Project intelligenceTDLR TABS2026016611Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Phase 2 Traffic Management Center 4th Floor City Tower in Arlington, TX

101 S Mesquite St, Arlington, TX, 76010

Target date passed (Sep 2026)Review Complete

Phase 2 Traffic Management Center 4th Floor City Tower is a renovation/alteration project at 101 S Mesquite St, Arlington, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Sep 2026 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $750K across about 1,689 sq ft.

Estimated project value
$750K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
1,689 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$444/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
3 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

Explore the linked construction record and source history

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Apr 1, 2026153 days across supplied datesSep 1, 2026

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    7 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    54 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    92 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Phase 2 Traffic Management Center 4th Floor City Tower

The City of Arlington is renovating a 1,689-square-foot portion of the fourth floor of the Arlington City Tower at 101 S Mesquite St to create administrative offices for the traffic management center. This specific filing, titled Phase 2 Traffic Management Center 4th Floor City Tower, focuses on the interior alteration of this space to support the operational needs of the Traffic Management Center (TMC), which was issued as Phase 1 of the broader project.

The renovation is estimated to cost $750,000, equating to $444 per square foot. This cost is above the county median for renovation and alteration projects in Tarrant County, placing it in the top quarter of similar filings. The scheduled build window of 92 days is close to the county median of 92 days for comparable work. The project involves public funds and public land, with the City of Arlington Texas listed as the owner of record.

Project Status and Timeline

TDLR completed plan review in April 2026 and construction was scheduled to finish in September 2026; TDLR has not yet recorded a final inspection, so the current state of the site is not confirmed in the public record. The registered accessibility specialist for the project is George A Patterson. The construction start date per the filing is June 2026, and the completion date on the filing is September 2026, a date that has passed. The TDLR status is listed as Review Complete.

The Arlington City Tower is located in Central Arlington, a neighborhood in Tarrant County. The area is home to several local businesses, including Babe's Chicken Dinner House, J. Gilligan's Bar & Grill, and Mission Arlington. According to U.S. Census ACS 2023 five-year estimates for ZIP 76010, the population is about 55,610, with a median household income of $43,811. The housing in this area is mostly renter-occupied, with a median owner-occupied home value of $199,200. The City of Arlington Texas has four other TDLR-registered projects totaling $3,106,629, including the Arlington City Hall and the Ron Wrigth Lake Arlington Branch Library.

A web mention from arlingtontx.granicus.com references a construction contract for renovation work on the 4th floor of Arlington City Tower. Another mention from ccwcalc.com lists the address as 101 S Mesquite St, Arlington, TX, 78061, though the filing lists the ZIP code as 76010. The TDLR record does not provide further details on the specific interior finishes or equipment being installed, only the square footage and cost associated with the administrative office renovation.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 76010 (Arlington)

One email per change. Unsubscribe in one click. Privacy.

Phase 2 Traffic Management Center 4th Floor City Tower is a Renovation/Alteration project located at 101 S Mesquite St, Arlington, TX 76010 in Arlington, Texas. The project has an estimated value of $750K covering 1,689 sq ft. City of Arlington Texas is the property owner. The project was registered with TDLR on April 1, 2026.

Frequently Asked Questions

What is the estimated cost of the Arlington City Tower renovation?

The estimated cost for the 1,689-square-foot renovation is $750,000. This amount is above the county median for similar renovation projects in Tarrant County, placing it in the top quarter of filings by cost.

Who is the owner of the Arlington City Tower project?

The owner of record is the City of Arlington Texas. The project involves public funds and public land, as indicated in the TDLR filing details for this renovation.

What is the current status of the Arlington City Tower renovation?

TDLR has not yet recorded a final inspection. Plan review was completed in April 2026, and construction was scheduled to finish in September 2026, but the current state of the site is not confirmed in the public record.

Where is the Arlington City Tower located?

The project is located at 101 S Mesquite St, Arlington, TX 76010, in the Central Arlington neighborhood of Tarrant County. This address is consistent with the TDLR filing for the Phase 2 Traffic Management Center renovation.

What is the purpose of the fourth-floor renovation?

The renovation creates administrative offices to support the traffic management center (TMC). This work is designated as Phase 2, separate from the Phase 1 TMC issuance, and involves altering a 1,689-square-foot portion of the floor.

What is Phase 2 Traffic Management Center 4th Floor City Tower?

Phase 2 Traffic Management Center 4th Floor City Tower is a renovation/alteration project at 101 S Mesquite St in Arlington, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: This project consists of renovation to a 1,689 square feet portion of the 4th floor of the city tower building to accommodate administrative offices to support the traffic management center (TMC) issued as phase 1 separate from this proj…

Is Phase 2 Traffic Management Center 4th Floor City Tower open in Arlington?

Phase 2 Traffic Management Center 4th Floor City Tower was scheduled to finish construction in Sep 2026 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is Phase 2 Traffic Management Center 4th Floor City Tower located?

Phase 2 Traffic Management Center 4th Floor City Tower is located at 101 S Mesquite St, Arlington, TX, 76010, in Tarrant County.

Who is the owner or developer of Phase 2 Traffic Management Center 4th Floor City Tower?

City of Arlington Texas is the property owner/developer of record for Phase 2 Traffic Management Center 4th Floor City Tower, per its TDLR project registration.

How much does Phase 2 Traffic Management Center 4th Floor City Tower cost and how big is it?

Phase 2 Traffic Management Center 4th Floor City Tower has an estimated construction value of $750K and approximately 1,689 square feet (about $444/sqft), based on its TDLR filing.

Scope of Work

This project consists of renovation to a 1,689 square feet portion of the 4th floor of the city tower building to accommodate administrative offices to support the traffic management center (TMC) issued as phase 1 separate from this project.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

101 S Mesquite St, Arlington, TX, 76010

Location by street address

Watch all construction in 76010 (Arlington)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Arlington?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.