SH 45 Plugerville- Wilke Lane Phase 1 Improvements in Pflugerville, TX

4212 N SH 45 E WB SVC Rd, Pflugerville, TX, 78660

Opening ~Aug 2027Review Complete

SH 45 Plugerville- Wilke Lane Phase 1 Improvements is a new construction project at 4212 N SH 45 E WB SVC Rd, Pflugerville, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Aug 2027. The project has an estimated value of $2.4M across about 64,099 sq ft.

Estimated project value
$2.4M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
64,099 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$37/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
29 days
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

Explore the linked construction record and source history

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Apr 9, 2026508 days across supplied datesAug 30, 2027

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    17 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    462 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    29 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About SH 45 Plugerville- Wilke Lane Phase 1 Improvements

SH 45 Plugerville-Wilke Lane Phase 1 Improvements is a new construction project located at 4212 N SH 45 E WB SVC Rd in Pflugerville, Travis County. The scope covers approximately 1,000 linear feet of roadway and associated infrastructure, totaling 64,099 sq ft. The estimated cost for this privately funded development is $2,371,578, resulting in a cost of $37 per square foot.

TDLR completed plan review in April 2026 and construction is scheduled to finish in August 2027, with work starting August 2027. The project is registered with the Texas Department of Licensing and Regulation under the TABS program, with Robert W Green listed as the registered accessibility specialist. The current status is Review Complete.

Project Details and Design

Pape Dawson serves as the design firm of record for this roadway improvement. The owner of record is SH45 LP. This project is privately funded and situated on private land for private use. The filing does not specify a facility name, listing it as N/A. The construction window is notably short, spanning only 29 days from start to finish.

Context and Comparison

In Travis County, the median estimated cost for new construction filings is $1,000,000. This project’s cost of $2,371,578 is above the county median for its type. However, the $37 per square foot cost is below the county median of $125 per square foot. The median size for new construction in the county is 11,995 sq ft, while this project is significantly larger at 64,099 sq ft. The median scheduled build window in Travis County is 304 days, making this project’s 29-day timeline shorter than the county median.

Pape Dawson has six other TDLR-registered projects totaling $11,530,000. These include projects in San Antonio, Anna, Austin, San Marcos, and Georgetown. The Pflugerville area, represented by ZIP code 78660, has a population of about 118,437 according to U.S. Census ACS 2023 five-year estimates. The median household income in this ZIP code is $109,522, and the median owner-occupied home value is $369,300. Housing in the area is mostly owner-occupied. The Travis County unemployment rate was 3.9 percent in July 2026.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78660 (Pflugerville)

One email per change. Unsubscribe in one click. Privacy.

SH 45 Plugerville- Wilke Lane Phase 1 Improvements is a New Construction project located at 4212 N SH 45 E WB SVC Rd, Pflugerville, TX 78660 in Pflugerville, Texas. The project has an estimated value of $2.4M covering 64,099 sq ft. SH45 LP is the property owner and Pape Dawson is the design firm of record. The project was registered with TDLR on April 9, 2026.

Frequently Asked Questions

When will construction start and finish?

Construction is scheduled to start in August 2027 and is scheduled to finish in August 2027. The entire build window is 29 days.

What is the estimated cost?

The estimated cost is $2,371,578, which works out to $37 per square foot.

What is the scope of work?

The scope includes approximately 1,000 linear feet of roadway and associated infrastructure, totaling 64,099 sq ft.

What is SH 45 Plugerville- Wilke Lane Phase 1 Improvements?

SH 45 Plugerville- Wilke Lane Phase 1 Improvements is a new construction project at 4212 N SH 45 E WB SVC Rd in Pflugerville, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Approximately 1,000 linear feet of roadway and associated infrastructure (64,099 sf)

Is SH 45 Plugerville- Wilke Lane Phase 1 Improvements open in Pflugerville?

SH 45 Plugerville- Wilke Lane Phase 1 Improvements is still under construction in Pflugerville, TX, with an estimated completion of Aug 2027 according to its TDLR registration.

Where is SH 45 Plugerville- Wilke Lane Phase 1 Improvements located?

SH 45 Plugerville- Wilke Lane Phase 1 Improvements is located at 4212 N SH 45 E WB SVC Rd, Pflugerville, TX, 78660, in Travis County.

Who is the owner or developer of SH 45 Plugerville- Wilke Lane Phase 1 Improvements?

SH45 LP is the property owner/developer of record for SH 45 Plugerville- Wilke Lane Phase 1 Improvements, per its TDLR project registration.

Who is the architect or design firm for SH 45 Plugerville- Wilke Lane Phase 1 Improvements?

Pape Dawson is the design firm of record for SH 45 Plugerville- Wilke Lane Phase 1 Improvements, according to its TDLR filing.

How much does SH 45 Plugerville- Wilke Lane Phase 1 Improvements cost and how big is it?

SH 45 Plugerville- Wilke Lane Phase 1 Improvements has an estimated construction value of $2.4M and approximately 64,099 square feet (about $37/sqft), based on its TDLR filing.

Scope of Work

Approximately 1,000 linear feet of roadway and associated infrastructure (64,099 sf)

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

4212 N SH 45 E WB SVC Rd, Pflugerville, TX, 78660

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Related City Permits

Building permits found at or near this location

4212 LOSTRIDGE DR

Replace drain lines under slab

ActivePlumbing PermitRepairAug 2026
View Details
2026-108563 PP
David Graves Plumbing
4212 ROSEDALE AVE

Run 60 Amp circuit for EV wall connector in garage.

FinalElectrical PermitSpecial Inspections ProgramAug 2026
View Details
2026-101260 EP
Bedwell Electric LLC
4212 BELLVUE AVE

Replacement of complete existing central heat and air system with or without duct work Replacement of HVAC system. Per MC the change out is happening in the guest house behind the main home. (7/15/26) 9/25/26 SM - Guest upstairs unit

FinalMechanical PermitChange OutJul 2026
View Details
2026-088766 MP
Radiant Plumbing and Air Conditioning
4212 SPEEDWAY BLDG B

Replacement of complete existing central heat and air system with or without duct work

FinalMechanical PermitChange OutJul 2026
View Details
2026-072853 MP
The Coolest LLC
4212 AVENUE H

Replacement of complete existing central heat and air system with or without duct work

FinalMechanical PermitChange OutApr 2026
View Details
2026-049221 MP
McCullough Heating & Air

Watch all construction in 78660 (Pflugerville)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Pflugerville?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.