North Tarrant Express - Segment 2 - Hurstview Change Order

Airport Fwy., Hurst, TX, 76054

Construction complete · Jun 2026Inspection Complete

North Tarrant Express - Segment 2 - Hurstview Change Order is a renovation/alteration project at Airport Fwy., Hurst, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jun 2026). The project has an estimated value of $32.5M across about 1 sq ft.

Estimated project value
$32.5M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
1 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$32500.00K/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
3y 2mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Aug 11, 20251,153 days across supplied datesOct 7, 2028

5 timeline dates shown.

  1. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Source: TDLR filing

    View source record
  2. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    247 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    36 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    30 days after the preceding date shown.

    Source: TDLR filing

    View source record
  5. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    840 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About North Tarrant Express - Segment 2 - Hurstview Change Order

The North Tarrant Express Segment 2 project in Hurst has completed its construction phase, confirmed by the final TDLR accessibility inspection passed in June 2026. This renovation and alteration work focused on the existing pedestrian bridge along Airport Fwy. in Hurst, TX 76054, specifically addressing structural modifications required for nearby roadway expansion.

According to the TDLR filing, the core scope involved relocating a column on the existing pedestrian bridge to facilitate roadway widening. This structural change necessitated the dismantling and reconstruction of two spans of the bridge. To maintain pedestrian access during the construction period, a short run of sidewalk was installed to serve as a detour route.

Project Scale and Financials

With an estimated cost of $32,500,000, this project sits in the top quarter of costs for renovation and alteration filings in Tarrant County. The median estimated cost for similar projects in the county is $250,000. The scheduled build window for this project was 1,153 days, which is longer than the county median of 92 days for comparable work. The owner of record is the Texas Department of Transportation, with North Tarrant Infrastructure, LLC listed as the design firm.

The project is Federally funded, involving public funds and public land. It was registered with TDLR in April 2026, with plan review completed in May 2026. Construction began in August 2025, and the record shows the final inspection passed in June 2026, marking the end of the construction timeline. The registered accessibility specialist for the project is Jesus E Lardizabal.

TxDOT has six other TDLR-registered projects totaling $68,131,714, including facilities in Georgetown and Centerville. This Hurst project is part of a broader infrastructure effort in the region. The area surrounding the project, ZIP code 76054, has a population of about 11,840 and a median household income of $108,907, according to U.S. Census estimates. The housing stock is predominantly owner-occupied, with a median home value of $356,000.

Inspection Complete

Final inspection completed, awaiting project closure

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 76054 (Hurst)

One email per change. Unsubscribe in one click. Privacy.

North Tarrant Express - Segment 2 - Hurstview Change Order is a Renovation/Alteration project located at Airport Fwy., Hurst, TX 76054 in Hurst, Texas. The project has an estimated value of $32.5M covering 1 sq ft. Texas Department of Transportation is the property owner and North Tarrant Infrastructure, LLC is the design firm of record. The project was registered with TDLR on April 15, 2026.

Frequently Asked Questions

Is the North Tarrant Express Segment 2 project complete?

Yes, the project passed its final TDLR accessibility inspection in June 2026, indicating that the construction phase is finished.

What work was performed on the pedestrian bridge?

A column was relocated to facilitate roadway widening, which required dismantling and reconstructing two spans of the bridge.

Who is the owner of this project?

The Texas Department of Transportation is the owner of record for this renovation and alteration project.

Where is the project located?

The project is located along Airport Fwy. in Hurst, TX 76054, in Tarrant County.

What is North Tarrant Express - Segment 2 - Hurstview Change Order?

North Tarrant Express - Segment 2 - Hurstview Change Order is a renovation/alteration project at Airport Fwy. in Hurst, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: A column on the existing ped bridge needs relocation to facilitate roadway widening. Requires dismantling & reconstructing 2 spans of the bridge. Additionally, a short run of sidewalk is proposed to serve as a detour route.

Is North Tarrant Express - Segment 2 - Hurstview Change Order open in Hurst?

Construction on North Tarrant Express - Segment 2 - Hurstview Change Order is complete — TDLR records show the project passed its required accessibility inspection in Jun 2026. The building is finished and very likely open.

Where is North Tarrant Express - Segment 2 - Hurstview Change Order located?

North Tarrant Express - Segment 2 - Hurstview Change Order is located at Airport Fwy., Hurst, TX, 76054, in Tarrant County.

Who is the owner or developer of North Tarrant Express - Segment 2 - Hurstview Change Order?

Texas Department of Transportation is the property owner/developer of record for North Tarrant Express - Segment 2 - Hurstview Change Order, per its TDLR project registration.

Who is the architect or design firm for North Tarrant Express - Segment 2 - Hurstview Change Order?

North Tarrant Infrastructure, LLC is the design firm of record for North Tarrant Express - Segment 2 - Hurstview Change Order, according to its TDLR filing.

How much does North Tarrant Express - Segment 2 - Hurstview Change Order cost and how big is it?

North Tarrant Express - Segment 2 - Hurstview Change Order has an estimated construction value of $32.5M and approximately 1 square feet (about $32500.00K/sqft), based on its TDLR filing.

Scope of Work

A column on the existing ped bridge needs relocation to facilitate roadway widening. Requires dismantling & reconstructing 2 spans of the bridge. Additionally, a short run of sidewalk is proposed to serve as a detour route.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Watch all construction in 76054 (Hurst)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Get alerts for Tarrant

Daily email when new projects start nearby.

Start Alerts - $19/mo

Download project data

Get curated lists of projects with full contact info.

Browse Data Lists