Suite 110 is a renovation/alteration project at 12709 Topperwein Rd., Live Oak, in Bexar County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Oct 2026. The project has an estimated value of $1.1M across about 3,797 sq ft.
๐Project Metrics
TDLR #TABS2026016004Review Complete
Design review complete, construction may proceed
Suite 110 is a Renovation/Alteration project located at 12709 Topperwein Rd., Live Oak, TX 78233 in Live Oak, Texas. The project has an estimated value of $1.1M covering 3,797 sq ft. METHODIST HEALTHCARE SYSTEM OF SAN ANTONIO LTD LLP is the property owner and LK Design Group Inc. is the design firm of record. The project was registered with TDLR on March 26, 2026.
โFrequently Asked Questions
What is Suite 110?
Suite 110 is a renovation/alteration project at 12709 Topperwein Rd. in Live Oak, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior renovation
Is Suite 110 open in Live Oak?
Suite 110 is still under construction in Live Oak, TX, with an estimated completion of Oct 2026 according to its TDLR registration.
Where is Suite 110 located?
Suite 110 is located at 12709 Topperwein Rd., Live Oak, TX, 78233, in Bexar County.
Who is the owner or developer of Suite 110?
METHODIST HEALTHCARE SYSTEM OF SAN ANTONIO LTD LLP is the property owner/developer of record for Suite 110, per its TDLR project registration.
Who is the architect or design firm for Suite 110?
LK Design Group Inc. is the design firm of record for Suite 110, according to its TDLR filing.
How much does Suite 110 cost and how big is it?
Suite 110 has an estimated construction value of $1.1M and approximately 3,797 square feet (about $300/sqft), based on its TDLR filing.
๐Scope of Work
Interior renovation
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Mar 26, 2026
Review Complete
Apr 1, 2026
Inspection Complete
Closed
6d
Review duration