Project intelligenceTDLR TABS2026015207Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Community ISD Edge MS Addition & Renovation in Nevada, TX

620 FM N. 1138, Nevada, TX, 75173

Opening ~Jul 2027Review Complete

Community ISD Edge MS Addition & Renovation is a renovation/alteration project at 620 FM N. 1138, Nevada, in Collin County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Jul 2027. The project has an estimated value of $10.0M across about 68,114 sq ft.

Estimated project value
$10.0M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
68,114 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$147/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 2mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

Explore the linked construction record and source history

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Mar 17, 2026494 days across supplied datesJul 24, 2027

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    63 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    32 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    399 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Community ISD Edge MS Addition & Renovation

Community ISD Leland Edge Middle School in Nevada, Texas, is undergoing a significant expansion and renovation project with an estimated cost of $10,000,000. The work involves constructing a new addition to Building 2 and performing selective renovations on Building 1, which has a total area of 68,114 square feet. The filing describes the scope as including renovations of approximately 729 square feet of the existing structure, alongside the new construction components. Construction began in May 2026 and is scheduled to finish in July 2027.

Project Scope and Design

The project, filed with the Texas Department of Licensing and Regulation (TDLR) as Community ISD Edge MS Addition & Renovation, is led by WRA Architects as the design firm of record. Marcela Abadi Rhoads serves as the registered accessibility specialist for the project. The estimated cost of $10,000,000 translates to approximately $147 per square foot, a figure that is above the county median of $78 per square foot for similar renovation and alteration filings in Collin County.

The scheduled build window of 431 days is longer than the county median of 92 days for comparable projects. This extended timeline reflects the scale of the work, which includes both new construction and detailed interior renovations. The project utilizes public funds and is situated on public land in Collin County. TDLR completed the plan review in June 2026, confirming that the design meets required standards before construction commenced.

Local Context and Ownership

Community ISD owns the property, which is located at 620 FM N. 1138 in Nevada. The district has several other TDLR-registered projects, including renovations at NeSmith Elementary School and McClendon Elementary School, both of which are closed. The design firm, WRA Architects, is also responsible for other school projects in the region, such as The Meadows Elementary School in Desoto and Woodridge Elementary School, which is in the review complete stage.

The surrounding area includes several other educational and community facilities, such as Braves Stadium and the Community ISD Athletic Facility. The ZIP code 75173 has a population of approximately 9,284 residents, with a median household income of $100,373 according to U.S. Census estimates. The median owner-occupied home value in the area is $322,000. This project represents a significant investment in the local educational infrastructure, aiming to modernize facilities and expand capacity for students in the Community ISD district.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75173 (Nevada)

One email per change. Unsubscribe in one click. Privacy.

Community ISD Edge MS Addition & Renovation is a Renovation/Alteration project located at 620 FM N. 1138, Nevada, TX 75173 in Nevada, Texas. The project has an estimated value of $10.0M covering 68,114 sq ft. Community ISD is the property owner and WRA Architects is the design firm of record. The project was registered with TDLR on March 17, 2026.

Frequently Asked Questions

When will the construction be finished?

Construction is scheduled to finish in July 2027, with work having started in May 2026.

Who is the design firm for this project?

WRA Architects is the design firm of record for the Community ISD Leland Edge Middle School project.

Is the school open during construction?

The TDLR record only tracks construction status. It does not provide information regarding the school's daily operations or opening hours.

Where is the project located?

The project is located at 620 FM N. 1138, Nevada, TX 75173, in Collin County.

What is Community ISD Edge MS Addition & Renovation?

Community ISD Edge MS Addition & Renovation is a renovation/alteration project at 620 FM N. 1138 in Nevada, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: This project involves the construction of a new addition to Building 2, and selective renovations of Building 1.Building 1 scope of work consists of renovations of approximately 729 square feet of 68,114 square foot building. Work will i…

Is Community ISD Edge MS Addition & Renovation open in Nevada?

Community ISD Edge MS Addition & Renovation is still under construction in Nevada, TX, with an estimated completion of Jul 2027 according to its TDLR registration.

Where is Community ISD Edge MS Addition & Renovation located?

Community ISD Edge MS Addition & Renovation is located at 620 FM N. 1138, Nevada, TX, 75173, in Collin County.

Who is the owner or developer of Community ISD Edge MS Addition & Renovation?

Community ISD is the property owner/developer of record for Community ISD Edge MS Addition & Renovation, per its TDLR project registration.

Who is the architect or design firm for Community ISD Edge MS Addition & Renovation?

WRA Architects is the design firm of record for Community ISD Edge MS Addition & Renovation, according to its TDLR filing.

How much does Community ISD Edge MS Addition & Renovation cost and how big is it?

Community ISD Edge MS Addition & Renovation has an estimated construction value of $10.0M and approximately 68,114 square feet (about $147/sqft), based on its TDLR filing.

Scope of Work

This project involves the construction of a new addition to Building 2, and selective renovations of Building 1.Building 1 scope of work consists of renovations of approximately 729 square feet of 68,114 square foot building. Work will include selec

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

620 FM N. 1138, Nevada, TX, 75173

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 75173 (Nevada)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.