Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
Navasota ISD 2026 Summer Improvements - Phase 3
705 E. Washington Avenue, Navasota, TX, 77868
Navasota ISD 2026 Summer Improvements - Phase 3 is a renovation/alteration project at 705 E. Washington Avenue, Navasota, in Grimes County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Dec 2027. The project has an estimated value of $5.0M across about 398,326 sq ft.
- Estimated project value
- $5.0M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 398,326 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $13/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 1y 7mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
62 days after the preceding date shown.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
19 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
558 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Navasota ISD 2026 Summer Improvements - Phase 3
Navasota Independent School District is undertaking a major renovation and alteration project at its facility located at 705 E. Washington Avenue in Navasota, Texas. The filing identifies this specific phase as "Navasota ISD 2026 Summer Improvements - Phase 3." The scope of work involves renovations to existing facilities, with a total estimated cost of $5,000,000. The project covers an area of 398,326 sq ft, resulting in a computed cost of $13 per square foot.
Project Status and Timeline
The project was registered with TDLR in March 2026. Plan review was completed in June 2026, and construction is scheduled to begin in June 2026. The filing indicates the project is scheduled to finish in December 2027. This creates a scheduled build window of 577 days, which is longer than the 190-day median build window for similar renovation and alteration projects in Grimes County.
GLS is the design firm of record for this project. Melisa R Chapman is the registered accessibility specialist. The project involves public funds, public land, or is a Federally funded roadway project. The TDLR status is listed as Review Complete.
Local Context and Comparisons
Navasota Independent School District has six other TDLR-registered projects totaling $35,900,000. These include the Navasota ISD Brosig Auditorium, Navasota ISD High School, and Navasota ISD Rock Gym, Aux. Gym, Ag Barn. GLS has six other TDLR-registered projects totaling $36,180,100, including work on the Fain Theater in Livingston and the Wills Point Jr. High & High School CTE.
According to U.S. Census ACS 2023 five-year estimates for ZIP 77868, the population is about 18,863. The median household income is $61,949, and the median owner-occupied home value is $200,400. Nearby businesses include St. Joseph Health Grimes Hospital, Navasota Nursing & Rehabilitation, and Seasons Assisted Living. The Grimes County unemployment rate was 5.4 percent in July 2026, higher than a year earlier.
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 77868 (Navasota)
One email per change. Unsubscribe in one click. Privacy.
Navasota ISD 2026 Summer Improvements - Phase 3 is a Renovation/Alteration project located at 705 E. Washington Avenue, Navasota, TX 77868 in Navasota, Texas. The project has an estimated value of $5.0M covering 398,326 sq ft. Navasota Independent School District is the property owner and GLS is the design firm of record. The project was registered with TDLR on March 31, 2026.
Frequently Asked Questions
Is the Navasota ISD renovation project finished?
No. Construction is scheduled to begin in June 2026 and is scheduled to finish in December 2027. The TDLR status is Review Complete, indicating plan review is finished but construction is ongoing or upcoming.
How much does the Navasota ISD project cost?
The estimated cost is $5,000,000. This figure is above the county median for its type, which is $736,513 for renovation and alteration filings in Grimes County.
Who is the design firm for this project?
GLS is the design firm of record. They have six other TDLR-registered projects totaling $36,180,100, including facilities in Livingston, Lufkin, and Wills Point.
Where is the project located?
The project is at 705 E. Washington Avenue, Navasota, TX 77868, in Grimes County.
What is the scope of work?
The scope involves renovations to existing facilities. This is classified as a Renovation/Alteration project with an estimated cost of $5,000,000 and a size of 398,326 sq ft.
What is Navasota ISD 2026 Summer Improvements - Phase 3?
Navasota ISD 2026 Summer Improvements - Phase 3 is a renovation/alteration project at 705 E. Washington Avenue in Navasota, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovations to existing facilities.
Is Navasota ISD 2026 Summer Improvements - Phase 3 open in Navasota?
Navasota ISD 2026 Summer Improvements - Phase 3 is still under construction in Navasota, TX, with an estimated completion of Dec 2027 according to its TDLR registration.
Where is Navasota ISD 2026 Summer Improvements - Phase 3 located?
Navasota ISD 2026 Summer Improvements - Phase 3 is located at 705 E. Washington Avenue, Navasota, TX, 77868, in Grimes County.
Who is the owner or developer of Navasota ISD 2026 Summer Improvements - Phase 3?
Navasota Independent School District is the property owner/developer of record for Navasota ISD 2026 Summer Improvements - Phase 3, per its TDLR project registration.
Who is the architect or design firm for Navasota ISD 2026 Summer Improvements - Phase 3?
GLS is the design firm of record for Navasota ISD 2026 Summer Improvements - Phase 3, according to its TDLR filing.
How much does Navasota ISD 2026 Summer Improvements - Phase 3 cost and how big is it?
Navasota ISD 2026 Summer Improvements - Phase 3 has an estimated construction value of $5.0M and approximately 398,326 square feet (about $13/sqft), based on its TDLR filing.
Scope of Work
Renovations to existing facilities.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
705 E. Washington Avenue, Navasota, TX, 77868
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Same Owner
$65.9M totalWatch all construction in 77868 (Navasota)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Navasota?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.