Project intelligenceTDLR TABS2026017474New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Rio Bravo Sidewalk Improvements

Pena Dr., Orquidia Ln., Limon St., Rio Bravo, TX, 78040

Opening ~Mar 2027Review Complete

Rio Bravo Sidewalk Improvements is a new construction project at Pena Dr., Orquidia Ln., Limon St., Rio Bravo, in Webb County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Mar 2027. The project has an estimated value of $960K across about 18,000 sq ft.

Estimated project value
$960K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
18,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$53/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
5 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

Explore the linked construction record and source history

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Apr 13, 2026322 days across supplied datesMar 1, 2027

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    39 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    132 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    151 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Rio Bravo Sidewalk Improvements

Rio Bravo Sidewalk Improvements is a new construction project adding approximately 4,526 linear feet of pedestrian path along Pena Dr., Orquidia Ln., and Limon St. in Rio Bravo, Texas. The work covers a site area of 18,000 sq ft and is registered under the facility name Pena Dr., Orquidia Ln., Limon St. The project is scheduled to finish in March 2027, with construction starting in October 2026.

Webb County serves as the owner of record for this infrastructure improvement. The design firm of record is Webb County Engineering, which prepared the plans for the new sidewalks. Blair Baker is the registered accessibility specialist associated with the filing. The estimated cost for the project is $960,000, which works out to $53 per square foot. This cost is below the county median of $95 per square foot for similar new construction filings in Webb County.

Timeline and Status

The Texas Department of Licensing and Regulation (TDLR) completed plan review in May 2026. The TDLR status is Review Complete. Construction is scheduled to begin in October 2026 and is scheduled to finish in March 2027. This creates a scheduled build window of 151 days, which is shorter than the county median of 239 days for comparable projects. The project involves public funds and public land, or is a Federally funded roadway project.

Webb County has six other TDLR-registered projects totaling $12,195,356, including the Roots Recovery Center and Webb County Fairgrounds improvements in Laredo. The Rio Bravo Sidewalk Improvements project is one of several active accessibility filings in the region. A third-party source, storymaps.arcgis.com, described a related 2023 Transportation Alternatives Program award for Rio Bravo Sidewalk Improvements, noting the construction of new sidewalks. The specific TDLR filing for this project lists the scope as approximately 4,526 linear feet within the City of Rio Bravo.

The project is located in Webb County, where the unemployment rate was 4.8 percent in July 2026. The area profile for ZIP code 78040 indicates a population of about 36,115 and a median household income of $35,742. These Census estimates provide context for the community where the new pedestrian paths will be installed. The project aims to improve accessibility and safety for residents and visitors in Rio Bravo.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78040 (Rio Bravo)

One email per change. Unsubscribe in one click. Privacy.

Rio Bravo Sidewalk Improvements is a New Construction project located at Pena Dr., Orquidia Ln., Limon St., Rio Bravo, TX 78040 in Rio Bravo, Texas. The project has an estimated value of $960K covering 18,000 sq ft. Webb County is the property owner and Webb County Engineering is the design firm of record. The project was registered with TDLR on April 13, 2026.

Frequently Asked Questions

When will the Rio Bravo Sidewalk Improvements be finished?

Construction is scheduled to start in October 2026 and is scheduled to finish in March 2027. The TDLR plan review was completed in May 2026.

Who is building the new sidewalks in Rio Bravo?

Webb County is the owner of record. Webb County Engineering is the design firm, and Blair Baker is the registered accessibility specialist.

How much does the Rio Bravo Sidewalk Improvements project cost?

The estimated cost is $960,000. This equates to $53 per square foot, which is below the Webb County median for similar new construction projects.

What is the scope of the Rio Bravo Sidewalk Improvements?

The project includes approximately 4,526 linear feet of new pedestrian path sidewalk along Pena Dr., Orquidia Ln., and Limon St. The site area is 18,000 sq ft.

Is the Rio Bravo Sidewalk Improvements project open to the public?

The project is under construction and not yet open. It is scheduled to finish in March 2027. The TDLR status is Review Complete.

What is Rio Bravo Sidewalk Improvements?

Rio Bravo Sidewalk Improvements is a new construction project at Pena Dr., Orquidia Ln., Limon St. in Rio Bravo, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: approximately 4526 linear feet of pedestrian path sidewalk within The City of Rio Bravo along Pena Dr., Orquidia Ln., and Limon Dr.

Is Rio Bravo Sidewalk Improvements open in Rio Bravo?

Rio Bravo Sidewalk Improvements is still under construction in Rio Bravo, TX, with an estimated completion of Mar 2027 according to its TDLR registration.

Where is Rio Bravo Sidewalk Improvements located?

Rio Bravo Sidewalk Improvements is located at Pena Dr., Orquidia Ln., Limon St., Rio Bravo, TX, 78040, in Webb County.

Who is the owner or developer of Rio Bravo Sidewalk Improvements?

Webb County is the property owner/developer of record for Rio Bravo Sidewalk Improvements, per its TDLR project registration.

Who is the architect or design firm for Rio Bravo Sidewalk Improvements?

Webb County Engineering is the design firm of record for Rio Bravo Sidewalk Improvements, according to its TDLR filing.

How much does Rio Bravo Sidewalk Improvements cost and how big is it?

Rio Bravo Sidewalk Improvements has an estimated construction value of $960K and approximately 18,000 square feet (about $53/sqft), based on its TDLR filing.

Scope of Work

approximately 4526 linear feet of pedestrian path sidewalk within The City of Rio Bravo along Pena Dr., Orquidia Ln., and Limon Dr.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

Pena Dr., Orquidia Ln., Limon St., Rio Bravo, TX, 78040

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 78040 (Rio Bravo)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Rio Bravo?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.