ZARA Stockroom
ZARA Stockroom is a renovation/alteration project at 3409 Esperanza Crossing, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $550K across about 4,193 sq ft.
๐Project Metrics
TDLR #TABS2026015870Review Complete
Design review complete, construction may proceed
ZARA Stockroom is a Renovation/Alteration project located at 3409 Esperanza Crossing, Austin, TX 78758 in Austin, Texas. The project has an estimated value of $550K covering 4,193 sq ft. Simon Property Group Texas LP is the property owner and PermitusNow is the design firm of record. The project was registered with TDLR on March 25, 2026.
โFrequently Asked Questions
What is ZARA Stockroom?
ZARA Stockroom is a renovation/alteration project at 3409 Esperanza Crossing in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Fit-out works for Zara remote stockroom space in the Domain. Approximate 4193 SF,
Is ZARA Stockroom open in Austin?
ZARA Stockroom is currently under construction in Austin, TX. Its current TDLR status is "Review Complete".
Where is ZARA Stockroom located?
ZARA Stockroom is located at 3409 Esperanza Crossing, Austin, TX, 78758, in Travis County.
Who is the owner or developer of ZARA Stockroom?
Simon Property Group Texas LP is the property owner/developer of record for ZARA Stockroom, per its TDLR project registration.
Who is the architect or design firm for ZARA Stockroom?
PermitusNow is the design firm of record for ZARA Stockroom, according to its TDLR filing.
How much does ZARA Stockroom cost and how big is it?
ZARA Stockroom has an estimated construction value of $550K and approximately 4,193 square feet (about $131/sqft), based on its TDLR filing.
๐Scope of Work
Fit-out works for Zara remote stockroom space in the Domain. Approximate 4193 SF,
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Mar 25, 2026
Review Complete
May 14, 2026
Inspection Complete
Closed
50d
Review duration
๐Related Projects
๐Related City Permits
Building permits found at or near this location
Total Demo of SFR 2500 sqft circa 1981
Total Demo of SFR 2500 sqft circa 1981
Inground pool and spa with autofill and gas heater. No deck
Replacement of complete existing central heat and air system with or without duct work Removed the old unit and installed 1 new HVAC system without ductwork
Replacement of an existing water heater we are replacing the electric tank water heater with a newer model