Project intelligenceTDLR TABS2026014994New Construction
Funding type

This project is privately funded, on private land for private use.

Best Stop 7

1921 N Main St, Highland, TX, 77562

Opening ~Dec 2027Project Registered

Best Stop 7 is a new construction project at 1921 N Main St, Highland, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Dec 2027. The project has an estimated value of $1.2M across about 6,490 sq ft.

Estimated project value
$1.2M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
6,490 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$185/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
11 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

Explore the linked construction record and source history

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Mar 16, 2026643 days across supplied datesDec 19, 2027

3 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    321 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    322 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Best Stop 7

A new 6,490-square-foot commercial development is planned for 1921 N Main St in Highland, Texas. The project, known as Best Stop 7, involves the new construction of a 5,390-square-foot convenience store and a 1,100-square-foot retail space. The estimated cost for this build is $1,200,000, which calculates to $185 per square foot.

The owner of record is SH Barber Hills Property LLC, while Midstream & Terminal Services LLC is the design firm of record. This project is privately funded and developed on private land for private use. Amelia Y C Lee is the registered accessibility specialist for the filing. The registration with TDLR occurred in March 2026, and the project status is listed as Project Registered.

Construction Timeline and Scope

Construction is scheduled to begin in January 2027. The completion date on the filing is targeted for December 2027. This represents a scheduled build window of 322 days. This duration is longer than the county median of 219 days for similar new construction filings. Plan review is pending, and the project has not yet begun physical construction.

In the context of Harris County, this project’s estimated cost of $1,200,000 is above the county median of $750,000 for new construction. The size of 6,490 square feet is below the county median of 8,995 square feet. The cost per square foot of $185 is above the county median of $88. Midstream & Terminal Services LLC has six other TDLR-registered projects, including Magnolia Market in Magnolia and Roadtrac 30 in Splendora, with a combined value of $9,308,580.

The area around Highland, ZIP code 77562, has a population of about 9,805 according to U.S. Census ACS 2023 five-year estimates. The median household income in this area is $63,636, and there are 4,184 housing units. The median owner-occupied home value is $195,300. The housing stock is predominantly owner-occupied. Other registered projects in the nearby area include HSM Wheel & Tire, Riley Chambers Park, and Anchor Car Wash.

Project Registered

Project has been registered with TDLR and is in pre-construction phase

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77562 (Highland)

One email per change. Unsubscribe in one click. Privacy.

Best Stop 7 is a New Construction project located at 1921 N Main St, Highland, TX 77562 in Highland, Texas. The project has an estimated value of $1.2M covering 6,490 sq ft. SH Barber Hills Property LLC is the property owner and Midstream & Terminal Services LLC is the design firm of record. The project was registered with TDLR on March 16, 2026.

Frequently Asked Questions

Is Best Stop 7 in Highland open?

No, the project is in the planning and registration phase. Construction is scheduled to start in January 2027 and is targeted for December 2027. The business has not opened.

What is the total square footage of the project?

The total square footage is 6,490 sq ft. This includes a 5,390 sq ft convenience store and a 1,100 sq ft retail space.

Who is the developer of record?

SH Barber Hills Property LLC is the owner/developer of record for the project at 1921 N Main St, Highland, TX.

When is construction expected to finish?

The completion date on the filing is targeted for December 2027. Construction start is listed as January 2027.

What is Best Stop 7?

Best Stop 7 is a new construction project at 1921 N Main St in Highland, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: 5390 sq ft c-store and 1100 sq ft retail

Is Best Stop 7 open in Highland?

Best Stop 7 is still under construction in Highland, TX, with an estimated completion of Dec 2027 according to its TDLR registration.

Where is Best Stop 7 located?

Best Stop 7 is located at 1921 N Main St, Highland, TX, 77562, in Harris County.

Who is the owner or developer of Best Stop 7?

SH Barber Hills Property LLC is the property owner/developer of record for Best Stop 7, per its TDLR project registration.

Who is the architect or design firm for Best Stop 7?

Midstream & Terminal Services LLC is the design firm of record for Best Stop 7, according to its TDLR filing.

How much does Best Stop 7 cost and how big is it?

Best Stop 7 has an estimated construction value of $1.2M and approximately 6,490 square feet (about $185/sqft), based on its TDLR filing.

Scope of Work

5390 sq ft c-store and 1100 sq ft retail

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

1921 N Main St, Highland, TX, 77562

Location by street address

Watch all construction in 77562 (Highland)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Highland?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.