Project intelligenceTDLR TABS2026015824Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

FAC: KBH Energy Center Suite Relocation in Austin, TX

2304 Whitis Av - Suite 3.345-3.327 Austin TX 78712 none, Austin, TX 78704, Austin, TX, 78712

Construction complete · Oct 2026Inspection Complete

FAC: KBH Energy Center Suite Relocation is a renovation/alteration project at 2304 Whitis Av - Suite 3.345-3.327 Austin TX 78712 none, Austin, TX 78704, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Oct 2026). The project has an estimated value of $1.1M across about 2,014 sq ft.

Estimated project value
$1.1M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
2,014 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$549/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
5 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Mar 25, 2026217 days across supplied datesOct 28, 2026

5 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    7 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    41 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    141 days after the preceding date shown.

    Source: TDLR filing

    View source record
  5. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    28 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About FAC: KBH Energy Center Suite Relocation

The Peter T Flawn (FAC-0605) Building at University of Texas Austin has completed its renovation work. This project involved the interior office space renovation of the KBH Energy Center Suite within the campus. The registered accessibility specialist for this filing was Mark S Robinson. The work was registered with the Texas Department of Licensing and Regulation (TDLR) in March 2026, with plan review completed in April 2026. Construction began in May 2026 and concluded in September 2026, followed by a final TDLR accessibility inspection in October 2026.

Scope and Scale

The renovation covered 2,014 sq ft of interior space. The scope included the built-out of a reception area, a conference room, storage space, a breakroom, two offices, one phone room, and an open area designed for four cubicles. The estimated cost for these improvements was $1,106,537. This results in a cost per square foot of $549. The University of Texas at Austin Construction and Planning Dept. served as the owner and developer of record for this public project.

Market Context

When compared to other renovation and alteration filings in Travis County, this project stands out for its intensity. The median estimated cost for such projects in the county is $300,000, with a middle half range of $140,000 to $715,500. The median size is 3,788 sq ft, and the median cost per square foot is $104. The cost per square foot for the Flawn Building renovation is significantly above the county median of $104. The scheduled build window for this project was 141 days, which is longer than the county median of 98 days. The total cost is also above the county median for its type, placing it in the top quarter of similar filings.

The project involves public funds, public land, or is a Federally funded roadway project. It is situated in the University of Texas at Austin area. Nearby businesses include Hotel Ella, Pluckers Wing Bar, the University Co-op, The Castilian, Starbucks Coffee Company, and Urban Outfitters. Other registered projects in the same area include the Physics, Math, & Astronomy Building (PMA) and The Grove. The area is part of Travis County, where the unemployment rate was 3.9 percent in August 2026. The U.S. Census ACS 2023 five-year estimates for ZIP 78712 indicate a population of about 206. The project is now fully documented with a TDLR status of Inspection Complete.

Inspection Complete

Final inspection completed, awaiting project closure

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78712 (Austin)

One email per change. Unsubscribe in one click. Privacy.

FAC: KBH Energy Center Suite Relocation is a Renovation/Alteration project located at 2304 Whitis Av - Suite 3.345-3.327 Austin TX 78712 none, Austin, TX 78704 in Austin, Texas. The project has an estimated value of $1.1M covering 2,014 sq ft. University of Texas at Austin - Construction and Planning Dept. is the property owner. The project was registered with TDLR on March 25, 2026.

Frequently Asked Questions

Is the KBH Energy Center Suite open for business?

The TDLR record covers construction only and does not record whether the business has started serving customers. The filing confirms the renovation is complete and passed inspection, but business operations are not part of the public accessibility record.

Who was the registered accessibility specialist for this project?

Mark S Robinson was the registered accessibility specialist for the Peter T Flawn (FAC-0605) Building at University of Texas Austin renovation. His role involved overseeing the accessibility compliance for the interior office space renovation filed with TDLR.

What was the total cost of the renovation?

The estimated cost for the renovation of the 2,014 sq ft space was $1,106,537. This figure includes the built-out of offices, conference rooms, and other interior spaces as detailed in the TDLR filing.

When did construction start and finish?

Construction started in May 2026 and the completion date on the filing was September 2026. The final TDLR accessibility inspection was passed in October 2026, marking the end of the regulatory process.

What specific spaces were renovated?

The renovation included a reception area, conference room, storage, breakroom, two offices, one phone room, and an open area for four cubicles. These spaces were built out within the existing 2,014 sq ft footprint.

What is FAC: KBH Energy Center Suite Relocation?

FAC: KBH Energy Center Suite Relocation is a renovation/alteration project at 2304 Whitis Av - Suite 3.345-3.327 Austin TX 78712 none, Austin, TX 78704 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior office space renovation. The built-out of the following spaces: reception +, conference, storage, breakroom, 2 offices, 1 phone room and an open area for 4 cubicles

Is FAC: KBH Energy Center Suite Relocation open in Austin?

Construction on FAC: KBH Energy Center Suite Relocation is complete — TDLR records show the project passed its required accessibility inspection in Oct 2026. The building is finished and very likely open.

Where is FAC: KBH Energy Center Suite Relocation located?

FAC: KBH Energy Center Suite Relocation is located at 2304 Whitis Av - Suite 3.345-3.327 Austin TX 78712 none, Austin, TX 78704, Austin, TX, 78712, in Travis County.

Who is the owner or developer of FAC: KBH Energy Center Suite Relocation?

University of Texas at Austin - Construction and Planning Dept. is the property owner/developer of record for FAC: KBH Energy Center Suite Relocation, per its TDLR project registration.

How much does FAC: KBH Energy Center Suite Relocation cost and how big is it?

FAC: KBH Energy Center Suite Relocation has an estimated construction value of $1.1M and approximately 2,014 square feet (about $549/sqft), based on its TDLR filing.

Scope of Work

Interior office space renovation. The built-out of the following spaces: reception +, conference, storage, breakroom, 2 offices, 1 phone room and an open area for 4 cubicles

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

2304 Whitis Av - Suite 3.345-3.327 Austin TX 78712 none, Austin, TX 78704, Austin, TX, 78712

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Related City Permits

Building permits found at or near this location

2304 E 13TH ST

14 x 15 Pool with Autofill Heater

ActiveElectrical PermitNewSep 2026
View Details
2026-115143 EP
Solid Base Electric, LLC
2304 SPRING CREEK DR

Generac system removal and reinstall for siding. Surge protection installed. No meter work. AE is the electrical provider.

ActiveElectrical PermitRepairSep 2026
View Details
2026-126041 EP
Mister Sparky Austin
2304 SHELBY OAK LN

Replacement of an existing exterior main Federal Pacific panel.

FinalElectrical PermitUpgradeSep 2026
View Details
2026-113620 EP
Power-Up Electrical
2304 E 13TH ST

14 x 15 Pool with Autofill Heater

ActiveBuilding PermitNewSep 2026
View Details
2026-115143 BP
Texas Tiny Pools
2304 SHELBY OAK LN

Express: To install 20 exterior Press piers around the perimeter of the house as shown in the drawing. Structure adjustment: Crown leveling shall be hydraulically jacked to attempt to level and stabilize it; however the unit will be considered level when the structure has been raised as far as the structure will permit.

FinalBuilding PermitRepairAug 2026
$1
View Details
2026-108768 BP
Concrete Leveling Technologies LLC

Watch all construction in 78712 (Austin)