Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
City Of Port Aransas TPWD Recreational Trails
710 W Ave A, Port Aransas, TX, 78373
City Of Port Aransas TPWD Recreational Trails is a new construction project at 710 W Ave A, Port Aransas, in Nueces County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Oct 2026 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $400K across about 27,707 sq ft.
- Estimated project value
- $400K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 27,707 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $14/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 3 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
4 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
74 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
92 days after the preceding date shown.
Source: TDLR filing
View source record
📰About City Of Port Aransas TPWD Recreational Trails
The City of Port Aransas is undertaking a significant sidewalk replacement project at Charlie's Pasture Nature Preserve, located at 710 W Ave A in Port Aransas. This new construction effort involves the removal of 6,400 square feet of existing concrete sidewalk and its replacement with 9,320 square feet of new pavement. Additionally, the scope includes the construction of 5,987 square feet of entirely new sidewalk and isolated repairs to existing paths, with a maximum repair area of 6,000 square feet. The total project size is 27,707 square feet.
The estimated cost for this infrastructure work is $400,000, which translates to $14 per square foot. This figure is below the Nueces County median of $118 per square foot for similar new construction filings. The project is funded through public funds and involves public land. TDLR completed the plan review in April 2026, and the construction is scheduled to finish in October 2026, with work starting in July 2026. The scheduled build window of 92 days is shorter than the county median of 241 days.
Carlos Armando Martinez is the registered accessibility specialist associated with this filing. The City of Port Aransas has six other TDLR-registered projects totaling $40,800,000, including the Port Aransas Marina and the Lifeguard Headquarters, both of which have completed review. This project is distinct from the previously closed City of Port Aransas - Charlies Pasture Nature Preserve project, which had an estimated cost of $800,000. The current filing is registered with TDLR under the name City Of Port Aransas TPWD Recreational Trails.
The location is in ZIP code 78373, where the U.S. Census American Community Survey 2023 five-year estimates indicate a population of about 3,314. The median household income in this area is $90,000, and the median owner-occupied home value is $518,500. Housing in this ZIP code is predominantly owner-occupied, with 5,614 housing units. The Nueces County unemployment rate was 4.9 percent in July 2026, higher than a year earlier.
This project is part of a broader effort by the City of Port Aransas to maintain and improve public recreational facilities. The sidewalk improvements at Charlie's Pasture Nature Preserve will enhance accessibility and safety for visitors. The project status is Review Complete, indicating that the planning phase is finished and construction is imminent.
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 78373 (Port Aransas)
One email per change. Unsubscribe in one click. Privacy.
City Of Port Aransas TPWD Recreational Trails is a New Construction project located at 710 W Ave A, Port Aransas, TX 78373 in Port Aransas, Texas. The project has an estimated value of $400K covering 27,707 sq ft. City of Port Aransas is the property owner. The project was registered with TDLR on April 14, 2026.
Frequently Asked Questions
Where is the project located?
The project is located at 710 W Ave A, Port Aransas, TX 78373, within Nueces County.
What is the estimated cost?
The estimated cost for this sidewalk replacement and construction project is $400,000.
When is construction scheduled to finish?
Construction is scheduled to finish in October 2026, with work starting in July 2026.
Who is the owner of record?
The owner of record for this project is the City of Port Aransas.
What is the scope of work?
The scope includes removing 6,400 sq ft of old sidewalk, replacing it with 9,320 sq ft of new sidewalk, constructing 5,987 sq ft of new sidewalk, and repairing up to 6,000 sq ft of existing sidewalk.
What is City Of Port Aransas TPWD Recreational Trails?
City Of Port Aransas TPWD Recreational Trails is a new construction project at 710 W Ave A in Port Aransas, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Removal of an existing concrete sidewalk (6400 SF) and replacement with new concrete sidewalk (9320 SF). Construction of a new concrete sidewalk (5987 SF). Isolated repairs of existing concrete sidewalk, amount not to exceed 6000 SF.
Is City Of Port Aransas TPWD Recreational Trails open in Port Aransas?
City Of Port Aransas TPWD Recreational Trails was scheduled to finish construction in Oct 2026 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.
Where is City Of Port Aransas TPWD Recreational Trails located?
City Of Port Aransas TPWD Recreational Trails is located at 710 W Ave A, Port Aransas, TX, 78373, in Nueces County.
Who is the owner or developer of City Of Port Aransas TPWD Recreational Trails?
City of Port Aransas is the property owner/developer of record for City Of Port Aransas TPWD Recreational Trails, per its TDLR project registration.
How much does City Of Port Aransas TPWD Recreational Trails cost and how big is it?
City Of Port Aransas TPWD Recreational Trails has an estimated construction value of $400K and approximately 27,707 square feet (about $14/sqft), based on its TDLR filing.
Scope of Work
Removal of an existing concrete sidewalk (6400 SF) and replacement with new concrete sidewalk (9320 SF). Construction of a new concrete sidewalk (5987 SF). Isolated repairs of existing concrete sidewalk, amount not to exceed 6000 SF.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
710 W Ave A, Port Aransas, TX, 78373
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Watch all construction in 78373 (Port Aransas)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Port Aransas?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.