Project intelligenceTDLR TABS2026018262Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Reese Education Center Renovation in Lubbock, TX

9421 4th Street, Lubbock, TX, 79413

Opening ~Dec 2026Project Registered

Reese Education Center Renovation is a renovation/alteration project at 9421 4th Street, Lubbock, in Lubbock County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Dec 2026. The project has an estimated value of $470K across about 3,400 sq ft.

Estimated project value
$470K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
3,400 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$138/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
8 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

Explore the linked construction record and source history

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Apr 21, 2026254 days across supplied datesDec 31, 2026

3 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    10 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    244 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Reese Education Center Renovation

Frenship ISD is renovating the Reese Education Center at 9421 4th Street in Lubbock, a project registered with TDLR in April 2026. The filing identifies the work as the Reese Education Center Renovation, specifically targeting the interior of the cafeteria to create new office and conference space. This alteration includes necessary updates to the fire sprinkler system to ensure the new layouts meet safety standards.

The scope covers 3,400 sq ft of interior work with an estimated cost of $470,000. This places the project at $138 per sq ft, a figure above the county median of $100 for similar renovation filings in Lubbock County. The scheduled build window is 244 days, which is longer than the county median of 123 days for this type of work.

Project Status and Timeline

Construction start is scheduled for May 2026. Plan review is pending, and the project is targeted for December 2026. The TDLR status is listed as Project Registered. This timeline aligns with the filing's completion date, providing a clear endpoint for the renovation activities.

Parkhill serves as the design firm of record for this project. Stephen D Macphie is the registered accessibility specialist ensuring the renovation complies with state accessibility requirements. The project involves public funds and public land, consistent with its status as a school district facility.

Frenship ISD has three other TDLR-registered projects totaling $72,200,000, including the Frenship High School renovation in Wolfforth. Parkhill has six other registered projects totaling $23,421,224, such as the Kress Building in Amarillo. These figures demonstrate the firm's and district's ongoing commitment to infrastructure updates across the region.

Project Registered

Project has been registered with TDLR and is in pre-construction phase

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 79413 (Lubbock)

One email per change. Unsubscribe in one click. Privacy.

Reese Education Center Renovation is a Renovation/Alteration project located at 9421 4th Street, Lubbock, TX 79413 in Lubbock, Texas. The project has an estimated value of $470K covering 3,400 sq ft. Frenship ISD is the property owner and Parkhill is the design firm of record. The project was registered with TDLR on April 21, 2026.

Frequently Asked Questions

When is the Reese Education Center renovation expected to finish?

The project is targeted for December 2026. Construction start is scheduled for May 2026, with plan review pending according to the TDLR filing.

Who is the owner of the Reese Education Center project?

Frenship ISD is the owner and developer of record. The project is located at 9421 4th Street in Lubbock, Texas.

What is the estimated cost of the renovation?

The estimated cost is $470,000. This covers 3,400 sq ft of interior renovation, including office, conference space, and fire sprinkler updates.

Is the Reese Education Center open for public use?

The TDLR record indicates construction is planned to start in May 2026. It does not confirm current business operations or public access status.

Who is the design firm for this project?

Parkhill is the design firm of record. Stephen D Macphie is the registered accessibility specialist for the filing.

What is Reese Education Center Renovation?

Reese Education Center Renovation is a renovation/alteration project at 9421 4th Street in Lubbock, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior Renovation of Cafeteria to include office and conference space, with fire sprinkler updates

Is Reese Education Center Renovation open in Lubbock?

Reese Education Center Renovation is still under construction in Lubbock, TX, with an estimated completion of Dec 2026 according to its TDLR registration.

Where is Reese Education Center Renovation located?

Reese Education Center Renovation is located at 9421 4th Street, Lubbock, TX, 79413, in Lubbock County.

Who is the owner or developer of Reese Education Center Renovation?

Frenship ISD is the property owner/developer of record for Reese Education Center Renovation, per its TDLR project registration.

Who is the architect or design firm for Reese Education Center Renovation?

Parkhill is the design firm of record for Reese Education Center Renovation, according to its TDLR filing.

How much does Reese Education Center Renovation cost and how big is it?

Reese Education Center Renovation has an estimated construction value of $470K and approximately 3,400 square feet (about $138/sqft), based on its TDLR filing.

Scope of Work

Interior Renovation of Cafeteria to include office and conference space, with fire sprinkler updates

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

9421 4th Street, Lubbock, TX, 79413

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.