Opening ~Dec 2026Review Complete

Tim Horton is a new construction project at 9419 E Parmer Lane, Manor, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Dec 2026. The project has an estimated value of $1.6M across about 1,400 sq ft.

Estimated project value
$1.6M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
1,400 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$1.13K/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
6 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Apr 13, 2026262 days across supplied datesDec 31, 2026

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    30 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    49 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    183 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Tim Horton

Brar Properties LLC is building a new 1,400-square-foot Tim Hortons coffee shop at 9419 E Parmer Lane in Manor, Travis County. The TDLR-registered accessibility filing identifies the project as "Tim Horton Manor" and lists the estimated cost at $1,580,000. This new construction includes the building, an attached exterior cooler and freezer, associated parking, sidewalks, and utilities.

Ms consultants, inc serves as the design firm of record, while Robert Ronson is the registered accessibility specialist. The project is privately funded on private land for private use. TDLR completed plan review in May 2026 and construction is scheduled to finish in December 2026, with work starting July 2026.

Project Scope and Cost

The filing describes the construction of the coffee shop and its site improvements. The estimated cost of $1,580,000 works out to $1,129 per square foot. In comparison to 6,770 other new construction filings in Travis County, this cost is above the county median of $1,000,000. The scheduled build window of 183 days is shorter than the county median of 304 days.

Local Context and Design Firm

Ms consultants, inc has six other TDLR-registered projects totaling $5,396,000, including a Tim Hortons in Austin and several Walmart locations. The Manor project is part of a broader portfolio of commercial construction. Local coverage from WhatNow noted the filing calls for the 1,400-square-foot store with work expected to run from July 1 to December 31. A Facebook post by manorcommunitycircle reported that Tim Hortons entered lease negotiations with the development.

The U.S. Census Bureau estimates the population of ZIP code 78653 at about 35,417, with a median household income of $92,799. The area has 12,498 housing units and a median owner-occupied home value of $328,400. Travis County had an unemployment rate of 3.9 percent in July 2026.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78653 (Manor)

One email per change. Unsubscribe in one click. Privacy.

Tim Horton is a New Construction project located at 9419 E Parmer Lane, Manor, TX 78653 in Manor, Texas. The project has an estimated value of $1.6M covering 1,400 sq ft. Brar Properties LLC is the property owner and ms consultants, inc is the design firm of record. The project was registered with TDLR on April 13, 2026.

Frequently Asked Questions

Is the Tim Hortons in Manor open?

The TDLR record shows construction is scheduled to finish in December 2026. A Facebook post by manorcommunitycircle reported that Tim Hortons entered lease negotiations, but the record does not confirm an opening date.

Who is building the new Tim Hortons in Manor?

Brar Properties LLC is the owner of record. ms consultants, inc is the design firm, and Robert Ronson is the registered accessibility specialist for the project.

How much does the new Tim Hortons cost?

The estimated cost is $1,580,000. This figure is above the county median for new construction filings in Travis County.

When does construction start and end?

Work starts in July 2026 and is scheduled to finish in December 2026. TDLR completed plan review in May 2026.

What is included in the scope of work?

The scope includes the new 1,400-square-foot coffee shop, an attached exterior cooler/freezer, parking, sidewalks, and utilities.

What is Tim Horton?

Tim Horton is a new construction project at 9419 E Parmer Lane in Manor, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Construction of new, approximate 1,400 sf, Tim Hortons coffee shop with attached exterior cooler/freezer, associated parking, sidewalks & utilities.

Is Tim Horton open in Manor?

Tim Horton is still under construction in Manor, TX, with an estimated completion of Dec 2026 according to its TDLR registration.

Where is Tim Horton located?

Tim Horton is located at 9419 E Parmer Lane, Manor, TX, 78653, in Travis County.

Who is the owner or developer of Tim Horton?

Brar Properties LLC is the property owner/developer of record for Tim Horton, per its TDLR project registration.

Who is the architect or design firm for Tim Horton?

ms consultants, inc is the design firm of record for Tim Horton, according to its TDLR filing.

How much does Tim Horton cost and how big is it?

Tim Horton has an estimated construction value of $1.6M and approximately 1,400 square feet (about $1.13K/sqft), based on its TDLR filing.

Scope of Work

Construction of new, approximate 1,400 sf, Tim Hortons coffee shop with attached exterior cooler/freezer, associated parking, sidewalks & utilities.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

9419 E Parmer Lane, Manor, TX, 78653

Location by street address

Related City Permits

Building permits found at or near this location

9419 WESTMINSTER GLEN AVE

Installation on New Generac generator and service rated automatic. Austin Energy dsiconnect will be needed ( Jack Tips)

FinalElectrical PermitRepairMay 2026
View Details
2026-063197 EP
Generator Supercenter
9419 SHADY OAKS DR

Upgrading an electrical main service. old fire hazard no main breaker / main wires from meter can not protected

FinalElectrical PermitUpgradeNov 2025
View Details
2025-140139 EP
Palomino Electric
9419 SINGING QUAIL DR

Upgrade electrical system. The current one is a Federal Pacific panel with no main disconnect shutoff.

FinalElectrical PermitUpgradeSep 2025
View Details
2025-116422 EP
ABC Home & Commercial Services
9419 BING CHERRY LN

Install EVSE

FinalElectrical PermitSpecial Inspections ProgramJun 2025
View Details
2025-064227 EP
Grayzer Electric LLC
9419 BRAEBURN GLEN ST

2023 Winter Weather Event Emergency (storm mara) riser repair

FinalElectrical PermitRepairFeb 2023
View Details
2023-015612 EP

Watch all construction in 78653 (Manor)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.