MRI Room Renovation
MRI Room Renovation is a renovation/alteration project at 7900 FM 1826, Austin, in Hays County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Oct 2026. The project has an estimated value of $1.6M across about 1,834 sq ft.
๐Project Metrics
TDLR #TABS2026015679Review Complete
Design review complete, construction may proceed
MRI Room Renovation is a Renovation/Alteration project located at 7900 FM 1826, Austin, TX 78737 in Austin, Texas. The project has an estimated value of $1.6M covering 1,834 sq ft. Seton Healthcare is the property owner and Polkinghorn Group Architects is the design firm of record. The project was registered with TDLR on March 23, 2026.
โFrequently Asked Questions
What is MRI Room Renovation?
MRI Room Renovation is a renovation/alteration project at 7900 FM 1826 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Existing space modification.
Is MRI Room Renovation open in Austin?
MRI Room Renovation is still under construction in Austin, TX, with an estimated completion of Oct 2026 according to its TDLR registration.
Where is MRI Room Renovation located?
MRI Room Renovation is located at 7900 FM 1826, Austin, TX, 78737, in Hays County.
Who is the owner or developer of MRI Room Renovation?
Seton Healthcare is the property owner/developer of record for MRI Room Renovation, per its TDLR project registration.
Who is the architect or design firm for MRI Room Renovation?
Polkinghorn Group Architects is the design firm of record for MRI Room Renovation, according to its TDLR filing.
How much does MRI Room Renovation cost and how big is it?
MRI Room Renovation has an estimated construction value of $1.6M and approximately 1,834 square feet (about $872/sqft), based on its TDLR filing.
๐Scope of Work
Existing space modification.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Mar 23, 2026
Review Complete
Apr 5, 2026
Inspection Complete
Closed
13d
Review duration
๐Related Projects
๐คSame Owner
$3.1M total๐Related City Permits
Building permits found at or near this location
New In-ground 300 SF Concrete Pool and associated equipment and pad.
New In-ground 300 SF Concrete Pool and associated equipment and pad.
Upgrade existing 100-amp service to 200-amp including new wire in existing meter new 200-amp main breaker in existing disconnect and new exterior panel.
Provide and install automatic transfer switch and electric panel for connecting air cooled chiller #3 to generator backup power at Ascension Seton Southwest Hospital.
New In-ground 300 SF Concrete Pool and associated equipment and pad.