates to $449 per square foot.

Is the Banquete ISD junior high school open?

The TDLR record indicates construction is scheduled to finish in December 2027. The filing does not state that the facility is open or operating.

What is the scope of work for the Banquete ISD project?

The scope includes a new junior high school and renovation of the cafeteria and Locke room.

What is New Junior High School?

New Junior High School is a additions to existing building project at 4334 FOURTH ST in Banquete, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New Junior High School and renovation of cafeteria & Locke room.

Is New Junior High School open in Banquete?

New Junior High School is still under construction in Banquete, TX, with an estimated completion of Dec 2027 according to its TDLR registration.

Where is New Junior High School located?

New Junior High School is located at 4334 FOURTH ST, Banquete, TX, 78339, in Nueces County.

Who is the owner or developer of New Junior High School?

Adriana Tagle is the property owner/developer of record for New Junior High School, per its TDLR project registration.

Who is the architect or design firm for New Junior High School?

CLK Architects & Associates is the design firm of record for New Junior High School, according to its TDLR filing.

How much does New Junior High School cost and how big is it?

New Junior High School has an estimated construction value of $30.0M and approximately 66,780 square feet (about $449/sqft), based on its TDLR filing.

Scope of Work

New Junior High School and renovation of cafeteria & Locke room.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

4334 FOURTH ST, Banquete, TX, 78339

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 78339 (Banquete)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Banquete?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.