Design review complete, construction may proceed
Hillcrest Cancer Center Linear Accelerator Replacement is a Renovation/Alteration project located at 150 Hillcrest Medical Blvd, Waco, TX 76712 in Waco, Texas. The project has an estimated value of $3.2M covering 4,400 sq ft. Hillcrest Baptist Medical Center is the property owner and Guide Architecture is the design firm of record. The project was registered with TDLR on April 21, 2026.
Hillcrest Cancer Center Linear Accelerator Replacement is a renovation/alteration project at 150 Hillcrest Medical Blvd, Waco, TX 76712 in Waco, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: 4,400 SF renovation to replace an existing LINAC & add an additional LINAC, create a new blood draw lab, two new exam rooms, and renovate the check-out area
Hillcrest Cancer Center Linear Accelerator Replacement is still under construction in Waco, TX, with an estimated completion of Aug 2027 according to its TDLR registration.
Hillcrest Cancer Center Linear Accelerator Replacement is located at 150 Hillcrest Medical Blvd, Waco, TX 76712, Waco, TX, 76712, in McLennan County.
Hillcrest Baptist Medical Center is the property owner/developer of record for Hillcrest Cancer Center Linear Accelerator Replacement, per its TDLR project registration.
Guide Architecture is the design firm of record for Hillcrest Cancer Center Linear Accelerator Replacement, according to its TDLR filing.
Hillcrest Cancer Center Linear Accelerator Replacement has an estimated construction value of $3.2M and approximately 4,400 square feet (about $727/sqft), based on its TDLR filing.
4,400 SF renovation to replace an existing LINAC & add an additional LINAC, create a new blood draw lab, two new exam rooms, and renovate the check-out area
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Apr 21, 2026
Review Complete
Apr 21, 2026
Inspection Complete
Closed