Funding type
This project is privately funded, on private land for private use.
Addition to Harvest City Church of San Antonio
4906 Stahl Rd, San Antonio, TX, 78217
Addition to Harvest City Church of San Antonio is a additions to existing building project at 4906 Stahl Rd, San Antonio, in Bexar County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Jul 2027. The project has an estimated value of $3.0M across about 6,800 sq ft.
- Estimated project value
- $3.0M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 6,800 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $441/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 1y 1mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
52 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
23 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
395 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Addition to Harvest City Church of San Antonio
Harvest City Church is building a 6,800-square-foot sanctuary addition at 4906 Stahl Rd in San Antonio, an estimated $3,000,000 project that is scheduled to finish in July 2027. The work, filed as "Addition to Harvest City Church of San Antonio," involves constructing a new building addition for a new sanctuary on the existing campus. Construction is set to begin in June 2026, following the completion of plan review in May 2026.
The project is located in the San Antonio International Airport Vicinity within Bexar County. It is privately funded and situated on private land for private use. The registered accessibility specialist for this filing is Shawn Kaarlsen. The project was registered with the Texas Department of Licensing and Regulation in April 2026, and its status is listed as Review Complete.
Design and Cost Context
Powers Goolsby Architects serves as the design firm of record for this sanctuary expansion. The estimated cost of $3,000,000 places the project above the county median for similar additions to existing buildings in Bexar County. Specifically, the cost falls within the top quarter of the 1,048 comparable filings in the county, where the median estimated cost is $475,000. The project’s size of 6,800 square feet also exceeds the median size of 3,900 square feet for this category of work in the area.
The estimated cost per square foot is $441, which is above the county median of $166 per square foot for comparable projects. The scheduled build window for this project is 395 days, a duration longer than the county median of 184 days for similar construction timelines. Powers Goolsby Architects has three other registered projects in the state, including a $2,835,967 project for Home Church in Spring Branch and a $1,350,000 project for Community Bible Church in San Antonio.
The surrounding area near Stahl Road includes local businesses such as JC Auto Salon, Sharon’s Depot, and Mission Landscape Supplies. According to U.S. Census American Community Survey 2023 five-year estimates for ZIP code 78217, the area has a population of about 33,959 and a median household income of $56,852. The median owner-occupied home value in this ZIP code is $216,100, with housing units split evenly between owner- and renter-occupied households.
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 78217 (San Antonio)
One email per change. Unsubscribe in one click. Privacy.
Addition to Harvest City Church of San Antonio is a Additions to Existing Building project located at 4906 Stahl Rd, San Antonio, TX 78217 in San Antonio, Texas. The project has an estimated value of $3.0M covering 6,800 sq ft. Harvest City Church is the property owner and Powers Goolsby Architects is the design firm of record. The project was registered with TDLR on April 1, 2026.
Frequently Asked Questions
When is the Harvest City Church addition scheduled to finish?
Construction is scheduled to finish in July 2027. Work is set to start in June 2026, following plan review completion in May 2026.
How much does the Harvest City Church project cost?
The estimated cost for the 6,800-square-foot sanctuary addition is $3,000,000. This figure is above the median cost for similar projects in Bexar County.
Who is the architect for the Harvest City Church addition?
Powers Goolsby Architects is the design firm of record for this project. They are also registered for other church and commercial projects in Texas.
Is the Harvest City Church addition open to the public?
The TDLR record only tracks construction status. The project is scheduled to finish in July 2027, and no information indicates the addition is open.
What is Addition to Harvest City Church of San Antonio?
Addition to Harvest City Church of San Antonio is a additions to existing building project at 4906 Stahl Rd in San Antonio, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: A new building addition for a new sanctuary on an existing campus.
Is Addition to Harvest City Church of San Antonio open in San Antonio?
Addition to Harvest City Church of San Antonio is still under construction in San Antonio, TX, with an estimated completion of Jul 2027 according to its TDLR registration.
Where is Addition to Harvest City Church of San Antonio located?
Addition to Harvest City Church of San Antonio is located at 4906 Stahl Rd, San Antonio, TX, 78217, in Bexar County.
Who is the owner or developer of Addition to Harvest City Church of San Antonio?
Harvest City Church is the property owner/developer of record for Addition to Harvest City Church of San Antonio, per its TDLR project registration.
Who is the architect or design firm for Addition to Harvest City Church of San Antonio?
Powers Goolsby Architects is the design firm of record for Addition to Harvest City Church of San Antonio, according to its TDLR filing.
How much does Addition to Harvest City Church of San Antonio cost and how big is it?
Addition to Harvest City Church of San Antonio has an estimated construction value of $3.0M and approximately 6,800 square feet (about $441/sqft), based on its TDLR filing.
Scope of Work
A new building addition for a new sanctuary on an existing campus.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
4906 Stahl Rd, San Antonio, TX, 78217
Related Projects
Watch all construction in 78217 (San Antonio)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in San Antonio?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.