Project has been registered with TDLR and is in pre-construction phase
Border States Tenant Improvement is a Renovation/Alteration project located at 261 Deep Roots Drive Suite 650, Buda, TX 78610 in Buda, Texas. The project has an estimated value of $1.00B covering 3,377 sq ft. Firecracker 6 Industrial Owner LLC is the property owner and Rice Companies, Inc. is the design firm of record. The project was registered with TDLR on March 24, 2026.
THE SCOPE OF WORK INCLUDES THE BUILD-OUT OF APPROXIMATELY 3,377 SQUARE FEET OF OFFICE SPACE. THE PROJECT ALSO INCORPORATES LOADING DOCK IMPROVEMENTS, NEW STORAGE RACKING, AND NEW ELECTRICAL, MECHANICAL, AND ESFR SPRINKLER SYSTEMS THROUGHOUT.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Mar 24, 2026
Review Complete
Inspection Complete
Closed
Building permits found at or near this location
we will replace electrical riser due to a tree limb falling on it and damaged the riser
Construct new driveway approach of 15 FT and 10 FT curb/gutter. No sidewalk inspection per plan review.
New 2-story 4 bedroom 4.5 bathroom dwelling unit with attached garage carport covered front porch rear covered patio and balcony.
Install a 70 amp main breaker. Trench from the house to the garage and install the feeder conduit in the trench with 70 amp rated aluminum conductors. Install nine receptacles inside the garage with three separate circuits. Provide GFCI protection for receptacles. Install an outside receptacle and two garage door opener receptacles one on the ceiling and one on the wall at the end of the shaft. Provide GFCI protection for receptacles. Install six interior lights on one switch two flood lights on one switch and an exterior wall sconce near the main door on one switch for three switches in the same box. Install a 50 amp GFCI protected power receptacle for future EV. Install a 20 amp 240V circuit and disconnect for a mini split A/C.
Total demo of duplex 2453 sqft circa 1970