Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
Roanoke Hotel & Convention Center
600 S. Oak Street, Roanoke, TX, 76262
Roanoke Hotel & Convention Center is a new construction project at 600 S. Oak Street, Roanoke, in Denton County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion May 2028. The project has an estimated value of $99.7M across about 166,609 sq ft.
- Estimated project value
- $99.7M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 166,609 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $598/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 1y 10mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
93 days after the preceding date shown.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
36 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
634 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Roanoke Hotel & Convention Center
Construction has started on a new 5-story, 205-key hotel and convention center at 600 S. Oak Street in Roanoke, Texas. The project, filed with the Texas Department of Licensing and Regulation (TDLR) as the Roanoke Hotel & Convention Center, is scheduled to finish in May 2028. This new construction effort represents a significant addition to the downtown area, with a total estimated cost of $99,700,000.
The building will cover 166,609 square feet of gross space. This includes 11,377 square feet of dedicated meeting space, a 3-meal restaurant, a lobby bar and lounge, a third-party market, and a ground-level outdoor pool. A 294-car parking garage is also part of the development. The City of Roanoke is the owner of record for this project, which involves public funds and public land.
Design and Construction Details
BOKA Powell, LLC serves as the design firm of record for the project. Gary J Jacobs is the registered accessibility specialist. TDLR completed the plan review in August 2026, following a registration date of March 2026. The filing indicates that construction work began in July 2026. The current status of the TDLR record is Review Complete.
The project's estimated cost per square foot is $598. This figure is above the county median of $121 per square foot for new construction filings in Denton County. The scheduled build window of 670 days is longer than the county median of 220 days for similar projects.
Local Context and Comparisons
The City of Roanoke has six other TDLR-registered projects totaling $30,023,099, including the Roanoke Main Street Parking Garage and Foreston Park. BOKA Powell, LLC has six other registered projects totaling $575,000,000, including developments in Frisco and Dallas. Local businesses near the site include The Classic Cafe at Roanoke and NAPA Auto Parts - Roanoke Auto Supply LTD. Census estimates for ZIP code 76262 indicate a population of about 43,589 and a median household income of $143,093.
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 76262 (Roanoke)
One email per change. Unsubscribe in one click. Privacy.
Roanoke Hotel & Convention Center is a New Construction project located at 600 S. Oak Street, Roanoke, TX 76262 in Roanoke, Texas. The project has an estimated value of $99.7M covering 166,609 sq ft. City of Roanoke is the property owner and BOKA Powell, LLC is the design firm of record. The project was registered with TDLR on March 30, 2026.
Frequently Asked Questions
What is the current construction status of the Roanoke Hotel?
TDLR completed plan review in August 2026, and construction started in July 2026. The project is scheduled to finish in May 2028.
Who is the owner and designer of the project?
The City of Roanoke is the owner of record, and BOKA Powell, LLC is the design firm of record.
What amenities are included in the 166,609 sq ft building?
The hotel includes 205 keys, 11,377 sq ft of meeting space, a restaurant, a lobby bar, a market, an outdoor pool, and a 294-car garage.
How does the cost per square foot compare to the county median?
The project's cost is $598 per square foot, which is above the Denton County median of $121 per square foot for new construction.
What is Roanoke Hotel & Convention Center?
Roanoke Hotel & Convention Center is a new construction project at 600 S. Oak Street in Roanoke, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: 5-Story, 205 Key, 166,609 GSF Hotel with 11,377 SF of Meeting Space, 3-Meal Restaurant, Lobby Bar/Lounge, 3rd Party Market, a Ground Level Outdoor Pool and a 294 Car Parking Garage.
Is Roanoke Hotel & Convention Center open in Roanoke?
Roanoke Hotel & Convention Center is still under construction in Roanoke, TX, with an estimated completion of May 2028 according to its TDLR registration.
Where is Roanoke Hotel & Convention Center located?
Roanoke Hotel & Convention Center is located at 600 S. Oak Street, Roanoke, TX, 76262, in Denton County.
Who is the owner or developer of Roanoke Hotel & Convention Center?
City of Roanoke is the property owner/developer of record for Roanoke Hotel & Convention Center, per its TDLR project registration.
Who is the architect or design firm for Roanoke Hotel & Convention Center?
BOKA Powell, LLC is the design firm of record for Roanoke Hotel & Convention Center, according to its TDLR filing.
How much does Roanoke Hotel & Convention Center cost and how big is it?
Roanoke Hotel & Convention Center has an estimated construction value of $99.7M and approximately 166,609 square feet (about $598/sqft), based on its TDLR filing.
Scope of Work
5-Story, 205 Key, 166,609 GSF Hotel with 11,377 SF of Meeting Space, 3-Meal Restaurant, Lobby Bar/Lounge, 3rd Party Market, a Ground Level Outdoor Pool and a 294 Car Parking Garage.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
600 S. Oak Street, Roanoke, TX, 76262
Related Projects
Same Owner
$211.6M totalSame Design Firm
$235.7M totalWatch all construction in 76262 (Roanoke)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Roanoke?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.