Funding type
This project is privately funded, on private land for private use.
Tesla in Midland, TX
4037 FM 1788, Midland, TX, 79765
Tesla is a new construction project at 4037 FM 1788, Midland, in Midland County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Apr 2027. The project has an estimated value of $200K across about 3,400 sq ft.
- Estimated project value
- $200K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 3,400 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $59/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 1 year
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
7 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
27 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
365 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Tesla
Tesla is constructing a new 3,400-square-foot facility at 4037 FM 1788 in Midland, Texas, specifically for EV charging infrastructure and associated electrical equipment. The project is registered with the Texas Department of Licensing and Regulation (TDLR) under the state's accessibility program, with an estimated cost of $200,000. This new construction site is located in Midland County, where Tesla serves as both the owner and the design firm of record.
According to the TDLR filing, plan review was completed in April 2026, and construction work started in April 2026. The project is scheduled to finish in April 2027, representing a 365-day build window. This timeline is longer than the median scheduled build window of 243 days for new construction projects in Midland County. The estimated cost per square foot is $59, which is below the county median of $167 per square foot for similar filings.
Tesla is not new to Texas construction filings. The company has six other TDLR-registered projects in the state, including locations in San Antonio, Houston, Fort Stockton, Katy, and Laredo. These other projects have a combined estimated value of $1,220,000. All of these other filings are marked as review complete, indicating a consistent pattern of completed regulatory processes for Tesla’s infrastructure expansion across the state.
The site is situated in ZIP code 79765, a region with a population of approximately 24,125 residents. Census estimates for this area indicate a median household income of $100,844 and a median owner-occupied home value of $299,800. The housing stock in this ZIP code is mostly owner-occupied, with about 9,709 housing units. The local labor market in Midland County shows an unemployment rate of 3.4 percent reflecting a stable economic environment for the construction phase.
Third-party sources like Edmunds and Cars.com list used and new Tesla vehicles for sale in the Midland area, highlighting the local market for the brand. However, these listings pertain to vehicle sales rather than the construction of the charging infrastructure itself. The TDLR record confirms that this specific project is privately funded and located on private land for private use, distinct from public utility expansions.
The registered accessibility specialist for this project is Jeffrey A Gutknecht. The filing status is Review Complete, meaning the initial regulatory hurdles for design and scope have been cleared. Construction is actively underway or prepared to proceed according to the April 2026 start date, with the final completion target set for the following April.
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 79765 (Midland)
One email per change. Unsubscribe in one click. Privacy.
Tesla is a New Construction project located at 4037 FM 1788, Midland, TX 79765 in Midland, Texas. The project has an estimated value of $200K covering 3,400 sq ft. Tesla is the property owner and Tesla is the design firm of record. The project was registered with TDLR on March 27, 2026.
Frequently Asked Questions
What is the purpose of the Tesla project in Midland?
The project involves new construction for EV charging infrastructure and associated electrical equipment. It is a 3,400-square-foot facility designed to support electric vehicle charging in the Midland area.
When is the construction scheduled to finish?
The project is scheduled to finish in April 2027. Construction started in April 2026, following the completion of plan review in the same month.
Who is the owner and design firm for this project?
Tesla is listed as both the owner/developer of record and the design firm of record for this new construction project in Midland County.
How does the cost compare to other local projects?
The estimated cost of $200,000 is below the county median of $1,000,000 for new construction. The cost per square foot is $59, which is below the county median of $167.
Is the facility open to the public?
The TDLR record indicates the project is under construction and scheduled to finish in April 2027. It is not open as an operating business.
What is Tesla?
Tesla is a new construction project at 4037 FM 1788 in Midland, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: EV charging infrastructure and associated electrical equipment
Is Tesla open in Midland?
Tesla is still under construction in Midland, TX, with an estimated completion of Apr 2027 according to its TDLR registration.
Where is Tesla located?
Tesla is located at 4037 FM 1788, Midland, TX, 79765, in Midland County.
Who is the owner or developer of Tesla?
Tesla is the property owner/developer of record for Tesla, per its TDLR project registration.
Who is the architect or design firm for Tesla?
Tesla is the design firm of record for Tesla, according to its TDLR filing.
How much does Tesla cost and how big is it?
Tesla has an estimated construction value of $200K and approximately 3,400 square feet (about $59/sqft), based on its TDLR filing.
Scope of Work
EV charging infrastructure and associated electrical equipment
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
4037 FM 1788, Midland, TX, 79765
Related Projects
Same Owner
$1.95B totalNearby Projects
Within 0.6 miWatch all construction in 79765 (Midland)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Midland?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.