Project intelligenceTDLR TABS2026018137Renovation/Alteration
Funding type

This project is privately funded, on private land for private use.

District 1 Coffee Shop

3500 E Parmer Lane Unit 1164, Austin, TX, 78754

Target date passed (Jul 2026)Review Complete

District 1 Coffee Shop is a renovation/alteration project at 3500 E Parmer Lane Unit 1164, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Jul 2026 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $150K across about 1,349 sq ft.

Estimated project value
$150K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
1,349 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$111/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
2 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Apr 20, 2026109 days across supplied datesAug 7, 2026

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    30 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    72 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    7 days after the preceding date shown.

    Source: TDLR filing

    View source record

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78754 (Austin)

One email per change. Unsubscribe in one click. Privacy.

District 1 Coffee Shop is a Renovation/Alteration project located at 3500 E Parmer Lane Unit 1164, Austin, TX 78754 in Austin, Texas. The project has an estimated value of $150K covering 1,349 sq ft. Janis ATX is the property owner and Urban Building Services of Texas LLC is the design firm of record. The project was registered with TDLR on April 20, 2026.

Frequently Asked Questions

What is District 1 Coffee Shop?

District 1 Coffee Shop is a renovation/alteration project at 3500 E Parmer Lane Unit 1164 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Tennant Improvement for new coffee shop.

Is District 1 Coffee Shop open in Austin?

District 1 Coffee Shop was scheduled to finish construction in Jul 2026 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is District 1 Coffee Shop located?

District 1 Coffee Shop is located at 3500 E Parmer Lane Unit 1164, Austin, TX, 78754, in Travis County.

Who is the owner or developer of District 1 Coffee Shop?

Janis ATX is the property owner/developer of record for District 1 Coffee Shop, per its TDLR project registration.

Who is the architect or design firm for District 1 Coffee Shop?

Urban Building Services of Texas LLC is the design firm of record for District 1 Coffee Shop, according to its TDLR filing.

How much does District 1 Coffee Shop cost and how big is it?

District 1 Coffee Shop has an estimated construction value of $150K and approximately 1,349 square feet (about $111/sqft), based on its TDLR filing.

Scope of Work

Tennant Improvement for new coffee shop.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

3500 E Parmer Lane Unit 1164, Austin, TX, 78754

Location by street address

Related Projects

Same Design Firm

$350K total

Related City Permits

Building permits found at or near this location

3500 S SH 130 SVRD SB BLDG 1

Provide all labor and materials for the installation of an irrigation system to be installed on meters providing reclaimed water. All components provided (heads valve boxes PVC Pipe and Drip) to be purple in color denoting reclaimed water. REF: 2026-018608 W

ActivePlumbing PermitIrrigationSep 2026
View Details
2026-119064 PP
3500 S SH 130 SVRD SB BLDG 3

New Construction Office Warehouse Building 3

ActiveBuilding PermitShellSep 2026
$1
View Details
2024-163868 BP
Raymond Construction Co., Inc
3500 E PARMER LN UNIT 3210

Interior finish out for a sports bar and grill. 3000 sqft.

ActiveMechanical PermitRemodelSep 2026
View Details
2026-101561 MP
ZuzmaCooling & Heating LLC
3500 S SH 130 SVRD SB BLDG 4

New Construction Office Warehouse Building 4

ActiveBuilding PermitShellSep 2026
$1
View Details
2024-163869 BP
Raymond Construction Co., Inc
3500 S SH 130 SVRD SB BLDG 2

Installation of 540kW AC Roof Mounted Auxiliary Power System The service is for BLDG 2 UNIT DG

FinalElectrical PermitAuxiliary PowerAug 2026
View Details
2025-156375 EP
Spear C&I, LLC

Watch all construction in 78754 (Austin)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.