TSC
TSC is a renovation/alteration project at 301 VETERANS MEMORIAL PARKWAY (TX-243), Canton, in Van Zandt County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Sep 2026. The project has an estimated value of $1.1M across about 38,725 sq ft.
๐Project Metrics
TDLR #TABS2026015198Review Complete
Design review complete, construction may proceed
TSC is a Renovation/Alteration project located at 301 VETERANS MEMORIAL PARKWAY (TX-243), Canton, TX 75134 in Canton, Texas. The project has an estimated value of $1.1M covering 38,725 sq ft. ROBERT SHERWOOD AND GREG BAKER REVOCABLE TRUST is the property owner and OXFORD ARCHITECTURE is the design firm of record. The project was registered with TDLR on March 17, 2026.
โFrequently Asked Questions
What is TSC?
TSC is a renovation/alteration project at 301 VETERANS MEMORIAL PARKWAY (TX-243) in Canton, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: RENOVATION OF EXISTING STORE WITH EXPANSION IN ADJACENT TENANT SPACE.
Is TSC open in Canton?
TSC is still under construction in Canton, TX, with an estimated completion of Sep 2026 according to its TDLR registration.
Where is TSC located?
TSC is located at 301 VETERANS MEMORIAL PARKWAY (TX-243), Canton, TX, 75134, in Van Zandt County.
Who is the owner or developer of TSC?
ROBERT SHERWOOD AND GREG BAKER REVOCABLE TRUST is the property owner/developer of record for TSC, per its TDLR project registration.
Who is the architect or design firm for TSC?
OXFORD ARCHITECTURE is the design firm of record for TSC, according to its TDLR filing.
How much does TSC cost and how big is it?
TSC has an estimated construction value of $1.1M and approximately 38,725 square feet (about $28/sqft), based on its TDLR filing.
๐Scope of Work
RENOVATION OF EXISTING STORE WITH EXPANSION IN ADJACENT TENANT SPACE.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Mar 17, 2026
Review Complete
Mar 31, 2026
Inspection Complete
Closed
14d
Review duration