Project intelligenceTDLR TABS2026016724New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Passmore Bridge Replacement

Passmore Road and Alameda Avenue, Socorro, TX, 79927

Opening ~May 2028Project Registered

Passmore Bridge Replacement is a new construction project at Passmore Road and Alameda Avenue, Socorro, in El Paso County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion May 2028. The project has an estimated value of $1.5M across about 18,000 sq ft.

Estimated project value
$1.5M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
18,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$83/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 7mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

Explore the linked construction record and source history

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Apr 2, 2026789 days across supplied datesMay 30, 2028

3 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    212 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    577 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Passmore Bridge Replacement

The Passmore Bridge Replacement project will see the demolition and construction of a new bridge at Passmore Road and Alameda Avenue in Socorro, Texas. This new construction effort is located along the Franklin Canal and includes the addition of pedestrian facilities and traffic signal adjustments. The filing lists a total area of 18,000 square feet with an estimated cost of $1,500,000. The work is registered with the Texas Department of Licensing and Regulation, ensuring compliance with state standards for accessibility and construction.

The project was registered with TDLR in April 2026, and plan review is pending. Construction is scheduled to begin in October 2026, with completion targeted for May 2028. This results in a build window of 577 days, which is longer than the 214-day median for similar new construction filings in El Paso County. The estimated cost of $1,500,000 is above the county median of $800,000 for this project type. However, the cost per square foot of $83 is below the county median of $111, indicating efficient use of space relative to the investment.

Design and Ownership

The City of Socorro is the owner and developer of record for the Passmore Bridge Replacement. CEA Group serves as the design firm of record, bringing experience from other significant projects in the region. The registered accessibility specialist is Eckhard K Fennig. The City of Socorro has six other TDLR-registered projects totaling $3,535,236, including the Vineyard Bridge Replacement and several park improvements. This project is part of a broader strategy to update local infrastructure in Socorro.

CEA Group has a portfolio of six other TDLR-registered projects totaling over $47 million. Their work includes the Railroad Dr. Widening and Reconstruction in El Paso and the John Hayes Street Extension Phase II. The Passmore Bridge Replacement involves public funds and public land, consistent with its status as a federally funded roadway project. This funding supports the use of public resources for critical local infrastructure that serves the community.

Local Context

Socorro is located in El Paso County, a region with a diverse construction market. The project serves the community in ZIP code 79927, which has a population of approximately 43,126. The median household income in this area is $51,735, and the median owner-occupied home value is $125,300, according to U.S. Census estimates. The housing stock is predominantly owner-occupied, reflecting a stable residential base. The Passmore Bridge Replacement aims to improve connectivity and safety for residents and commuters in this part of the county.

The labor market in El Paso County shows an unemployment rate of 4.8 percent which is higher than a year earlier. This economic backdrop influences the demand for skilled construction labor and public works projects. The Passmore Bridge Replacement represents a significant investment in local infrastructure, contributing to the overall development and quality of life in Socorro. The detailed planning and registration with TDLR ensure that the project meets state standards for accessibility and construction quality.

Project Registered

Project has been registered with TDLR and is in pre-construction phase

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 79927 (Socorro)

One email per change. Unsubscribe in one click. Privacy.

Passmore Bridge Replacement is a New Construction project located at Passmore Road and Alameda Avenue, Socorro, TX 79927 in Socorro, Texas. The project has an estimated value of $1.5M covering 18,000 sq ft. City of Socorro is the property owner and CEA Group is the design firm of record. The project was registered with TDLR on April 2, 2026.

Frequently Asked Questions

When is the Passmore Bridge Replacement scheduled for completion?

The project is targeted for May 2028, following a start date of October 2026. This timeline allows for a 577-day construction period, which is longer than the county median for similar projects.

Who is designing the new Passmore Bridge Replacement?

CEA Group is the design firm of record for the project. They are responsible for the engineering and design aspects of the bridge replacement and associated pedestrian facilities.

What is the estimated cost of the Passmore Bridge Replacement?

The estimated cost is $1,500,000. This figure is above the El Paso County median for new construction projects, which is $800,000, but the cost per square foot is below the county median.

Does the Passmore Bridge Replacement include pedestrian facilities?

Yes, the scope of work includes the construction of pedestrian facilities. These are designed to improve safe access for walkers and cyclists along the Franklin Canal corridor.

Is the Passmore Bridge Replacement funded by public sources?

Yes, the project involves public funds and public land. It is categorized as a federally funded roadway project, indicating significant public investment in local infrastructure.

What is Passmore Bridge Replacement?

Passmore Bridge Replacement is a new construction project at Passmore Road and Alameda Avenue in Socorro, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Demolition and construction of Passmore Bridge along the Franklin Canal in Socorro, TX. Construction will include pedestrian facilities and traffic signal adjustments.

Is Passmore Bridge Replacement open in Socorro?

Passmore Bridge Replacement is still under construction in Socorro, TX, with an estimated completion of May 2028 according to its TDLR registration.

Where is Passmore Bridge Replacement located?

Passmore Bridge Replacement is located at Passmore Road and Alameda Avenue, Socorro, TX, 79927, in El Paso County.

Who is the owner or developer of Passmore Bridge Replacement?

City of Socorro is the property owner/developer of record for Passmore Bridge Replacement, per its TDLR project registration.

Who is the architect or design firm for Passmore Bridge Replacement?

CEA Group is the design firm of record for Passmore Bridge Replacement, according to its TDLR filing.

How much does Passmore Bridge Replacement cost and how big is it?

Passmore Bridge Replacement has an estimated construction value of $1.5M and approximately 18,000 square feet (about $83/sqft), based on its TDLR filing.

Scope of Work

Demolition and construction of Passmore Bridge along the Franklin Canal in Socorro, TX. Construction will include pedestrian facilities and traffic signal adjustments.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

Passmore Road and Alameda Avenue, Socorro, TX, 79927

Location by street address

Watch all construction in 79927 (Socorro)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.